Patent classifications
E02D2300/0006
EXTENSIBLE SHELLS AND RELATED METHODS FOR CONSTRUCTING A DUCTILE SUPPORT PIER
Extensible shells and related methods for constructing a support pier are disclosed. An extensible shell can define an interior for holding granular construction material and define a first opening at a first end for receiving the granular construction material into the interior and a second opening at a second end. The extensible shell can be flexible such that the shell expands when granular construction material is compacted in the interior of the shell. A method may include positioning the extensible shell in the ground and filling at least a portion of the interior of the shell with the granular construction material. The granular construction material may be compacted in the interior of the extensible shell to form a support pier.
ROCK ANCHOR FOUNDATION STRUCTURE SUITABLE FOR MOUNTAIN PHOTOVOLTAIC MODULE AND CONSTRUCTION METHOD OF ROCK ANCHOR FOUNDATION STRUCTURE
The present invention relates to a rock anchor foundation structure suitable for a mountain photovoltaic module and a construction method of the rock anchor foundation structure. A technical solution of the present invention is as follows: the rock anchor foundation structure comprises a drill hole drilled in a rock slope, an anchor rod module arranged in the drill hole and a photovoltaic power station module. The photovoltaic power station module is connected with the anchor rod module through a hollow connecting steel pipe; the photovoltaic power station module comprises a bracket welded on the top of the hollow connecting steel pipe, a beam mutually hinged with the top of the bracket and a photovoltaic cell panel arranged at the upper part of the beam. The rock anchor foundation structure of the present invention is suitable for the technical fields of around treatment and foundation engineering design.
Wall element system and method and apparatus for constructing shoring walls
A caisson or casing 107 for installing a sheet 102/103 into a ground or underwater location, the caisson 107 having a shaped wall 107.1, which is open for a predetermined length and is adapted to receive and connect to an excavation means 3 within the confines of the caisson or casing 107. In at least one embodiment, the system includes a drilling assembly 3 for insertion of a caisson or casing 1, the drilling assembly 3 having one or more expanding drill bits 4 which are adapted to be driven by a drilling or rotation motive device 5, the expanding drill bits 4 being adapted to be arranged with respect to the caisson or casing 1 in use, so as form a hole or bore which substantially conforms to, or substantially overlaps with, the shape of the caisson or casing 1.
Geogrids
A geogrid in the form of an integral, mesh structure includes molecularly orientated polymeric material, with the integral, mesh structure being formed of interconnecting mesh defining elements including elongate tensile elements. The molecular orientation of the integral, mesh structure is uniform throughout the extent thereof.
Connector for soil reinforcing and method of manufacturing
An apparatus, system and method of connecting an earthen formation to a facing of a mechanically stabilized earth (MSE) structure in which a connector includes a single piece of wire that defines an opening for coupling the connector to an anchor and a pair parallel legs for mechanically connecting the to a soil reinforcing element.
Building foundation and soil stabilization method and system
System and means soil stabilization and moisture control for building foundations including methods and systems for stabilization moisture in a site for building foundation by applying soil moisture stabilization material in various forms, a preferred stabilization material being a mixture of aluninosilicate Pozzolan mineral and granular material such as sand.
Trough plate for constructing locked polymer anti-seepage wall and construction method of locked polymer anti-seepage wall
A trough plate for constructing a locked polymer anti-seepage wall includes a plate body, a guide tube, a grouting pipe and an anti-blocking head. A construction method of the locked polymer anti-seepage wall includes the steps of positioning an N.sup.th trough plate and then pressing the N.sup.th trough plate into ground, wherein N is a natural number larger than and equal to 1; engaging an (N+1).sup.th trough plate with the N.sup.th trough plate, and then pressing the (N+1).sup.th trough plate into the ground; connecting a grouting pipe of the N.sup.th trough plate with a grouting machine, pulling out the N.sup.th trough plate, and simultaneously grouting through the grouting pipe of the N.sup.th trough plate by the grouting machine; and repeating the steps (B) and (C) till the locked polymer anti-seepage wall is completed, wherein the steps (B) and (C) are repeated every time, N is automatically increased by 1.
Erosion control apparatus
The present invention relates to an erosion control apparatus and methods of using and installing the apparatus. The apparatus is constructed to prevent erosion of soil during typical weather or tidal conditions and adverse weather events. The apparatus can include a plurality of anchored rolls and soil lifts operative to stabilize the shoreline.
SEAWALL CONSTRUCTION USING CONCRETE FORMS
A method for constructing a seawall section includes coupling an end of a substantially-waterproof barrier member to a footing. A concrete form is mounted to the footing such that a top end of the form is higher than an exposed upper surface of the footing. The concrete form defines at least part of a fill volume. Another end of the barrier member is coupled to the concrete form such that the barrier member extends over a side of the concrete form opposite the fill volume. Concrete is then poured into the fill volume and cured to form the seawall section. Prior to the curing, a body of water at the footing may be higher than the upper surface of the footing. However, the barrier member prevents water from entering the fill volume through the concrete form.
Extensible shells and related methods for constructing a ductile support pier
Extensible shells and related methods for constructing a support pier are disclosed. An extensible shell can define an interior for holding granular construction material and define a first opening at a first end for receiving the granular construction material into the interior and a second opening at a second end. The extensible shell can be flexible such that the shell expands when granular construction material is compacted in the interior of the shell. A method may include positioning the extensible shell in the ground and filling at least a portion of the interior of the shell with the granular construction material. The granular construction material may be compacted in the interior of the extensible shell to form a support pier.