E02B17/04

ASSEMBLY AND METHOD FOR INSTALLING A PILE INTO A SEABED
20230046101 · 2023-02-16 ·

The present invention relates to an assembly for installing a pile (2) in a seabed (3), the assembly comprising a vessel (23) comprising a positioning system for keeping the vessel (23) at an installation location relative to the seabed, the positioning tem (5) having a positioning stiffness (7); a pile guiding system configured to guide the pile (2) during installation thereof, the pile guiding system comprising a base (9) provided on the vessel; a first guiding device connected to the base, the first guiding device being configured to accommodate the pile during installation thereof; a resilient member (11) for providing a resilient connection between the vessel (23) and the pile during installation thereof for allowing relative motions between the pile (2) and the vessel (23), the resilient member having a connection stiffness, wherein the resilient member (11) is configured and intended to keep a natural period of a pivoting movement of the pile about the seabed caused by waves during installation thereof longer than a dominant wave period of a wave spectrum at the installation location by providing the resilient connection with a low connection stiffness.

A PILE UPENDING AND HOLDING SYSTEM AND METHOD

A pile upending and holding system includes a support assembly configured to be mounted on the vessel and to provide compensation for wave-induced motion of the vessel to maintain a predetermined X-Y location of the pile holder independent of said motion, and a pile holder mounted on the support assembly to be tillable about a substantially horizontal tilt axis. The pile holder includes a lower ring and an upper ring, and a pile holder frame supporting the lower ring and upper ring, the upper ring longitudinally spaced from the lower ring. Each of the rings include pile engaging devices distributed about the circumference thereof, each pile engaging device being adapted to engage an exterior of the pile extending through the lower and upper ring. Each of the lower ring and upper ring includes a ring base fixed to the pile holder frame and one or more movable jaws, movable between a closed position for holding and guiding the pile and an opened position for entry of the pile. The pile holder is provided, below the lower ring thereof, with a pile foot end support for engaging a longitudinal end of the pile to limit longitudinal movement thereof.

OFF-SHORE WIND TURBINE SYSTEM AND METHOD OF INSTALLATION
20230160369 · 2023-05-25 ·

An off-shore wind turbine system is assembled using a platform or jack-up vessel, and a first base anchored to the seafloor at a bade assembly off-shore location. A buoyant tower is attached to the first base. A crane provided on the platform or jack-up vessel is used to lift blades and blades, which are then coupled to a turbine held in a nacelle provided at the top of the buoyant tower. The buoyant tower, the nacelle, and the blades are detached from the first base. The buoyant tower, the nacelle, and the blades are towed to a wind farm and connected to a second base provided in the wind farm. The buoyant tower, the nacelle, and the blades are further stabilized using mooring lines spanning between the buoyant towers and other bases provided in the wind farm. The first base and/or the second base include anti-rotation features.

Temporarily coupling between jacket and pile

The invention relates to a method for coupling a jacket with a foundation pile, comprising; mounting a first flange with the jacket, contacting a second flange with the foundation pile such that the second flange is supported by the foundation pile, mutually positioning the first flange and the second flange such that the jacket may be supported by the pile through the first flange and the second flange, arranging an inflatable spacing member between the first flange and second flange such that the spacing member contacts both the first flange and second flange for supporting the jacket through the spacing member.

SUPPORT DEVICE CONFIGURED TO BE POSITIONED ON A LIFTING VESSEL IN ORDER TO LIFT A TOPSIDE FROM ITS SUPPORT STRUCTURE

A support device configured to be positioned on a lifting vessel in order to support a topside of an offshore platform, the support device comprising: a main cylindrical casing having an upper opening, the main casing defining a main vertical axis, the main casing further defining an upper support rim, a reservoir located inside the main casing for holding a granular material or a fluid, the reservoir having a discharge opening for emptying the reservoir, a spring support slideably arranged within the main casing, the spring support resting on the granular material or the fluid and being movable from an upper position to a lower position in dependence on a filing degree of the reservoir, a spring device positioned on the spring support, a receptor support positioned on the spring device, the receptor support defining an upper surface, and a receptor device.

System and method for dynamically balancing loads on legs supporting a jack up rig platform
11674281 · 2023-06-13 · ·

A system is disclosed including but not limited to a a jack up processor in data communication with each for dynamically balancing loads in real time on a plurality of legs supporting a jack up rig platform having a plurality of gear box motors on the plurality of legs. A processor reads data from sensors on gear box motors on the legs and selects a stored torque profile from a computer readable medium based on the load data from the sensors; and sends the torque profile to the plurality of gearboxes. A computer readable medium and neural network are disclosed for dynamically balancing loads on the plurality of legs in real time.

System and method for dynamically balancing loads on legs supporting a jack up rig platform
11674281 · 2023-06-13 · ·

A system is disclosed including but not limited to a a jack up processor in data communication with each for dynamically balancing loads in real time on a plurality of legs supporting a jack up rig platform having a plurality of gear box motors on the plurality of legs. A processor reads data from sensors on gear box motors on the legs and selects a stored torque profile from a computer readable medium based on the load data from the sensors; and sends the torque profile to the plurality of gearboxes. A computer readable medium and neural network are disclosed for dynamically balancing loads on the plurality of legs in real time.

Drill floor support structures

The present disclosure relates to a modular drilling cellar configured to be arranged beneath a drill floor of a drilling rig. The cellar may have a housing for storing well head equipment and a drill floor support structure. The drill floor support structure may have a pair of support legs, each leg may have an extension portion, a column portion, and a bearing foot. Each of the extension portion and column portion may be configured to be arranged in a reading position and an operating position.

Off-shore wind turbine system and method of installation

An off-shore wind turbine system is assembled using a platform or jack-up vessel, and a first base anchored to the seafloor at a bade assembly off-shore location. A buoyant tower is attached to the first base. A crane provided on the platform or jack-up vessel is used to lift blades and blades, which are then coupled to a turbine held in a nacelle provided at the top of the buoyant tower. The buoyant tower, the nacelle, and the blades are detached from the first base. The buoyant tower, the nacelle, and the blades are towed to a wind farm and connected to a second base provided in the wind farm. The buoyant tower, the nacelle, and the blades are further stabilized using mooring lines spanning between the buoyant towers and other bases provided in the wind farm. The first base and/or the second base include anti-rotation features.

System and Method for Dynamically Balancing Loads on Legs Supporting a Jack Up Rig Platform
20230265626 · 2023-08-24 · ·

A system is disclosed including but not limited to a a jack up processor in data communication with each for dynamically balancing loads in real time on a plurality of legs supporting a jack up rig platform having a plurality of gear box motors on the plurality of legs. A processor reads data from sensors on gear box motors on the legs and selects a stored torque profile from a computer readable medium based on the load data from the sensors; and sends the torque profile to the plurality of gearboxes. A computer readable medium and neural network are disclosed for dynamically balancing loads on the plurality of legs in real time.