F27D2001/1605

METHOD OF INSTALLING HEAT INSULATING BLOCK ON FURNACE SHELL, METHOD OF MANUFACTURING HEAT INSULATING WALL, HEAT INSULATING WALL, INDUSTRIAL FURNACE, AND SET FOR INSTALLING HEAT INSULATING BLOCK

Provided is a method of installing a heat insulating block on a furnace shell which enables a heat insulating block to be firmly fixed to a furnace wall but does not require much time and costs for making the heat insulating block, and which further offers good workability at a site. The method of installing a heat insulating block on a furnace shell includes: inserting a beam of a fixture into a fold of an inorganic fiber aggregate mat that is folded up to form a heat insulating block; and fixing the fixture and a furnace shell to each other.

Integrated refractory management system and control method therefor
10962288 · 2021-03-30 · ·

An integrated refractory management system includes: a cable module, at least a portion of which is inserted into a refractory; a measurement module, disposed outside the refractory, for measuring a current signal flowing through the cable module; an integrated management module for determining the state of the refractory on the basis of the current signal measured by the measurement module, displaying the state of the refractory, and generating management information on the refractory; and a local terminal for receiving the management information from the integrated management module.

Top loading roof for electric arc, metallurgical or refining furnaces and system thereof
10871328 · 2020-12-22 · ·

A method of quickly changing a portion of the roof of an electric arc furnace having a top loading roof system comprising providing at least one pie-shaped water cooled panel supported below the roof support beams and located to protect the underside hot face of the roof support beams, providing at least one quick water disconnect for connecting the at least one pie-shaped water cooled panel to a water supply, raising and removing the at least one pie-shaped water cooled roof panel, replacing the at least one pie-shaped water cooled roof panel with another pie-shaped water cooled panel or repairing the at least one pie-shaped water cooled roof panel, and continuing operation of the furnace.

Method for repairing a refractory lining of a metallurgical vessel in the hot state

A method for repairing a refractory lining of a metallurgical vessel in the hot state. This repair takes place using a supplying apparatus. In addition, recording of at least the worn regions and monitoring of the repair are carried out by a monitoring device. Before, during and/or after the supplying of material, at least a partial region of the areas of the refractory lining of the vessel or the gunning jet is recorded photographically with visualization of the temperature ranges. This results in an evaluation with regard to different parameters such as properties, layer thickness and/or distribution of the supplied material. It has been demonstrated that visualization of the temperature ranges of the areas to be repaired and of the refractory material during supplying of material enables different parameters to be established very accurately, and as a result, optimal coating of the wall lining can be achieved.

INTEGRATED REFRACTORY MANAGEMENT SYSTEM AND CONTROL METHOD THEREFOR
20190120555 · 2019-04-25 · ·

An integrated refractory management system includes: a cable module, at least a portion of which is inserted into a refractory; a measurement module, disposed outside the refractory, for measuring a current signal flowing through the cable module; an integrated management module for determining the state of the refractory on the basis of the current signal measured by the measurement module, displaying the state of the refractory, and generating management information on the refractory; and a local terminal for receiving the management information from the integrated management module.

TOP LOADING ROOF FOR ELECTRIC ARC, METALLURGICAL OR REFINING FURNACES AND SYSTEM THEREOF
20180216888 · 2018-08-02 ·

A method of quickly changing a portion of the roof of an electric arc furnace having a top loading roof system comprising providing at least one pie-shaped water cooled panel supported below the roof support beams and located to protect the underside hot face of the roof support beams, providing at least one quick water disconnect for connecting the at least one pie-shaped water cooled panel to a water supply, raising and removing the at least one pie-shaped water cooled roof panel, replacing the at least one pie-shaped water cooled roof panel with another pie-shaped water cooled panel or repairing the at least one pie-shaped water cooled roof panel, and continuing operation of the furnace.

Method for Repairing a Refractory Lining of a Metallurgical Vessel in the Hot State

A method relates in particular to the repair of a refractory lining of a metallurgical vessel (10) in the hot state. This repair takes place here by means of an supplying apparatus (15). In addition, recording of at least the worn regions and monitoring of the repair are carried out by means of a device (20). Before, during and/or after the supplying of at least a partial region of the areas (13) of the refractory lining (12) of the vessel (10) to be repaired or the gunning jet (18) is recorded photographically here with visualisation of the temperature ranges (26, 27, 28), and this results in an evaluation with regard to different parameters such as properties, layer thickness and/or distribution of the supplied material. It has been demonstrated that by means of this visualisation of the temperature ranges of the areas to be repaired and of the refractory material during supplying different parameters can be established very accurately, and as a result optimal coating of the wall lining can be achieved.