Patent classifications
F22B37/008
BOILER
A boiler performs mixed-fuel combustion of a sulfur-containing fuel and ammonia as a fuel, and includes a furnace having a plurality of wall parts, a burner installed on at least one of the wall parts of the furnace, and an ammonia injection port that is configured to cause the ammonia to be burned as the fuel to flow along an inner wall surface of the wall part where the burner is not installed.
Method and system for improving boiler effectiveness
A method for improving effectiveness of a steam generator system includes providing air to an air preheater at a mass flow such that the air preheater has a cold end outlet temperature defined by the improved air preheater operating with increased heat recovery (HR) of at least 1% calculated according to the equation: HR=100%((TgiTgoAdvX)/(TgiTgoSTD)1). The method requires either reducing the amount of heat that flows into the air preheater from the flue gas and/or increasing the amount of heat extracted from the flue gas. The method includes mitigating SO.sub.3 in the flue gas which is discharged directly from the air preheater to a particulate removal system and then directly into a flue gas desulfurization system. The method includes extracting heat from the Flue gas to create equipment preheat and/or flue gas stack reheat air with the latter being fed to heat the flue gas prior to entering a discharge stack to raise the temperature of the flue gas to mitigate visible plume exiting and to mitigate corrosion in, the discharge stack.
Assembly and a method of installing an assembly of a particle separator module and a heat exchange chamber module, and a circulating fluidized bed boiler with such an assembly
A particle separator module and a heat exchange chamber module connectable to a circulating fluidized bed boiler. The particle separator module includes 2N vertically aligned steam tubes, N being an integer greater than one. Each of the vertically aligned steam tubes is attached to a boiler upper portion and extends downwards to a predetermined level. Each of the 2N vertically aligned steam tubes is attached to one of N first beams. Each of the N first beams is suspended to hang in a horizontal position at the predetermined level by two adjacent steam tubes of the 2N vertically aligned steam tubes. N second beams are attached in a horizontal position to the top surface of the heat exchange chamber module, which is arranged to be suspended from the particle separator module by having each of the N second beams suspended by two adjacent beams of the N first beams.
Boiler
A boiler performs mixed-fuel combustion of a sulfur-containing fuel and ammonia as a fuel, and includes a furnace having a plurality of wall parts, a burner installed on at least one of the wall parts of the furnace, and an ammonia injection port that is configured to cause the ammonia to be burned as the fuel to flow along an inner wall surface of the wall part where the burner is not installed.
METHOD AND SYSTEM FOR IMPROVING BOILER EFFECTIVENESS
A method for improving effectiveness of a steam generator system includes providing air to an air preheater at a mass flow such that the air preheater has a cold end outlet temperature defined by the improved air preheater operating with increased heat recovery (HR) of at least 1% calculated according to the equation: HR=100%?((Tgi?TgoAdvX)/(Tgi?TgoSTD)?1). The method requires either reducing the amount of heat that flows into the air preheater from the flue gas and/or increasing the amount of heat extracted from the flue gas. The method includes mitigating SO.sub.3 in the flue gas which is discharged directly from the air preheater to a particulate removal system and then directly into a flue gas desulfurization system. The method includes extracting heat from the Flue gas to create equipment preheat and/or flue gas stack reheat air with the latter being fed to heat the flue gas prior to entering a discharge stack to raise the temperature of the flue gas to mitigate visible plume exiting and to mitigate corrosion in, the discharge stack.
Method and apparatus for firetube boiler and ultra low NOx burner
The current invention disclose a method and apparatus for production of hot water or steam in a firetube boiler, said method comprising the steps of producing a first flue gas using a first stage of a burner in a first pass of a firetube boiler; passing at least a portion of said first flue gas through a second pass of said boiler, wherein said second pass comprises a plurality of firetubes; routing said portion of said first flue gas to a second stage of said burner to reduce NOx emissions from said second stage of said burner; producing a second flue gas from said second stage of said burner in a third pass of said boiler; passing said second flue gas through a fourth pass of said boiler, wherein said fourth pass comprises a plurality of firetubes.
Method and system for improving boiler effectiveness
A method for improving effectiveness of a steam generator system includes providing air to an air preheater in excess of that required for combustion of fuel and providing the air at a mass flow such that the air preheater has a cold end metal temperature that is no less than a water dew point temperature in the air preheater and such that the cold end metal temperature is less than a sulfuric acid dew point temperature. The method includes mitigating SO.sub.3 in the flue gas which is discharged directly from the air preheater to a particulate removal system and then directly into a flue gas desulfurization system. Flue gas reheat air is fed from the air preheater to heat the flue gas prior to entering a discharge stack to raise the temperature of the flue gas to mitigate visible plume exiting and to mitigate corrosion in the discharge stack.
System for combined flue gas heat recovery and dust precipitation improvement as retrofit solution for existing coal-fired power stations
A power plant is suggested with an additional heat transfer between the flue gas that flows through a flue gas line (5) and the feed-water in a feed-water line (19). The claimed arrangement of the first heat exchanger (13) upstream and adjacent to a precipitator (7) leads to a reduced space demand and optimizes dust precipitation as well as the pressure drop of the flue gas.
Steam supply system and CO2 recovery unit including the same
A steam supply system that can reheat CO.sub.2 absorbing liquid without lowering performance of a reboiler by decompressing a condensed water drum is provided. This system includes a reboiler that raises the temperature of absorbing liquid contacted with exhaust gas discharged from a boiler to absorb CO.sub.2 in the exhaust gas and heated to eliminate CO.sub.2. The reboiler includes a heat exchanger tube to which steam for heating is supplied and a condensed water drum that recovers condensed water of the steam introduced from the heat exchanger tube as steam drain, and the condensed water drum is provided with decompression unit that lowers pressure in the condensed water drum.
Method and system for improving boiler effectiveness
A method for improving effectiveness of a steam generator system includes providing a steam generator system including a steam generator vessel, an air supply system and an air preheater. The air supply system is in communication with the steam generator vessel through the air preheater and the steam generator vessel is in communication with the air preheater. The air supply system provides a first amount of air to the air preheater. At least a portion of the first amount of air is provided to the steam generator vessel. A flue gas mixture is discharged from the steam generator vessel. At least a portion of the flue gas mixture flows into the air preheater. SO.sub.3 in the flue gas mixture is mitigated before the flue gas mixture enters the air preheater.