E02B7/02

Precast dam structure with flowpath

A precast dam structure includes at least two precast segments coupled together via linkages and a flow path structure. The flow path structure defines a flow path having an intake port and a draft port and is associated with at least one of the at least two precast segments. The flow path structure is configured to provide a change in flow direction, either internally or externally, from the at least one of the at least two precast segments.

Precast dam structure with flowpath

A precast dam structure includes at least two precast segments coupled together via linkages and a flow path structure. The flow path structure defines a flow path having an intake port and a draft port and is associated with at least one of the at least two precast segments. The flow path structure is configured to provide a change in flow direction, either internally or externally, from the at least one of the at least two precast segments.

METHOD FOR PREVENTION AND CONTROL OF SUPER LARGE-SCALE FLOODS AND DEBRIS FLOWS

The invention provides a method for preventing super large-scale floods and debris flows. First, the scale corresponding to certain standard floods in the watershed is evaluated based on field investigations and historical data. Second, the design standards of the system are chosen based on the prevention of super large-scale floods, and the design standard of critical control engineering is further determined. Finally, the design methods of check dams with different functional zones are proposed according to the design standards of critical control engineering. The invention allows part of the key control dam to fail under safe operating conditions of the entire system by increasing the cross-sectional areas and the flow discharges. The unbroken foundation of the dam can effectively control the channel entrainment and regulate the cross-sectional discharge. The design is helpful in mitigating giant floods and debris flows, thus protecting downstream infrastructures.

PREVENTION METHOD FOR FLOODS AND DEBRIS FLOWS CAUSED BY GLACIAL LAKE OUTBURSTS

The method for preventing and controlling glacial lake outbreak flood and related debris flows by the present invention is mainly controlling the scale of the floods by separating water and rocks and dispersing its energy step by step. The cascading amplification effects of floods can be reduced by controlling the initiation of source material with energy dissipation by using ground sills, groups of piles, and placed large stones and prefabricated artificial structures. The diversion dam built in the downstream area discharge floods in different layers, which can quickly guide water to the main river. The preconstructed engineering system can be used in a timely manner to prevent and control floods and debris flows induced by a sudden outburst of glacial lakes in areas with important facilities and inhabitants enduring the risk of natural hazards. Prevention and control systems can separate floods and debris flows and dissipate their energy. The groups of ground sills and check dams gradually dissipate the energy of floods, prevent high-energy boulders, and control the initiation of source materials in the channel and bank. Moreover, the systems can also separate the water and rocks in dilute debris flows or debris flows with high bulk densities but low viscosities. The diversion dams also enhance the separation function and keep the flood and debris flow discharge in the lower and upper channel to the main river.

PREVENTION METHOD FOR FLOODS AND DEBRIS FLOWS CAUSED BY GLACIAL LAKE OUTBURSTS

The method for preventing and controlling glacial lake outbreak flood and related debris flows by the present invention is mainly controlling the scale of the floods by separating water and rocks and dispersing its energy step by step. The cascading amplification effects of floods can be reduced by controlling the initiation of source material with energy dissipation by using ground sills, groups of piles, and placed large stones and prefabricated artificial structures. The diversion dam built in the downstream area discharge floods in different layers, which can quickly guide water to the main river. The preconstructed engineering system can be used in a timely manner to prevent and control floods and debris flows induced by a sudden outburst of glacial lakes in areas with important facilities and inhabitants enduring the risk of natural hazards. Prevention and control systems can separate floods and debris flows and dissipate their energy. The groups of ground sills and check dams gradually dissipate the energy of floods, prevent high-energy boulders, and control the initiation of source materials in the channel and bank. Moreover, the systems can also separate the water and rocks in dilute debris flows or debris flows with high bulk densities but low viscosities. The diversion dams also enhance the separation function and keep the flood and debris flow discharge in the lower and upper channel to the main river.

