F22B29/068
Combined cycle gas turbine plant comprising a waste heat steam generator and fuel preheating step
A combined cycle gas turbine plant and a corresponding method for operating such a combined cycle gas turbine plant, in which, during load operation of the combined cycle gas turbine plant, a water mass flow which is supplied according to the forced-flow principle to a waste heat steam generator is adjusted such that the evaporator heating surface of the medium pressure stage is oversupplied and thus a defined amount of excess water, which is heated in the evaporator heating surface but not vaporized, is discharged via the water-steam separator to a heat exchanger circuit for preheating fuel for the gas turbine.
Economizer water recirculation system for boiler exit gas temperature control in supercritical pressure boilers
A fluid recirculation system includes an arrangement of a flow control valve located to receive a flow of fluid from an inlet. The system further comprises an economizer inlet mixing device located to receive the flow of hotter fluid from the arrangement of the flow control valve and from a cooler feedwater stream. An economizer inlet mixing device located upstream of an economizer in a supercritical pressure boiler includes a sparger assembly through which a flow of fluid from the waterwall outlet is received, an inlet through which a flow of fluid from a feed stream is received, and a wave breaker assembly through which an outlet stream from the economizer inlet mixing device is directed.