E02D27/38

Built-in valve chamber of tank completely covered with soil

The present disclosure relates to a soil completely-covered tank system with a built-in valve chamber. The valve chamber includes a spherical tank body, a valve chamber, and a channel; an exterior of the spherical tank body is completely covered with soil, and the spherical tank body is supported by a stand column and is arranged on the ground, such that a gap is formed between the bottom of the spherical tank body and a ground foundation; the valve chamber is arranged between the spherical tank body and the ground foundation; a top opening of the valve chamber is connected to the bottom of the spherical tank body by means of a first connecting structure.

Built-in valve chamber of tank completely covered with soil

The present disclosure relates to a soil completely-covered tank system with a built-in valve chamber. The valve chamber includes a spherical tank body, a valve chamber, and a channel; an exterior of the spherical tank body is completely covered with soil, and the spherical tank body is supported by a stand column and is arranged on the ground, such that a gap is formed between the bottom of the spherical tank body and a ground foundation; the valve chamber is arranged between the spherical tank body and the ground foundation; a top opening of the valve chamber is connected to the bottom of the spherical tank body by means of a first connecting structure.

Fully soil-covered structure of vertical tank body

A soil completely-covered structure includes a base layer, slope body filling soil and a buffering layer; the base layer is arranged around a vertical tank body and is made of a base material located on a ground floor, and a first filling gap is formed between the base layer and an outer wall of the vertical tank body; the slope body filling soil is arranged on the base layer, a second filling gap is formed between the side of the slope body filling soil and the outer wall of the vertical tank body, and a side slope surface is formed on the outer side of the slope body filling soil; and the buffering layer is formed in the first filling gap and the second filling gap, and the buffering material fills the first filling gap and the second filling gap to wrap the surface of the vertical tank body.

Fully soil-covered structure of vertical tank body

A soil completely-covered structure includes a base layer, slope body filling soil and a buffering layer; the base layer is arranged around a vertical tank body and is made of a base material located on a ground floor, and a first filling gap is formed between the base layer and an outer wall of the vertical tank body; the slope body filling soil is arranged on the base layer, a second filling gap is formed between the side of the slope body filling soil and the outer wall of the vertical tank body, and a side slope surface is formed on the outer side of the slope body filling soil; and the buffering layer is formed in the first filling gap and the second filling gap, and the buffering material fills the first filling gap and the second filling gap to wrap the surface of the vertical tank body.

Fabric children's wading pool and method of use
11549276 · 2023-01-10 ·

A foldable, portable fabric children's wading pool for installation in the ground and which has improved stability characteristics is provided. The pool includes a base region with a generally circular sheet of water-resistant woven fabric with a thread denier of between 400 denier and 600 denier, a stabilizer region comprising one or more sections of woven fabric with a thread denier of between 200 denier and 400 denier, where the stabilizer region is affixed to the outer edge of the base region, and with a number of sand anchors affixed to the stabilizer region. The pool is set up by digging a hole in the ground and forming berms along the edges of the hole. Then, the pool is unfolded and positioned such that the waterproof fabric base is in the hole, and the sand anchor section extends downwardly and outwardly from the edge of the sand berm. Then, a weighting material is loaded onto the sand anchor section and the pool is filled with water, preferably using the waterproof bag that also serves as a storage and transport bag for the pool when folded.

Fabric children's wading pool and method of use
11549276 · 2023-01-10 ·

A foldable, portable fabric children's wading pool for installation in the ground and which has improved stability characteristics is provided. The pool includes a base region with a generally circular sheet of water-resistant woven fabric with a thread denier of between 400 denier and 600 denier, a stabilizer region comprising one or more sections of woven fabric with a thread denier of between 200 denier and 400 denier, where the stabilizer region is affixed to the outer edge of the base region, and with a number of sand anchors affixed to the stabilizer region. The pool is set up by digging a hole in the ground and forming berms along the edges of the hole. Then, the pool is unfolded and positioned such that the waterproof fabric base is in the hole, and the sand anchor section extends downwardly and outwardly from the edge of the sand berm. Then, a weighting material is loaded onto the sand anchor section and the pool is filled with water, preferably using the waterproof bag that also serves as a storage and transport bag for the pool when folded.

BUILT-IN VALVE CHAMBER OF TANK COMPLETELY COVERED WITH SOIL

The present disclosure relates to a soil completely-covered tank system with a built-in valve chamber. The valve chamber includes a spherical tank body, a valve chamber, and a channel; an exterior of the spherical tank body is completely covered with soil, and the spherical tank body is supported by a stand column and is arranged on the ground, such that a gap is formed between the bottom of the spherical tank body and a ground foundation; the valve chamber is arranged between the spherical tank body and the ground foundation; a top opening of the valve chamber is connected to the bottom of the spherical tank body by means of a first connecting structure.

BUILT-IN VALVE CHAMBER OF TANK COMPLETELY COVERED WITH SOIL

The present disclosure relates to a soil completely-covered tank system with a built-in valve chamber. The valve chamber includes a spherical tank body, a valve chamber, and a channel; an exterior of the spherical tank body is completely covered with soil, and the spherical tank body is supported by a stand column and is arranged on the ground, such that a gap is formed between the bottom of the spherical tank body and a ground foundation; the valve chamber is arranged between the spherical tank body and the ground foundation; a top opening of the valve chamber is connected to the bottom of the spherical tank body by means of a first connecting structure.

FULLY SOIL-COVERED STRUCTURE OF VERTICAL TANK BODY

A soil completely-covered structure includes a base layer, slope body filling soil and a buffering layer; the base layer is arranged around a vertical tank body and is made of a base material located on a ground floor, and a first filling gap is formed between the base layer and an outer wall of the vertical tank body; the slope body filling soil is arranged on the base layer, a second filling gap is formed between the side of the slope body filling soil and the outer wall of the vertical tank body, and a side slope surface is formed on the outer side of the slope body filling soil; and the buffering layer is formed in the first filling gap and the second filling gap, and the buffering material fills the first filling gap and the second filling gap to wrap the surface of the vertical tank body.

FULLY SOIL-COVERED STRUCTURE OF VERTICAL TANK BODY

A soil completely-covered structure includes a base layer, slope body filling soil and a buffering layer; the base layer is arranged around a vertical tank body and is made of a base material located on a ground floor, and a first filling gap is formed between the base layer and an outer wall of the vertical tank body; the slope body filling soil is arranged on the base layer, a second filling gap is formed between the side of the slope body filling soil and the outer wall of the vertical tank body, and a side slope surface is formed on the outer side of the slope body filling soil; and the buffering layer is formed in the first filling gap and the second filling gap, and the buffering material fills the first filling gap and the second filling gap to wrap the surface of the vertical tank body.