E02D5/12

Trough plate for constructing locked polymer anti-seepage wall and construction method of locked polymer anti-seepage wall

A trough plate for constructing a locked polymer anti-seepage wall includes a plate body, a guide tube, a grouting pipe and an anti-blocking head. A construction method of the locked polymer anti-seepage wall includes the steps of positioning an N.sup.th trough plate and then pressing the N.sup.th trough plate into ground, wherein N is a natural number larger than and equal to 1; engaging an (N+1).sup.th trough plate with the N.sup.th trough plate, and then pressing the (N+1).sup.th trough plate into the ground; connecting a grouting pipe of the N.sup.th trough plate with a grouting machine, pulling out the N.sup.th trough plate, and simultaneously grouting through the grouting pipe of the N.sup.th trough plate by the grouting machine; and repeating the steps (B) and (C) till the locked polymer anti-seepage wall is completed, wherein the steps (B) and (C) are repeated every time, N is automatically increased by 1.

Trough plate for constructing locked polymer anti-seepage wall and construction method of locked polymer anti-seepage wall

A trough plate for constructing a locked polymer anti-seepage wall includes a plate body, a guide tube, a grouting pipe and an anti-blocking head. A construction method of the locked polymer anti-seepage wall includes the steps of positioning an N.sup.th trough plate and then pressing the N.sup.th trough plate into ground, wherein N is a natural number larger than and equal to 1; engaging an (N+1).sup.th trough plate with the N.sup.th trough plate, and then pressing the (N+1).sup.th trough plate into the ground; connecting a grouting pipe of the N.sup.th trough plate with a grouting machine, pulling out the N.sup.th trough plate, and simultaneously grouting through the grouting pipe of the N.sup.th trough plate by the grouting machine; and repeating the steps (B) and (C) till the locked polymer anti-seepage wall is completed, wherein the steps (B) and (C) are repeated every time, N is automatically increased by 1.

Slab fillers and methods for implementing fillers in two-way concrete slabs for building structures
11598091 · 2023-03-07 ·

A slab filler, and method for implementing fillers in a two-way concrete slab for building structures, are disclosed. The filler comprises an upper keeper tray and a lower keeper tray, and a volumetric filling element. The upper keeper tray is attached to a top of the volumetric filling element and the lower keeper tray is attached to a bottom of the volumetric filling element. The filler comprises a plurality of indicators positioned on all corners of the keeper tray to indicate an amount or level of a concrete fed on the filler. The filler further comprises grooves at an end of the spacer, configured to securely hold one or more belts. Spacers and belts are configured to receive one or more rebar. Further, the volumetric filling element is a high-density material, where the filler is incorporated without upper keeper tray and lower keeper tray.

METHOD FOR FORMING A PILE WALL IN GROUND AND A CORRESPONDING PILE WALL
20220282443 · 2022-09-08 · ·

A method for forming a drilled pile wall in ground using a drilling device having a reamer and flushing with a medium to remove drilling waste during drilling, and non-rotating pipe piles equipped with interlocks. A vertical 1 hole is drilled while simultaneously placing a pipe pile in the drill hole. At least one subsequent vertical hole is drilled hole in the ground side by side with the drill hole while simultaneously placing a subsequent pipe pile in the subsequent drill hole while the interlocks of the subsequent pipe pile interlock with interlocks of the pipe pile to guide the subsequent pipe pile into the drill hole. Reinforcements are installed in the drill holes, concrete is cast into each pipe pile to form a concrete pile, and at least some of the pipe piles are lifted at least partly out of the drill hole after the concrete has been cast, but before the concrete has bonded rigid to form a unified watertight pile wall. The invention also relates to a pile wall.

