E21F15/08

Method for recovering room-type coal pillars by cemented filling of reserved roadways

Provided is a method for recovering room-type coal pillars by cemented filling of reserved roadways, which is especially suitable for safe and efficient recovery of left coal pillars in room-type mining faces in mining areas where the ecological system is fragile, such as in western China. In the method, by constructing reserved roadways in two adjacent rows of room-type goafs, excavating coal pillar roadways in room-type coal pillars, and finally interconnecting the reserved roadways with the coal pillar roadways to form a U-shaped working face, room-type left coal pillars are recovered. Thus, not only the workload of roadway excavation is reduced, but also the recovery ratio of the coal resources is maximized. The method provides a novel technical model for the recovery of room-type left coal pillars in mining areas, such as in western China.

A PROCESS FOR CONTROLLED IN-SITU COAL GASIFICATION AND A FILLING DEVICE TO OPERATE THE SAME
20230304387 · 2023-09-28 ·

A process for controlled in-situ coal gasification is disclosed. The process includes surveying one or more selected coal bearing sites for designing a plurality of panels; designing a plurality of sub-panels of a plurality of corresponding panels with a plurality of bi-directional boreholes and a plurality of vertical service boreholes; channelizing the plurality of bi-directional boreholes and vertical service boreholes to one or more layers of coal seams; constructing one or more coal slice areas of predefined dimensions within the one or more layers of the coal seams; combusting coal inside the one or more coal slice areas; extracting combusted coal from the one or more coal slice areas through the plurality of vertical service boreholes; monitoring physical condition of at least one cavity created by extraction of the combusted coal; controlling remote filling of a filling material simultaneously at the at least one cavity using the filling device.

A PROCESS FOR CONTROLLED IN-SITU COAL GASIFICATION AND A FILLING DEVICE TO OPERATE THE SAME
20230304387 · 2023-09-28 ·

A process for controlled in-situ coal gasification is disclosed. The process includes surveying one or more selected coal bearing sites for designing a plurality of panels; designing a plurality of sub-panels of a plurality of corresponding panels with a plurality of bi-directional boreholes and a plurality of vertical service boreholes; channelizing the plurality of bi-directional boreholes and vertical service boreholes to one or more layers of coal seams; constructing one or more coal slice areas of predefined dimensions within the one or more layers of the coal seams; combusting coal inside the one or more coal slice areas; extracting combusted coal from the one or more coal slice areas through the plurality of vertical service boreholes; monitoring physical condition of at least one cavity created by extraction of the combusted coal; controlling remote filling of a filling material simultaneously at the at least one cavity using the filling device.

METHOD FOR RECOVERING ROOM-TYPE COAL PILLARS BY CEMENTED FILLING OF RESERVED ROADWAYS
20210355826 · 2021-11-18 ·

Provided is a method for recovering room-type coal pillars by cemented filling of reserved roadways, which is especially suitable for safe and efficient recovery of left coal pillars in room-type mining faces in mining areas where the ecological system is fragile, such as in western China. In the method, by constructing reserved roadways in two adjacent rows of room-type goafs, excavating coal pillar roadways in room-type coal pillars, and finally interconnecting the reserved roadways with the coal pillar roadways to form a U-shaped working face, room-type left coal pillars are recovered. Thus, not only the workload of roadway excavation is reduced, but also the recovery ratio of the coal resources is maximized. The method provides a novel technical model for the recovery of room-type left coal pillars in mining areas, such as in western China.

Plug for a Void, System and Method
20220389817 · 2022-12-08 · ·

A plug for a void in a mine to divert water having a rigid closed cell foam which fills the void. The rigid closed cell foam having a plurality of pipes disposed within the foam. The pipes distributed throughout the void. The pipes are positioned in the foam so the pipes are staggered in length vertically with respect to various heights in the void, and the pipes are positioned in the foam every 4′ to 6′ horizontally with respect to the void. Each pipe has a mixing stick. A method for diverting water from a void in a mine.

Plug for a Void, System and Method
20220389817 · 2022-12-08 · ·

A plug for a void in a mine to divert water having a rigid closed cell foam which fills the void. The rigid closed cell foam having a plurality of pipes disposed within the foam. The pipes distributed throughout the void. The pipes are positioned in the foam so the pipes are staggered in length vertically with respect to various heights in the void, and the pipes are positioned in the foam every 4′ to 6′ horizontally with respect to the void. Each pipe has a mixing stick. A method for diverting water from a void in a mine.

Process for controlled in-situ coal gasification and a filling device to operate the same
11814941 · 2023-11-14 · ·

A process for controlled in-situ coal gasification is disclosed. The process includes surveying one or more selected coal bearing sites for designing a plurality of panels; designing a plurality of sub-panels of a plurality of corresponding panels with a plurality of bi-directional boreholes and a plurality of vertical service boreholes; channelizing the plurality of bi-directional boreholes and vertical service boreholes to one or more layers of coal seams; constructing one or more coal slice areas of predefined dimensions within the one or more layers of the coal seams; combusting coal inside the one or more coal slice areas; extracting combusted coal from the one or more coal slice areas through the plurality of vertical service boreholes; monitoring physical condition of at least one cavity created by extraction of the combusted coal; controlling remote filling of a filling material simultaneously at the at least one cavity using the filling device.

Process for controlled in-situ coal gasification and a filling device to operate the same
11814941 · 2023-11-14 · ·

A process for controlled in-situ coal gasification is disclosed. The process includes surveying one or more selected coal bearing sites for designing a plurality of panels; designing a plurality of sub-panels of a plurality of corresponding panels with a plurality of bi-directional boreholes and a plurality of vertical service boreholes; channelizing the plurality of bi-directional boreholes and vertical service boreholes to one or more layers of coal seams; constructing one or more coal slice areas of predefined dimensions within the one or more layers of the coal seams; combusting coal inside the one or more coal slice areas; extracting combusted coal from the one or more coal slice areas through the plurality of vertical service boreholes; monitoring physical condition of at least one cavity created by extraction of the combusted coal; controlling remote filling of a filling material simultaneously at the at least one cavity using the filling device.

Plug for a void, system and method

A plug for a void in a mine to divert water having a rigid closed cell foam which fills the void. The rigid closed cell foam having a plurality of pipes disposed within the foam. The pipes distributed throughout the void. The pipes are positioned in the foam so the pipes are staggered in length vertically with respect to various heights in the void, and the pipes are positioned in the foam every 4′ to 6′ horizontally with respect to the void. Each pipe has a mixing stick. A method for diverting water from a void in a mine.

Plug for a void, system and method

A plug for a void in a mine to divert water having a rigid closed cell foam which fills the void. The rigid closed cell foam having a plurality of pipes disposed within the foam. The pipes distributed throughout the void. The pipes are positioned in the foam so the pipes are staggered in length vertically with respect to various heights in the void, and the pipes are positioned in the foam every 4′ to 6′ horizontally with respect to the void. Each pipe has a mixing stick. A method for diverting water from a void in a mine.