BARRAGE WITH FUNCTION OF COLLECTING FLOATING GARBAGE ON WATER SURFACE
20230065521 · 2023-03-02 ·

A barrage with a function of collecting floating garbage on a water surface is provided. It includes a first dam body as a main body of the barrage provided with multiple built-in low water level drainage channels and high water level drainage channels, a second dam body provided with multiple notches for converging floating garbage on the water surface, a garbage collecting and storing equipment arranged between the first dam body and the second dam body and a solar power generating equipment. The garbage collecting and storing equipment maintains running of the garbage conveyor belt by utilizing electric energy provided by the solar power generating equipment, thereby collecting garbage in a garbage pool beside the barrage. It not only has conventional functions of the barrage, but also greatly saves cost of manually salvaging garbage and avoids water pollution caused by accumulation of garbage on the river surface.

BARRAGE WITH FUNCTION OF COLLECTING FLOATING GARBAGE ON WATER SURFACE
20230065521 · 2023-03-02 ·

A barrage with a function of collecting floating garbage on a water surface is provided. It includes a first dam body as a main body of the barrage provided with multiple built-in low water level drainage channels and high water level drainage channels, a second dam body provided with multiple notches for converging floating garbage on the water surface, a garbage collecting and storing equipment arranged between the first dam body and the second dam body and a solar power generating equipment. The garbage collecting and storing equipment maintains running of the garbage conveyor belt by utilizing electric energy provided by the solar power generating equipment, thereby collecting garbage in a garbage pool beside the barrage. It not only has conventional functions of the barrage, but also greatly saves cost of manually salvaging garbage and avoids water pollution caused by accumulation of garbage on the river surface.

METHOD FOR CONSTRUCTING DAM INSIDE DUMP OF INNER-DUMP STRIP MINE

A method for constructing a dam inside a dump of an inner-dump strip mine includes: taking an upper surface connection line of a primary water-resisting layer as upper filling reference datum boundary of an artificial water-resisting layer; arranging a dam foundation pit and a trapezoidal abutment on a midline of the dam foundation pit; building and reinforcing a step-shaped retaining dam core wall on the artificial water-resisting layer; laying a foundation impervious layer, waterproof geotextile, and an earth blanket on one side, close to the primary aquifer, of the retaining dam core wall; strengthening advance of a dumping working face on one side, away from the primary aquifer, of the retaining dam core wall, and dumping overburden of a strip mine to form a support; filling a space between the earth blanket and the primary aquifer to form a blocker; and proceeding with construction and forming a continuous retaining dam.

METHOD FOR CONSTRUCTING DAM INSIDE DUMP OF INNER-DUMP STRIP MINE

A method for constructing a dam inside a dump of an inner-dump strip mine includes: taking an upper surface connection line of a primary water-resisting layer as upper filling reference datum boundary of an artificial water-resisting layer; arranging a dam foundation pit and a trapezoidal abutment on a midline of the dam foundation pit; building and reinforcing a step-shaped retaining dam core wall on the artificial water-resisting layer; laying a foundation impervious layer, waterproof geotextile, and an earth blanket on one side, close to the primary aquifer, of the retaining dam core wall; strengthening advance of a dumping working face on one side, away from the primary aquifer, of the retaining dam core wall, and dumping overburden of a strip mine to form a support; filling a space between the earth blanket and the primary aquifer to form a blocker; and proceeding with construction and forming a continuous retaining dam.

Barrage with function of collecting floating garbage on water surface

A barrage with a function of collecting floating garbage on a water surface is provided. It includes a first dam body as a main body of the barrage provided with multiple built-in low water level drainage channels and high water level drainage channels, a second dam body provided with multiple notches for converging floating garbage on the water surface, a garbage collecting and storing equipment arranged between the first dam body and the second dam body and a solar power generating equipment. The garbage collecting and storing equipment maintains running of the garbage conveyor belt by utilizing electric energy provided by the solar power generating equipment, thereby collecting garbage in a garbage pool beside the barrage. It not only has conventional functions of the barrage, but also greatly saves cost of manually salvaging garbage and avoids water pollution caused by accumulation of garbage on the river surface.