E02D5/36

WORKING MACHINE AND METHOD FOR WORKING THE GROUND
20230175327 · 2023-06-08 · ·

The invention relates to a working machine and a method for working the ground with the working machine, having a mast, along which, by means of a positioning means, a power rotary head is moved vertically, by which a telescopic Kelly rod having at least two Kelly bars is displaced and guided, wherein, for the purpose of torque transmission, the Kelly bars are provided on their external and/or internal sides with axially running drive keys as well as locking recesses on the drive keys and/or axial latch elements which are moved into the locking recesses for axially locking the Kelly bars or moved out of the locking recesses for unlocking. According to the invention provision is made in that by means of a control a locking state of the Kelly bars is checked automatically, wherein by the control the positioning means of the power rotary head and/or the main rope winch are actuated so that the Kelly bars are moved axially relative to each other, in that by means of a detection means a movement distance of the Kelly bars with respect to each other and/or an axial force during movement of the Kelly bars are axially detected, and in that depending on the detected movement distance and/or the detected axial force a locking state of the Kelly bars is ascertained by the control.

DISPLACEMENT PILE AND PILE DRIVER ADAPTER
20220162822 · 2022-05-26 ·

A bi-directional swing pile adapter includes a first ring; a first support arm; a second support arm; a first swivel connector to operatively connect the first ring to the first support arm in a swivel manner; a second swivel connector to operatively connect the first ring to the second support arm in a swivel manner; a pile coupling member to enable coupling to a pile; a third swivel connector to operatively connect the first ring to the pile coupling member in a swivel manner; and a fourth swivel connector to operatively connect the first ring to the pile coupling member in a swivel manner.

Construction Method and Device for Execution of a Cast In-Situ Pile with Multiple Diameters Decreasing with Depth
20220145567 · 2022-05-12 ·

This invention is detailing a construction method for a cast in-situ pile having an upper section with a larger diameter and at least one subsequent section with a smaller diameter, and a drilling device equipped with continuous flights which allows the construction of one pile having multiple diameters using the innovative construction method in a single continuous drilling phase while each drilling tool is penetrating through the soil in one pass.

The drilling tool according to the invention has a central hollow space that allows accommodation through it of at least one another smaller diameter drilling tool that can drill continuously and can be coupled by means of a coupling-decoupling device in a specific manner to the other drilling tool in order to act as a fixed assembly, at any given position in relation to the smaller drilling tool length and rotating position.

Construction Method and Device for Execution of a Cast In-Situ Pile with Multiple Diameters Decreasing with Depth
20220145567 · 2022-05-12 ·

This invention is detailing a construction method for a cast in-situ pile having an upper section with a larger diameter and at least one subsequent section with a smaller diameter, and a drilling device equipped with continuous flights which allows the construction of one pile having multiple diameters using the innovative construction method in a single continuous drilling phase while each drilling tool is penetrating through the soil in one pass.

The drilling tool according to the invention has a central hollow space that allows accommodation through it of at least one another smaller diameter drilling tool that can drill continuously and can be coupled by means of a coupling-decoupling device in a specific manner to the other drilling tool in order to act as a fixed assembly, at any given position in relation to the smaller drilling tool length and rotating position.

Method and device for producing a foundation element in the ground
11319688 · 2022-05-03 · ·

The invention relates to a method and a device for producing a foundation element in the ground, wherein a hole is formed in the ground which is filled with a hardenable filling mass in order to form the foundation element. According to the invention provision is made in that prior to the hardening of the filling mass a data carrier is introduced into the hole, on which information on the produced foundation element is stored .

Method and device for producing a foundation element in the ground
11319688 · 2022-05-03 · ·

The invention relates to a method and a device for producing a foundation element in the ground, wherein a hole is formed in the ground which is filled with a hardenable filling mass in order to form the foundation element. According to the invention provision is made in that prior to the hardening of the filling mass a data carrier is introduced into the hole, on which information on the produced foundation element is stored .

Construction method for pouring concrete in karst cave

The present application discloses a construction method for pouring concrete in a karst cave. Concrete streaming is pumped into a hollow passage of a drill stem, then opens the one-way openable sealing cover with a pre-tensioned spring on a reaming drill bit and enters the karst cave to complete pouring of the concrete. When the karst cave is relatively low, low-slump plain concrete mixed with quick-setting agents is injected through a drilling rig and the hollow drill stem to form a concrete pier; when the karst cave is relatively high, the hollow drill stem is sleeved into a thin-walled steel shell, and the thin-walled steel shell is synchronously sunk into the drilled hole while drilling, enters the karst cave and is socketed into a stable rock stratum, then concrete is pumped into the thin-walled steel shell from the bottom of the pile, and finally, a reinforcement cage is inserted to form a cast-in-place pile. Compared with the existing karst cave treatment methods, the construction method according to the present application can greatly reduce the consumption of materials, improve the mechanization of construction, simplify the construction process, shorten the construction period and reduce the engineering cost, and the cast-in-place pile with thin-walled steel shell, formed when the karst cave is relatively high, can further improve the bearing capacity of the foundation.

Construction method for pouring concrete in karst cave

The present application discloses a construction method for pouring concrete in a karst cave. Concrete streaming is pumped into a hollow passage of a drill stem, then opens the one-way openable sealing cover with a pre-tensioned spring on a reaming drill bit and enters the karst cave to complete pouring of the concrete. When the karst cave is relatively low, low-slump plain concrete mixed with quick-setting agents is injected through a drilling rig and the hollow drill stem to form a concrete pier; when the karst cave is relatively high, the hollow drill stem is sleeved into a thin-walled steel shell, and the thin-walled steel shell is synchronously sunk into the drilled hole while drilling, enters the karst cave and is socketed into a stable rock stratum, then concrete is pumped into the thin-walled steel shell from the bottom of the pile, and finally, a reinforcement cage is inserted to form a cast-in-place pile. Compared with the existing karst cave treatment methods, the construction method according to the present application can greatly reduce the consumption of materials, improve the mechanization of construction, simplify the construction process, shorten the construction period and reduce the engineering cost, and the cast-in-place pile with thin-walled steel shell, formed when the karst cave is relatively high, can further improve the bearing capacity of the foundation.

METHOD FOR PRODUCING A FOUNDATION ELEMENT IN THE GROUND AND FOUNDATION ELEMENT
20220298738 · 2022-09-22 · ·

The invention relates to a method for producing a foundation element in the ground, in which a hole is produced in the ground and a hardenable mass is introduced into the hole, which hardens to form the foundation element. According to the invention provision is made in that an insert body is inserted approximately centrally into the hole, the insert body being spaced apart from a circumferential wall of the hole, wherein a ring-shaped intermediate space is formed between the circumferential wall of the hole and the insert body, and in that a hardenable mass is introduced into the ring-shaped intermediate space, which hardens to form a ring-shaped foundation element.

METHOD FOR PRODUCING A FOUNDATION ELEMENT IN THE GROUND AND FOUNDATION ELEMENT
20220298738 · 2022-09-22 · ·

The invention relates to a method for producing a foundation element in the ground, in which a hole is produced in the ground and a hardenable mass is introduced into the hole, which hardens to form the foundation element. According to the invention provision is made in that an insert body is inserted approximately centrally into the hole, the insert body being spaced apart from a circumferential wall of the hole, wherein a ring-shaped intermediate space is formed between the circumferential wall of the hole and the insert body, and in that a hardenable mass is introduced into the ring-shaped intermediate space, which hardens to form a ring-shaped foundation element.