E21D9/001

DEVICE FOR BACK SOIL DISTURBANCE IN SHIELD TUNNEL

The present invention relates to an apparatus for soil disturbance at the back of a shield tunnel, wherein: the apparatus is formed by a fitting I and a fitting II connected by means of three bolts that form equal angles; the fitting I is a short circular pipe; an end surface of a fitting end of the fitting I is provided with a water passage; a pipe wall of the pipe is provided with 2-8 water spouts; the fitting II is a long circular pipe whose inner and outer diameters are consistent with those of the fitting I; a fitting end of the fitting II is provided with two O-shaped water stop rings; a pipe wall of the fitting II is provided with three water inlets that form equal angles and are in communication with the water passage of the fitting I.

Mining machine applicable to fluidized mining of ore bodies and mining method

A mining machine applicable to fluidized mining and a mining method therefor are provided herein. A microwave transmitting mechanism, a liquid jet drill rod and a cutter-head are arranged at the head of a first excavation device of the mining machine. The ore body in front is first processed by the microwave transmitting mechanism and the liquid jet drill rod to reduce the strength of the ore body, which facilitates subsequent mining of the ore body, lowers the hardness requirements of the cutter-head, and reduces the wearing of the cutter-head. With this mining machine mining the ore body, the mined ores can be directly converted, under the ground, into resources in the easily transportable form, without transporting the ore to the surface for conversion, which saves the cost of transporting the ore to the surface.

Method and system for ensuring the quality of a multi-component mixture for rock reinforcement

A method for ensuring the quality of a multi-component mixture in a system for rock reinforcement is described herein. The system comprises a first and a second channel for a respective first and second component intended for injection in a rock hole. The respective channel comprises a pump and a container intended for the respective component. The method comprises the steps of pumping of the respective component from the respective container through the respective channel and continuously comparing the flow of the first component in the first channel with the flow of the second component in the second channel. The method further comprises the step of controlling the pumps individually, based on the comparison of the flows, in such a way that a deviation from a pre-defined volume ratio between the first component and the second component in the mixture is below a pre-defined first threshold.

METHOD AND SYSTEM OF CONSTRUCTING AN UNDERGROUND TUNNEL
20220003115 · 2022-01-06 ·

Long tunnels of many kilometres are likely to pass through a range of geologies which may cause problems. The present invention seeks to overcome the disadvantages of the prior art by: drilling a first bore 10 along a first predetermined path, the first bore having a length of at least 25 m; drilling a plurality of second bores 20 along respective second predetermined paths, each substantially parallel to the first predetermined path in order to define a substantially prism-shape region therebetween; and excavating material within the substantially prism-shape region to form a tunnel. In this way, data from drilling the first bore 10 and the plurality of second bores 20 can be recorded and used to inform operators as to the types of material through which they will be excavating. Thus, a more complete view of the underlying geology can be achieved before beginning excavations.

METHODS FOR REAL-TIME DEVIATION MONITORING OF MINIATURE PIPE ROOFING JACKING PIPE OF SPIRAL SOIL-DISCHARGING

Provide is a method for real-time deviation monitoring of miniature pipe-roofing jacking pipes of spiral soil-discharging. The method includes: welding a measurement auxiliary pipe to an outer wall of a pipe-roofing steel pipe, providing a laser pen inside a front end of the measurement auxiliary pipe, and the laser pen emits a beam propagating from the front end to a rear end of the measurement auxiliary pipe. After installation, a male lock buckle and a female lock buckle are symmetrically welded onto the pipe-roofing steel pipe, and form an integrated structure with the pipe-roofing steel pipe. A measurement plate is fixedly mounted on a housing of a pipe-roofing drilling machine. During jacking, a change of a position of the beam on the measurement plate is observed to determine a deviation of a drill bit of the pipe-roofing drilling machine and the pipe-roofing steel pipe in real-time.

THREE-LEVEL PREVENTION AND CONTROL METHOD FOR ROCK BURST ROADWAY

A three-level prevention and control method for a rock burst roadway, the method comprising: pre-weakening a thick and hard rock layer above a roadway before the roadway is excavated; carrying out prestress support, pressure relief and reinforcement when the roadway is excavated; and carrying out stress transfer on an advance abutment pressure, and arranging a composite energy absorption protective structure around the roadway before the mining of a working face. By coordinating the spatio-temporal relationship between pressure relief, support and prevention, the energy dissipation in the rock burst roadway is changed from an unstable, disorderly and uncontrollable dissipation state to a stable, orderly and controllable dissipation state.

MINING MACHINE APPLICABLE TO FLUIDIZED MINING OF ORE BODIES AND MINING METHOD

A mining machine applicable to fluidized mining and a mining method therefor are provided herein. A microwave transmitting mechanism, a liquid jet drill rod and a cutter-head are arranged at the head of a first excavation device of the mining machine. The ore body in front is first processed by the microwave transmitting mechanism and the liquid jet drill rod to reduce the strength of the ore body, which facilitates subsequent mining of the ore body, lowers the hardness requirements of the cutter-head, and reduces the wearing of the cutter-head. With this mining machine mining the ore body, the mined ores can be directly converted, under the ground, into resources in the easily transportable form, without transporting the ore to the surface for conversion, which saves the cost of transporting the ore to the surface.

FOAMING ADDITIVE WITH LOW ECOTOXICOLOGICAL IMPACT FOR SOIL CONDITIONING IN THE PRESENCE OF MECHANISED EXCAVATION

The present invention relates to the use of foaming additives in liquid, paste or powder form, to condition soil excavated with a tunnel boring machine. Said additives can be classified as readily biodegradable and are characterised by a lower ecotoxicological impact than commercial products.

METHOD AND SYSTEM FOR ENSURING THE QUALITY OF A MULTI-COMPONENT MIXTURE FOR ROCK REINFORCEMENT

A method for ensuring the quality of a multi-component mixture in a system for rock reinforcement is described herein. The system comprises a first and a second channel for a respective first and second component intended for injection in a rock hole. The respective channel comprises a pump and a container intended for the respective component. The method comprises the steps of pumping of the respective component from the respective container through the respective channel and continuously comparing the flow of the first component in the first channel with the flow of the second component in the second channel. The method further comprises the step of controlling the pumps individually, based on the comparison of the flows, in such a way that a deviation from a pre-defined volume ratio between the first component and the second component in the mixture is below a pre-defined first threshold.

ADMIXTURE FOR PREVENTING SWELLING OF ANHYDRITE CONTAINING ROCK MATERIAL

A chemical inhibitor is used for reducing and/or preventing swelling of anhydrite containing rock material, wherein, the chemical inhibitor is used during construction work, especially in tunnel construction through rock material, especially in drill and blast tunnel construction work and/or in tunnel construction with a tunnel boring machine.