Patent classifications
G05B2219/32078
LAMINATION PLANNING METHOD FOR LAMINATE MOLDED OBJECT, AND LAMINATE MOLDED OBJECT MANUFACTURING METHOD AND MANUFACTURING DEVICE
A building time for building an additively-manufactured object is calculated on the basis of the inter-pass time and the welding pass time and is compared with a preset upper limit value, and welding conditions in a depositing plan are repeatedly modified until the building time is equal to or less than the upper limit value. Alternatively, corrections are repeatedly performed until the shape difference between a building shape of built-up object shape data relating to the additively-manufactured object created on the basis of the inter-pass time and the inter-pass temperature, and a building shape of three-dimensional shape data, is smaller than a near net value.
METHOD, DEVICE, AND NON-TRANSITORY COMPUTER READABLE MEDIUM FOR DETERMINING TIMING OF REMOVING SUBSTRATE FROM CASSETTE IN SUBSTRATE PROCESSING DEVICE, AND SUBSTRATE PROCESSING DEVICE
Provided is a method, device, and program for determining a timing of removing a substrate from a cassette in substrate processing device, and substrate processing device. In the method, a tentative removal time point of each substrate is calculated by adding a transfer time to a tentative removal time point of the one previous substrate, wherein the transfer time is required from the start of an action of removing a substrate from the cassette to the end of an action of delivering the substrate to an exchanger.
Lamination planning method for laminate molded object, and laminate molded object manufacturing method and manufacturing device
A building time for building an additively-manufactured object is calculated on the basis of the inter-pass time and the welding pass time and is compared with a preset upper limit value, and welding conditions in a depositing plan are repeatedly modified until the building time is equal to or less than the upper limit value. Alternatively, corrections are repeatedly performed until the shape difference between a building shape of built-up object shape data relating to the additively-manufactured object created on the basis of the inter-pass time and the inter-pass temperature, and a building shape of three-dimensional shape data, is smaller than a near net value.
EVALUATION SYSTEM OF THE PROCESSING TIMES IN THE MANUFACTURING SECTOR
The present invention indicates an information processing system that can be exploited in a large number of manufacturing companies, which work on order.
In such companies, the experience of the workers is a strategic and essential resource; the present invention transforms the substance of such experience, from a purely humanistic entity into a technical factor in all respects: a heritage preserved in the memories of computer systems. The invention consists in teaching the use of known mathematical tools derived from identification theory, to extract and encode the aforementioned wealth of experience. The inventive step consists in the fact that, although the necessary data and information are potentially available, a sample of training data, as such, suitable for using an identification model, is in fact not available, nor it is trivial to derive it from the data that are actually available.
Method, device, and non-transitory computer readable medium for determining timing of removing substrate from cassette in substrate processing device, and substrate processing device
Provided is a method, device, and program for determining a timing of removing a substrate from a cassette in substrate processing device, and substrate processing device. In the method, a tentative removal time point of each substrate is calculated by adding a transfer time to a tentative removal time point of the one previous substrate, wherein the transfer time is required from the start of an action of removing a substrate from the cassette to the end of an action of delivering the substrate to an exchanger.
Processing instructing device, processing instructing method, computer program and processing device
A processing indicating device to improve the efficiency of processing on an object. The device includes a first communication unit which communicates information with a plurality of processing devices for processing the object and a second communication unit which communicates information with a conveyance controlling device controlling conveying of the object to the plurality of processing devices. An arrival time predicting unit predicts on the basis of information received by the second communication unit, the time when the conveying device arrives at one of the processing devices. In addition, a finish time predicting unit receives information and predicts the time when the processing on the object in the one processing device finishes. A processing indicating unit causes processing control information that orders the execution of device state improvement treatment to be transmitted to the one processing device on the basis of the predicted respective times.
Substrate processing device, substrate processing method, and substrate processing system
A second control device of a second substrate processing apparatus determines whether the processing-start expected time for a substrate is equal to or earlier than a processing-start time limit. If the processing-start expected time is equal to or earlier than the processing-start time limit, the second control device allows the second substrate processing apparatus to execute a first schedule and a second schedule that are initial schedules. On the other hand, if the processing-start expected time is later than the processing-start time limit, the second control device changes the initial first schedule and the initial second schedule so that the processing-start expected time becomes equal to or earlier than the processing-start time limit, and the second control device allows the second substrate processing apparatus to execute the first schedule and the second schedule that have been changed.