E02D2300/0071

Ecological Remediation Method for Controlling Sulphur Pollution inBlack and Odorous Sludge of Rivers
20180002209 · 2018-01-04 ·

The Invention discloses an ecological remediation method for controlling sulphur pollution in black and odorous sludge of rivers. Firstly, the sludge from pollution layer of the rivers will be dredged and stacked on the banksides with slope protection built along the outer edge of the sludge storage site; then innocent pretreatment will be conducted for the sludge. Specific steps comprise solarization and ploughing, and mixed ameliorant of certain proportion will be added for modification between first solarization and intermittent ploughing. Then, large emergent aquatic plants will be planted on the stacked sludge after pretreatment. The technical method provided by the Invention may control the release of acid-volatile sulfide in the contaminated sludge on one hand and reduce concentration of volatile organic sulfide in the waters on the other hand. With simple technical process and strong operable technology, the Invention meets the current requirements for controlling sulphur pollution in black and odorous sludge of rivers in China and facilitates realizing the goal of long-term control of sulphur pollution in the deposit of the waters.

Erosion control apparatus
11492771 · 2022-11-08 · ·

The present invention relates to an erosion control apparatus and methods of using and installing the apparatus. The apparatus is constructed to prevent erosion of soil during typical weather or tidal conditions and adverse weather events. The apparatus can include a plurality of anchored rolls and soil lifts operative to stabilize the shoreline.

UTILITY COVER

A cover for an underground enclosure may include an upper surface comprising a pattern of bosses, a first slot and a second slot disposed on the upper surface, a lower surface opposite the upper surface. A first reinforcement member may be coupled to the lower surface. The first slot may extend into the first reinforcement member, and a second reinforcement member may be coupled to the lower surface and aligned with the first reinforcement member. The second slot may extend into the second reinforcement member. The cover may be configured to be lifted by the first slot and the second slot.

Method and Device for Pre-Casting Conduit Holes in Building Foundations
20220349142 · 2022-11-03 ·

A method of constructing multiple conduits in building foundations that eliminates the process of core drilling after the foundation has been poured and set. This method creates optional openings for possible future connections. The process uses removable conduit molds installed before the foundation is poured. Once the foundation has set, conduit molds are removed to explose conduits in the foundation as needed.

Bio-inspired deep foundation pile and anchorage system

An expanding anchor and/or pile system wherein an outer shell of the pile/anchor is split lengthwise into at least two pieces and can be placed or driven into a hole in the earth in a retracted state and can subsequently be expanded such that the two or more pieces are forced outwardly—away from one another, thus causing them to exert a lateral force against the sides of the hole and thereby resulting in greater axial load carrying capacity in tension or compression of the anchor/pile.

Utility cover

A cover for an underground enclosure may include an upper surface and may include a pattern of bosses, and a first slot and a second slot each disposed on the upper surface. The cover may also include a lower surface opposite the upper surface. A first rib or reinforcement member may be coupled to the lower surface. The first slot may extend into the first rib or reinforcement member. A second rib or reinforcement member may be coupled to the lower surface and aligned with the first rib or reinforcement member. The second slot may extend into the second rib or reinforcement member. The cover may be configured to be lifted by the first slot and the second slot.

EROSION CONTROL APPARATUS
20230175222 · 2023-06-08 ·

The present invention relates to an erosion control apparatus and methods of using and installing the apparatus. The apparatus is constructed to prevent erosion of soil during typical weather or tidal conditions and adverse weather events. The apparatus can include a plurality of anchored rolls and soil lifts operative to stabilize the shoreline.

CLOSURE SYSTEMS, DEBRIS CAPS, HOLDER DEVICES, AND RELATED TECHNOLOGIES
20170328024 · 2017-11-16 ·

A cap assembly can include a cap holder device with a plug member and a cap holder. The cap holder device is positionable in an end of a conduit positioned along a roadway. The cap holder is carried by the plug member and includes a magnetic element and a connector. The connector is connectable to the magnetic element to the plug member such that the magnetic element is movable relative to the plug member so as to position the magnetic element for releasably holding a cap that covers the end of the conduit when the plug member is positioned in the conduit. The cap assembly can be a debris cap insertable in a conduit, an end of a pipe, or other opening.

Thermal Insulation Material from Mycelium and Forestry Byproducts
20170218327 · 2017-08-03 ·

Disclosed are biodegradable insulation materials comprising a structural scaffold; and at least one temperature resilient fungus. Also disclosed are methods of making and using biodegradable insulation materials comprising a structural scaffold; and at least one temperature resilient fungus. For example, disclosed are methods of insulating an infrastructure comprising administering the disclosed biodegradable insulation materials to an infrastructure.

Method and Device for Pre-Casting Conduit Holes in Building Foundations
20230287643 · 2023-09-14 ·

A method of constructing multiple conduits in building foundations that eliminates the process of core drilling after the foundation has been poured and set. This method creates optional openings for possible future connections. The process uses removable conduit molds installed before the foundation is poured. Once the foundation has set, conduit molds are removed to explose conduits in the foundation as needed.