DEVICES AND METHODS FOR INSTALLING PILES INTO THE GROUND OR SEABED
The present invention relates to a support structure for supporting a top structure, in particular a wind turbine, above the ground or a seabed, the support structure comprising: one single support pile having a length and a first outer diameter, the one single support pile comprising an upper part configured and intended to extend above the ground or the seabed, wherein the upper part of the support pile is configured to be connected to the top structure; a lower part configured to be in contact with the ground or seabed, wherein the support pile is configured to exert an upward vertical force on the top structure in order to carry the top structure; a plurality of foundation guides connected to the lower part of the single support pile, each foundation guide having an opening extending in a direction of the support pile.
Device for removal of sediment from inside piles
Device for removal of sediment from inside piles being at least partly immersed in water, comprising an outer guiding unit arranged to be temporarily positioned on the top of a pile. The outer guiding unit envelopes at least one inner dredging unit being arranged to be lowered from within the outer guiding unit, the inner dredging unit at its lower end exhibiting movable jet nozzles arranged to loosen sediment. The inner dredging unit furthermore comprises a central passage which is connected to a discharge hose arranged to transport loosened sediment therefrom.
Device for removal of sediment from inside piles
Device for removal of sediment from inside piles being at least partly immersed in water, comprising an outer guiding unit arranged to be temporarily positioned on the top of a pile. The outer guiding unit envelopes at least one inner dredging unit being arranged to be lowered from within the outer guiding unit, the inner dredging unit at its lower end exhibiting movable jet nozzles arranged to loosen sediment. The inner dredging unit furthermore comprises a central passage which is connected to a discharge hose arranged to transport loosened sediment therefrom.
Device for Removal of Sediment From Inside Piles
Device for removal of sediment from inside piles being at least partly immersed in water, comprising an outer guiding unit arranged to be temporarily positioned on the top of a pile. The outer guiding unit envelopes at least one inner dredging unit being arranged to be lowered from within the outer guiding unit, the inner dredging unit at its lower end exhibiting movable jet nozzles arranged to loosen sediment. The inner dredging unit furthermore comprises a central passage which is connected to a discharge hose arranged to transport loosened sediment therefrom.
CONSTRUCTION METHOD FOR REMOVING MUD IN JACKET STEEL PIPE PILE
A construction method for removing mud in a jacket steel pipe pile includes: erecting a piling auxiliary platform, and performing underwater steel pipe pile sinking; measuring an elevation of a mud surface in the underwater steel pipe pile, and calculating a height from the mud surface in the pile to a pile top and a needed mud removing depth according to the measurement result; installing mud removing equipment on the steel pipe pile; starting the mud removing equipment to carry out mud removing operation, and in a case that the mud removing depth is reached, pausing the mud removing equipment, and cleaning an inner wall of the steel pipe pile; and in a case that the mud removing operation is not reach the related elevation, repeating the mud removing operation till the mud removing operation reaches a standard.
CONSTRUCTION METHOD FOR REMOVING MUD IN JACKET STEEL PIPE PILE
A construction method for removing mud in a jacket steel pipe pile includes: erecting a piling auxiliary platform, and performing underwater steel pipe pile sinking; measuring an elevation of a mud surface in the underwater steel pipe pile, and calculating a height from the mud surface in the pile to a pile top and a needed mud removing depth according to the measurement result; installing mud removing equipment on the steel pipe pile; starting the mud removing equipment to carry out mud removing operation, and in a case that the mud removing depth is reached, pausing the mud removing equipment, and cleaning an inner wall of the steel pipe pile; and in a case that the mud removing operation is not reach the related elevation, repeating the mud removing operation till the mud removing operation reaches a standard.
Construction method for removing mud in jacket steel pipe pile
A construction method for removing mud in a jacket steel pipe pile includes: erecting a piling auxiliary platform, and performing underwater steel pipe pile sinking; measuring an elevation of a mud surface in the underwater steel pipe pile, and calculating a height from the mud surface in the pile to a pile top and a needed mud removing depth according to the measurement result; installing mud removing equipment on the steel pipe pile; starting the mud removing equipment to carry out mud removing operation, and in a case that the mud removing depth is reached, pausing the mud removing equipment, and cleaning an inner wall of the steel pipe pile; and in a case that the mud removing operation is not reach the related elevation, repeating the mud removing operation till the mud removing operation reaches a standard.
Construction method for removing mud in jacket steel pipe pile
A construction method for removing mud in a jacket steel pipe pile includes: erecting a piling auxiliary platform, and performing underwater steel pipe pile sinking; measuring an elevation of a mud surface in the underwater steel pipe pile, and calculating a height from the mud surface in the pile to a pile top and a needed mud removing depth according to the measurement result; installing mud removing equipment on the steel pipe pile; starting the mud removing equipment to carry out mud removing operation, and in a case that the mud removing depth is reached, pausing the mud removing equipment, and cleaning an inner wall of the steel pipe pile; and in a case that the mud removing operation is not reach the related elevation, repeating the mud removing operation till the mud removing operation reaches a standard.