Patent classifications
G01R31/40
POWER CONVERSION, FAULT MANAGEMENT, AND NOTIFICATION
An apparatus includes a power supply monitor operative to monitor a status of multiple power converters. Based on the monitored status, the power supply monitor detects an event associated with a first power converter of the multiple power converters. The power supply monitor communicates a notification of the event to a management entity. The notification is encoded to include an identity of the first power converter experiencing the event as determined by the power supply monitor or other suitable entity.
POWER CONVERSION, FAULT MANAGEMENT, AND NOTIFICATION
An apparatus includes a power supply monitor operative to monitor a status of multiple power converters. Based on the monitored status, the power supply monitor detects an event associated with a first power converter of the multiple power converters. The power supply monitor communicates a notification of the event to a management entity. The notification is encoded to include an identity of the first power converter experiencing the event as determined by the power supply monitor or other suitable entity.
Power contact health assessor apparatus and method
A system includes a dry contact with a first pair of switchable electrodes, a wet contact with a second pair of switchable electrodes, an arc suppressor, and a controller circuit operatively coupled to the arc suppressor and the first and second pairs of switchable electrodes. The controller circuit is configured to detect a failure of the wet contact and determine a stick duration associated with the first pair of switchable electrodes. The stick duration is based on a duration between an instance when a coil of the dry contact is deactivated and an instance of separation of the first pair of switchable electrodes during deactivation of the coil. The controller circuit generates, in-situ and in real-time, health assessment for the first pair of switchable electrodes based on a comparison of the determined stick duration with an average stick duration associated with a window of observation.
Power contact health assessor apparatus and method
A system includes a dry contact with a first pair of switchable electrodes, a wet contact with a second pair of switchable electrodes, an arc suppressor, and a controller circuit operatively coupled to the arc suppressor and the first and second pairs of switchable electrodes. The controller circuit is configured to detect a failure of the wet contact and determine a stick duration associated with the first pair of switchable electrodes. The stick duration is based on a duration between an instance when a coil of the dry contact is deactivated and an instance of separation of the first pair of switchable electrodes during deactivation of the coil. The controller circuit generates, in-situ and in real-time, health assessment for the first pair of switchable electrodes based on a comparison of the determined stick duration with an average stick duration associated with a window of observation.
Semiconductor integrated circuit device
A semiconductor integrated circuit device includes a control unit configured to control a switching element or an output transistor of a power supply device, a monitor terminal for monitoring an output voltage of the power supply device, a test unit configured to output a test signal to the monitor terminal before activation of the power supply device, and a determination unit configured to determine whether or not the monitor terminal is open, on the basis of a voltage of the monitor terminal when the test unit outputs the test signal to the monitor terminal.
Load testing device
A load testing device includes a connection unit to which a power source being tested is connected, a hydrogen generating unit that performs electrolysis based on power supplied from the power source being tested to generate hydrogen, two or more supply units to which hydrogen obtained in the hydrogen generating unit passes and to which a portable tank is removably attached, and an operational unit that has a load amount adjustment switch and a display unit. The load amount of the hydrogen generating unit is switched depending on an operational state of the load amount adjustment switch. The display unit displays at least one of an attachment status of the portable tank and a filling status of hydrogen in the two or more supply units.
Load testing device
A load testing device includes a connection unit to which a power source being tested is connected, a hydrogen generating unit that performs electrolysis based on power supplied from the power source being tested to generate hydrogen, two or more supply units to which hydrogen obtained in the hydrogen generating unit passes and to which a portable tank is removably attached, and an operational unit that has a load amount adjustment switch and a display unit. The load amount of the hydrogen generating unit is switched depending on an operational state of the load amount adjustment switch. The display unit displays at least one of an attachment status of the portable tank and a filling status of hydrogen in the two or more supply units.
METHOD AND VOLTAGE CONVERTER ASSEMBLY FOR SUPPLYING ENERGY TO AT LEAST ONE ELECTRICAL VEHICLE MODULE
A method and a voltage converter assembly for supplying energy to at least one electrical vehicle module. The assembly includes at least one voltage converter that is designed to convert an input voltage, provided by at least one supply source, into at least one predefinable output voltage, which is applied to the at least one vehicle module, a voltage monitor that is designed to detect the input voltage, and an evaluation and control unit that is designed to carry out the method for supplying energy to at least one electrical vehicle module. The supply source is loaded with a predefinable current level when the input voltage that is present exceeds a predefinable setpoint voltage value, the input voltage being converted into at least one output voltage if the input voltage remains above the predefinable setpoint voltage value despite the load on the supply source.
CURRENT LOAD CIRCUIT AND CHIP FOR TESTING POWER SUPPLY CIRCUIT
A current load circuit for testing a power supply circuit includes a control circuit and a load generation circuit. The control circuit is configured to generate a reset signal according to a clock signal. The load generation circuit is coupled to the control circuit and has several load configurations. The load generation circuit is configured to provide one of the load configurations as a current load of the load generation circuit according to the clock signal and the reset signal and receive a portion of the supply current provided by the power supply circuit according to the current load to generate an indication signal for indicating a performance of the power supply circuit.
CURRENT LOAD CIRCUIT AND CHIP FOR TESTING POWER SUPPLY CIRCUIT
A current load circuit for testing a power supply circuit includes a control circuit and a load generation circuit. The control circuit is configured to generate a reset signal according to a clock signal. The load generation circuit is coupled to the control circuit and has several load configurations. The load generation circuit is configured to provide one of the load configurations as a current load of the load generation circuit according to the clock signal and the reset signal and receive a portion of the supply current provided by the power supply circuit according to the current load to generate an indication signal for indicating a performance of the power supply circuit.