Patent classifications
E21D23/0047
Equipment system for no-roadway no-coal-pillar retained roadway mining method
An equipment system for a self-retaining mining method mainly comprises a transition support, an end support, a following support, and a fast-retracting support. Working face gateroads do not need to advance in mining, and a coal mining machine may be used to cut a neat coal wall at the end of a district. The entry rib is automatically formed after roof caving, thus forming a gateroad in a re-mining process. The coal mining machine is under digital control when its end cuts the coal, automatically enabling the end to laterally cut the coal wall to form a vertical straight line, which is used as the entry rib of the gateroad. A scrapper conveyor works in coordination with an arc-shaped coal grabbing plate of the coal mining machine to clean up float coal at the end as much as possible.
Hydraulic Support with Quick Response Function for Coal Wall Spalling
The present disclosure relates to a hydraulic support with a quick response function for coal wall spalling, which includes a base, an upright post, a top beam, an extensible canopy, a face guard, and a vibration meter. The vibration meter is mounted on a hydraulic support, and detects a vibration signal of a coal wall in a non-contact mode. The face guard includes a primary face guard, a secondary face guard, and a tertiary face guard connected in sequence. One side, close to a coal wall, of the primary face guard is connected to a quick response device. The quick response device is in signal communication with the vibration meter. After receiving the vibration signal of the coal wall, the quick response device is abutted against the coal wall before the secondary face guard and the tertiary face guard fit the coal wall.
EQUIPMENT SYSTEM FOR NO-ROADWAY NO-COAL-PILLAR RETAINED ROADWAY MINING METHOD
An equipment system for a self-retaining mining method mainly comprises a transition support, an end support, a following support, and a fast-retracting support. Working face gateroads do not need to advance in mining, and a coal mining machine may be used to cut a neat coal wall at the end of a district. The entry rib is automatically formed after roof caving, thus forming a gateroad in a re-mining process. The coal mining machine is under digital control when its end cuts the coal, automatically enabling the end to laterally cut the coal wall to form a vertical straight line, which is used as the entry rib of the gateroad. A scrapper conveyor works in coordination with an arc-shaped coal grabbing plate of the coal mining machine to clean up float coal at the end as much as possible.
Hydraulic support with quick response function for coal wall spalling
The present disclosure relates to a hydraulic support with a quick response function for coal wall spalling, which includes a base, an upright post, a top beam, an extensible canopy, a face guard, and a vibration meter. The vibration meter is mounted on a hydraulic support, and detects a vibration signal of a coal wall in a non-contact mode. The face guard includes a primary face guard, a secondary face guard, and a tertiary face guard connected in sequence. One side, close to a coal wall, of the primary face guard is connected to a quick response device. The quick response device is in signal communication with the vibration meter. After receiving the vibration signal of the coal wall, the quick response device is abutted against the coal wall before the secondary face guard and the tertiary face guard fit the coal wall.