G05B13/022

INTELLECTUAL QUALITY MANAGEMENT METHOD, ELECTRONIC DEVICE AND COMPUTER READABLE STORAGE MEDIUM

An intellectual quality management method is disclosed. A heatmap risk interface is created according to the required data and the parameter configuration which are calculated using a time dependent risk priority number (RPN) equation. An intellectual audit scheduling algorithm is defined via the heatmap risk interface to automatically generate at least one audit plan. An audit program corresponding to the audit plan is performed and a plurality of problem points are selected. Intellectual root cause category recommendation is performed to the questions points. intellectual corrective actions and preventive action recommendations are performed to the problem points according to the intellectual root cause category recommendation to obtain at least one optimum corrective action and at least one preventive action. Corrective actions are performed to each audit unit according to the corrective action to solve the problem points and prevention actions are performed to each audit unit according to the preventive action.

Apparatus, method and recording medium for controlling system using temporal difference error

A non-transitory, computer-readable recording medium stores a program of reinforcement learning by a state-value function. The program causes a computer to execute a process including calculating a temporal difference (TD) error based on an estimated state-value function, the TD error being calculated by giving a perturbation to each component of a feedback coefficient matrix that provides a policy; calculating based on the TD error and the perturbation, an estimated gradient function matrix acquired by estimating a gradient function matrix of the state-value function with respect to the feedback coefficient matrix for a state of a controlled object, when state variation of the controlled object in the reinforcement learning is described by a linear difference equation and an immediate cost or an immediate reward of the controlled object is described in a quadratic form of the state and an input; and updating the feedback coefficient matrix using the estimated gradient function matrix.

Method for auto-tuning and process performance assessment of chamber control

Embodiments disclosed herein include a method for auto-tuning a system. In an embodiment, the method comprises determining if the system is in a steady state. Thereafter, the method includes exciting the system. In an embodiment, the method comprises storing process feedback measurements from the excited system to provide a set of stored data. In an embodiment, the set of stored data is a subset of all available data generated by the excited system. In an embodiment, the method further comprises determining when the excited system returns to the steady state, and tuning the system using the set of stored data.

Central plant control system with asset allocation override

A controller for building equipment that operate to produce or consume resources for a building or campus. The controller performs an optimization of an objective function subject to an override constraint to determine values for a plurality of decision variables indicating amounts of resources to be produced or consumed by the building equipment. The override constraint defines one or more of the values for a subset of the plurality of decision variables by specifying an override amount of a first resource of the resources to be produced or consumed by a first subset of the building equipment and the optimization determines a remainder of the values for a remainder of the plurality of decision variables. The controller controls the building equipment to produce or consume the amounts of the resources determined by performing the optimization subject to the override constraint.

AUTOMATIC DETECTION OF DISTRIBUTED ENERGY RESOURCES SYSTEM PARAMETERS

A method determines the topology of a DERs system having a plurality of assets, where at least one of the assets is a controllable asset. The method injects a power signal at a given frequency from a controllable asset into the DERs system. The voltage at each of the plurality of assets is measured, and the magnitude of perturbation of the voltage at the given frequency is determined for each of the plurality of assets. The method then constructs the topology of the DERs system as a function of the differences of the magnitude of perturbations of each of the plurality of assets.

GAIN SCHEDULING BASED TOOLFACE CONTROL SYSTEM FOR A ROTARY STEERABLE DRILLING TOOL

In accordance with some embodiments of the present disclosure, systems and methods for a gain scheduling based toolface control system for a rotary steerable drilling tool are disclosed. The method includes determining a desired toolface of a drilling tool, calculating a toolface error by determining a difference between a current toolface and the desired toolface, determining a plurality of operating points of the drilling tool, selecting one of the plurality of operating points based on a current operating point of the drilling tool, determining a model based on the selection, calculating a correction to correct the toolface error, the correction based on the model, transmitting a signal to the drilling tool such that the signal adjusts the current toolface based on the correction, and drilling a wellbore with a drill bit oriented at the desired toolface.

CENTRAL PLANT CONTROL SYSTEM WITH ASSET ALLOCATION OVERRIDE

A controller for building equipment that operate to produce or consume resources for a building or campus. The controller performs an optimization of an objective function subject to an override constraint to determine values for a plurality of decision variables indicating amounts of resources to be produced or consumed by the building equipment. The override constraint defines one or more of the values for a subset of the plurality of decision variables by specifying an override amount of a first resource of the resources to be produced or consumed by a first subset of the building equipment and the optimization determines a remainder of the values for a remainder of the plurality of decision variables. The controller controls the building equipment to produce or consume the amounts of the resources determined by performing the optimization subject to the override constraint.

Intellectual quality management method, electronic device and computer readable storage medium

An intellectual quality management method is disclosed. A heatmap risk interface is created according to the required data and the parameter configuration which are calculated using a time dependent risk priority number (RPN) equation. An intellectual audit scheduling algorithm is defined via the heatmap risk interface to automatically generate at least one audit plan. An audit program corresponding to the audit plan is performed and a plurality of problem points are selected. Intellectual root cause category recommendation is performed to the questions points. intellectual corrective actions and preventive action recommendations are performed to the problem points according to the intellectual root cause category recommendation to obtain at least one optimum corrective action and at least one preventive action. Corrective actions are performed to each audit unit according to the corrective action to solve the problem points and prevention actions are performed to each audit unit according to the preventive action.

INTELLECTUAL QUALITY MANAGEMENT METHOD, ELECTRONIC DEVICE AND COMPUTER READABLE STORAGE MEDIUM

An intellectual quality management method is disclosed. A heatmap risk interface is created according to the required data and the parameter configuration which are calculated using a time dependent risk priority number (RPN) equation. An intellectual audit scheduling algorithm is defined via the heatmap risk interface to automatically generate at least one audit plan. An audit program corresponding to the audit plan is performed and a plurality of problem points are selected. Intellectual root cause category recommendation is performed to the questions points. intellectual corrective actions and preventive action recommendations are performed to the problem points according to the intellectual root cause category recommendation to obtain at least one optimum corrective action and at least one preventive action. Corrective actions are performed to each audit unit according to the corrective action to solve the problem points and prevention actions are performed to each audit unit according to the preventive action.

METHOD FOR DC ISLANDING DETECTION BASED ON POSITIVE FEEDBACK OF BUS VOLTAGE AT SPECIFIC FREQUENCY

A method for a direct current (DC) islanding detection based on positive feedback of a bus voltage at a specific frequency, essentially including three steps: extraction of a specific frequency component of the bus voltage, injection of a disturbance component of the specific frequency, and determination of DC islanding. The extraction of the specific frequency component of the bus voltage and the injection of the disturbance component of the specific frequency constitute a positive feedback mechanism in a power management unit control loop. In a grid-connected mode of a DC grid, the positive feedback mechanism fails due to a control action of a voltage management unit on a bus, and the bus voltage remains stable. In an islanding mode of the DC grid, under an action of the positive feedback mechanism, the power management unit allows the bus voltage to generate a self-excited oscillation at the specific frequency.