G05B2219/31057

Method for Providing a List of Equipment Elements in Industrial Plants

A system and method provides an impact list of affecting equipment elements that affect an industrial sub-process. The method comprises the steps of selecting, in a topology model, the sub-process, wherein the sub-process is an equipment element that is a part of an industrial plant or process, and wherein the topology model is a graph, whose nodes represent equipment elements and whose edges represent interconnections between the equipment elements; traversing the nodes of the topology model, wherein the traversing starts from the selected sub-process and uses a traversing strategy; and for each of the at least one equipment elements, if the equipment element affects the industrial sub-process by an affecting degree greater than a first predefined affecting degree, adding the equipment element to the impact list of affecting equipment elements.

System and method for flexible manufacturing

The system performs a process for creating robotic control code for manufacturing products. A Designer UI displays virtual parts and receives inputs for processing and assembling the virtual parts that are required to create a virtual product. The designer identifies options for processing and assembling the virtual parts which are displayed on the user interface. The robot abilities and the options are selected to optimize a metric of the product manufacturing. The inventive toolset produces the robot control codes for performing a sequence of robotic abilities with the selected options to product the product. The robot control codes are used by a simulator which manipulates virtual robots and virtual parts to create a virtual product to check the robot control code. The verified robot control code is used to control real robots to create the product.

Method for providing a list of equipment elements in industrial plants

A system and method provides an impact list of affecting equipment elements that affect an industrial sub-process. The method comprises the steps of selecting, in a topology model, the sub-process, wherein the sub-process is an equipment element that is a part of an industrial plant or process, and wherein the topology model is a graph, whose nodes represent equipment elements and whose edges represent interconnections between the equipment elements; traversing the nodes of the topology model, wherein the traversing starts from the selected sub-process and uses a traversing strategy; and for each of the at least one equipment elements, if the equipment element affects the industrial sub-process by an affecting degree greater than a first predefined affecting degree, adding the equipment element to the impact list of affecting equipment elements.

System and method for flexible manufacturing

The system performs a process for creating robotic control code for manufacturing products. A Designer UI displays virtual parts and receives inputs for processing and assembling the virtual parts that are required to create a virtual product. The designer identifies options for processing and assembling the virtual parts which are displayed on the user interface. The robot abilities and the options are selected to optimize a metric of the product manufacturing. The inventive toolset produces the robot control codes for performing a sequence of robotic abilities with the selected options to product the product. The robot control codes are used by a simulator which manipulates virtual robots and virtual parts to create a virtual product to check the robot control code. The verified robot control code is used to control real robots to create the product.

SYSTEM AND METHOD FOR MOUNTING AN ITEM OF SWITCHGEAR CABINET EQUIPMENT OF MODULAR CONSTRUCTION
20210151961 · 2021-05-20 ·

A system and method for mounting a modular switch cabinet equipment in a switch cabinet housing (6) includes a computer-aided assistance unit (1) for determining a production-efficient assembly step sequence. The system and method further include at least one display unit (11-11′) for image and/or text information, which is installed at the assembly site for at least one fitter (M) in order to visualize manual assembly steps (A; B; D) of the determined assembly step sequence. The system and method further includes at least one input unit (12-12′) for acknowledgement of the completed assembly step (A; B; D) by the fitter (M).

System and method for flexible manufacturing

The system performs a process for creating robotic control code for manufacturing products. A Designer UI displays virtual parts and receives inputs for processing and assembling the virtual parts that are required to create a virtual product. The designer identifies options for processing and assembling the virtual parts which are displayed on the user interface. The robot abilities and the options are selected to optimize a metric of the product manufacturing. The inventive toolset produces the robot control codes for performing a sequence of robotic abilities with the selected options to product the product. The robot control codes are used by a simulator which manipulates virtual robots and virtual parts to create a virtual product to check the robot control code. The verified robot control code is used to control real robots to create the product.

System and method for mounting an item of switchgear cabinet equipment of modular construction

A system and method for mounting a modular switch cabinet equipment in a switch cabinet housing (6) includes a computer-aided assistance unit (1) for determining a production-efficient assembly step sequence. The system and method further include at least one display unit (11-11) for image and/or text information, which is installed at the assembly site for at least one fitter (M) in order to visualize manual assembly steps (A; B; D) of the determined assembly step sequence. The system and method further includes at least one input unit (12-12) for acknowledgement of the completed assembly step (A; B; D) by the fitter (M).

SYSTEMS AND METHODS OF MATRIX MANUFACTURING WITH WORK CELLS

A manufacturing matrix can include a plurality of work cells. The manufacturing matrix can include a plurality of robotic arms disposed in the plurality of work cells to produce a construction product. The manufacturing matrix can include a storage location to store inventory including at least one of the material, the tool, the subassembly of the construction product, or a completed construction product. The manufacturing matrix can include a transportation system to move the inventory within the manufacturing matrix. The manufacturing matrix can include a data processing system communicably coupled with the plurality of robotic arms and the transportation system. The data processing system can provide a first instruction to a first robotic arm cell and a second instruction to a second robotic arm of the second work cell.