METHOD FOR FORMING A PILE WALL IN GROUND AND A CORRESPONDING PILE WALL
20220282443 · 2022-09-08 · ·

A method for forming a drilled pile wall in ground using a drilling device having a reamer and flushing with a medium to remove drilling waste during drilling, and non-rotating pipe piles equipped with interlocks. A vertical 1 hole is drilled while simultaneously placing a pipe pile in the drill hole. At least one subsequent vertical hole is drilled hole in the ground side by side with the drill hole while simultaneously placing a subsequent pipe pile in the subsequent drill hole while the interlocks of the subsequent pipe pile interlock with interlocks of the pipe pile to guide the subsequent pipe pile into the drill hole. Reinforcements are installed in the drill holes, concrete is cast into each pipe pile to form a concrete pile, and at least some of the pipe piles are lifted at least partly out of the drill hole after the concrete has been cast, but before the concrete has bonded rigid to form a unified watertight pile wall. The invention also relates to a pile wall.

SLAB FILLERS AND METHODS FOR IMPLEMENTING FILLERS IN TWO-WAY CONCRETE SLABS FOR BUILDING STRUCTURES
20210317659 · 2021-10-14 ·

A slab filler, and method for implementing fillers in a two-way concrete slab for building structures, are disclosed. The filler comprises an upper keeper tray and a lower keeper tray, and a volumetric filling element. The upper keeper tray is attached to a top of the volumetric filling element and the lower keeper tray is attached to a bottom of the volumetric filling element. The filler comprises a plurality of indicators positioned on all corners of the keeper tray to indicate an amount or level of a concrete fed on the filler. The filler further comprises grooves at an end of the spacer, configured to securely hold one or more belts. Spacers and belts are configured to receive one or more rebar. Further, the volumetric filling element is a high-density material, where the filler is incorporated without upper keeper tray and lower keeper tray.

Trough plate for constructing locked polymer anti-seepage wall and construction method of locked polymer anti-seepage wall

A trough plate for constructing a locked polymer anti-seepage wall includes a plate body, a guide tube, a grouting pipe and an anti-blocking head. A construction method of the locked polymer anti-seepage wall includes the steps of positioning an N.sup.th trough plate and then pressing the N.sup.th trough plate into ground, wherein N is a natural number larger than and equal to 1; engaging an (N+1).sup.th trough plate with the N.sup.th trough plate, and then pressing the (N+1).sup.th trough plate into the ground; connecting a grouting pipe of the N.sup.th trough plate with a grouting machine, pulling out the N.sup.th trough plate, and simultaneously grouting through the grouting pipe of the N.sup.th trough plate by the grouting machine; and repeating the steps (B) and (C) till the locked polymer anti-seepage wall is completed, wherein the steps (B) and (C) are repeated every time, N is automatically increased by 1.

Trough plate for constructing locked polymer anti-seepage wall and construction method of locked polymer anti-seepage wall

A trough plate for constructing a locked polymer anti-seepage wall includes a plate body, a guide tube, a grouting pipe and an anti-blocking head. A construction method of the locked polymer anti-seepage wall includes the steps of positioning an N.sup.th trough plate and then pressing the N.sup.th trough plate into ground, wherein N is a natural number larger than and equal to 1; engaging an (N+1).sup.th trough plate with the N.sup.th trough plate, and then pressing the (N+1).sup.th trough plate into the ground; connecting a grouting pipe of the N.sup.th trough plate with a grouting machine, pulling out the N.sup.th trough plate, and simultaneously grouting through the grouting pipe of the N.sup.th trough plate by the grouting machine; and repeating the steps (B) and (C) till the locked polymer anti-seepage wall is completed, wherein the steps (B) and (C) are repeated every time, N is automatically increased by 1.

Sheet pile bulkhead systems and methods

A system that includes a plurality of front faces configured to be arranged end-to-end in a series. Adjacent front faces are connected together by a different X-shaped or X-wye connector that facilitates installation of reinforcement tail walls. At least one tail wall is connected to each connector. A redundant reinforcing tail wall may be constructed and attached to one of the connectors to provide alternative load path(s).

Sheet pile bulkhead systems and methods

A system that includes a plurality of front faces configured to be arranged end-to-end in a series. Adjacent front faces are connected together by a different X-shaped or X-wye connector that facilitates installation of reinforcement tail walls. At least one tail wall is connected to each connector. A redundant reinforcing tail wall may be constructed and attached to one of the connectors to provide alternative load path(s).