E04B2/704

Beam and bolting construction system and method
11603658 · 2023-03-14 · ·

A beam and bolting construction method and an example dwelling (10) according to the method are provided. The method involves preliminary steps of selecting a site and determining a bolt array (19) and selection of dimensions and materials. Actual construction steps include forming a foundation slab (14) having vertical bolts (18) embedded therein in accordance with the bolt array (19). Alternating layers of beams (B), having aligned bolt bores (52) for receiving the bolts, are successively laid down over the bolts (18), with sides meeting at corners (29) with alternating sides encompassing the corner bolt. Once a desired height is achieved, washers (72) and nuts (78) are placed on the bolts and are tightened to desired pressure levels. The dwelling (10) is formed with beams (42) compressed together by threaded bolts (18) in a bolt array (19).

Stackable building block with vertical center risers
09732519 · 2017-08-15 ·

A building block has opposing like outer members spaced apart by at least two risers as cross members inward from outer member ends leaving a center open with a void between the outer members and the risers. The risers extend from the bottom of the block to above the outer member tops. A continuous tongue projects upward from the top of the outer members parallel thereto along the length of the outer member and mates with grooves along the bottom of a similar outer member stackable thereon for ease of block alignment. A next stacked block is nailed to the risers projecting into its center.

Beam and bolting construction system and method
11203865 · 2021-12-21 · ·

Beam segments made of a somewhat compressible material may be arranged with the top surface of each beam segment substantially in contact with the bottom surface of a next beam segment between a first beam segment and a last beam segment. A plurality of bolt bores extends between the top and bottom surfaces of each of the beam segments in substantial alignment through each of the beam segments. The bolt bores are spaced apart to receive corresponding bolt segments and tightening fasteners compressed between the first beam segment and the last beam segment. The beam segments may be compressed to form a combined beam structure that forms a building structure unit. The combined beam structure may be joined with other combined beam structures to form walls and floors for a building structure.

MODULAR BUILDING

A modular building includes at least one outer wall that includes at least first and second panels aligned end to end at a panel joint. Each panel includes first planks forming a part of the outer wall of the building and second planks forming a first decorative wall fixed to the outer wall. The decorative wall extends substantially perpendicular to the outer wall and terminates beyond the first planks on at least one side of the panel. The space between the first decorative wall of the panel and an adjacent decorative wall of a second panel accommodates a shelving unit or a joint cover strip that covers the panel joint.

Method of joining a nogging to a stud to form a sub-module of a prefabricated building module and use of such method
11766806 · 2023-09-26 · ·

The invention refers to a method of joining a nogging to a stud to form a sub-module of a prefabricated building module. The method comprises the acts of: providing (1000) a stud (2) and orienting the stud with a longitudinal extension of the stud along a first direction (A); providing (2000) a nogging material having a longitudinal extension being greater than an intended length of the nogging, and orienting the nogging material with a longitudinal extension along a second direction (B) being transverse to the first direction (A); moving (3000) a first free end of the nogging material into abutment with a first side surface of the stud (2) and cutting the nogging material to form a first nogging (3a); fixating (5000) and joining the free end of the nogging (3a) with the stud (2); moving (6000) the stud (2) and the first nogging (3a) along the first direction (A); and moving (7000) the free end of the nogging material into abutment with the stud (2); cutting (8000) the nogging material at a distance from the abutment, thereby forming a second nogging (3b); and fixating (9000) and joining the stud (2) and the second nogging (3b).

BEAM AND BOLTING CONSTRUCTION SYSTEM AND METHOD
20220333374 · 2022-10-20 ·

A beam and bolting construction method and an example dwelling (10) according to the method are provided. The method involves preliminary steps of selecting a site and determining a bolt array (19) and selection of dimensions and materials. Actual construction steps include forming a foundation slab (14) having vertical bolts (18) embedded therein in accordance with the bolt array (19). Alternating layers of beams (B), having aligned bolt bores (52) for receiving the bolts, are successively laid down over the bolts (18), with sides meeting at corners (29) with alternating sides encompassing the corner bolt. Once a desired height is achieved, washers (72) and nuts (78) are placed on the bolts and are tightened to desired pressure levels. The dwelling (10) is formed with beams (42) compressed together by threaded bolts (18) in a bolt array (19).

Beam and bolting construction system and method
11377846 · 2022-07-05 · ·

A beam and bolting construction method and an example dwelling (10) according to the method are provided. The method involves preliminary steps of selecting a site and determining a bolt array (19) and selection of dimensions and materials. Actual construction steps include forming a foundation slab (14) having vertical bolts (18) embedded therein in accordance with the bolt array (19). Alternating layers of beams (B), having aligned bolt bores (52) for receiving the bolts, are successively laid down over the bolts (18), with sides meeting at corners (29) with alternating sides encompassing the corner bolt. Once a desired height is achieved, washers (72) and nuts (78) are placed on the bolts and are tightened to desired pressure levels. The dwelling (10) is formed with beams (42) compressed together by threaded bolts (18) in a bolt array (19).

METHOD OF JOINING A NOGGING TO A STUD TO FORM A SUB-MODULE OF A PREFABRICATED BUILDING MODULE AND USE OF SUCH METHOD
20210316472 · 2021-10-14 · ·

The invention refers to a method of joining a nogging to a stud to form a sub-module of a prefabricated building module. The method comprises the acts of: providing (1000) a stud (2) and orienting the stud with a longitudinal extension of the stud along a first direction (A); providing (2000) a nogging material having a longitudinal extension being greater than an intended length of the nogging, and orienting the nogging material with a longitudinal extension along a second direction (B) being transverse to the first direction (A); moving (3000) a first free end of the nogging material into abutment with a first side surface of the stud (2) and cutting the nogging material to form a first nogging (3a); fixating (5000) and joining the free end of the nogging (3a) with the stud (2); moving (6000) the stud (2) and the first nogging (3a) along the first direction (A); and moving (7000) the free end of the nogging material into abutment with the stud (2); cutting (8000) the nogging material at a distance from the abutment, thereby forming a second nogging (3b); and fixating (9000) and joining the stud (2) and the second nogging (3b).

BEAM AND BOLTING CONSTRUCTION SYSTEM AND METHOD
20210156144 · 2021-05-27 ·

Beam segments made of a somewhat compressible material may be arranged with the top surface of each beam segment substantially in contact with the bottom surface of a next beam segment between a first beam segment and a last beam segment. A plurality of bolt bores extends between the top and bottom surfaces of each of the beam segments in substantial alignment through each of the beam segments. The bolt bores are spaced apart to receive corresponding bolt segments and tightening fasteners compressed between the first beam segment and the last beam segment. The beam segments may be compressed to form a combined beam structure that forms a building structure unit. The combined beam structure may be joined with other combined beam structures to form walls and floors for a building structure.

BEAM AND BOLTING CONSTRUCTION SYSTEM AND METHOD
20210062504 · 2021-03-04 ·

A beam and bolting construction method and an example dwelling (10) according to the method are provided. The method involves preliminary steps of selecting a site and determining a bolt array (19) and selection of dimensions and materials. Actual construction steps include forming a foundation slab (14) having vertical bolts (18) embedded therein in accordance with the bolt array (19). Alternating layers of beams (B), having aligned bolt bores (52) for receiving the bolts, are successively laid down over the bolts (18), with sides meeting at corners (29) with alternating sides encompassing the corner bolt. Once a desired height is achieved, washers (72) and nuts (78) are placed on the bolts and are tightened to desired pressure levels. The dwelling (10) is formed with beams (42) compressed together by threaded bolts (18) in a bolt array (19).