Patent classifications
G05B2219/34411
Sequence control of program modules
A method for sequence control of program modules, includes providing a control means and a description file having a configuration for controlling a program sequence. The method further includes providing a plurality of program modules which can be executed by a real-time operating system, the program modules being created using one or different programming languages. The method furthermore includes initiating selected program modules by executing specifications in the description file using the control means.
SEQUENCE CONTROL OF PROGRAM MODULES
A method for sequence control of program modules, includes providing a control means and a description file having a configuration for controlling a program sequence. The method further includes providing a plurality of program modules which can be executed by a real-time operating system, the program modules being created using one or different programming languages. The method furthermore includes initiating selected program modules by executing specifications in the description file using the control means.
Method of independent control period allocation of axis in the PLC positioning system
Disclosed embodiments relate to a method of independent control period allocation of axes in a PLC positioning system. In some embodiments, the method includes: dividing the axes into a first axis group including a first control period and a second axis group including a second control period and allocating different control periods for different axes; when position control calculation of the first axis group is requested during position control calculation of the second axis group, performing the position control calculation of the first axis group through task switching by an interrupt; and, after completing the position control calculation of the first axis group, resuming the position control calculation of the second axis group through task switching by an interrupt.
METHOD OF INDEPENDENT CONTROL PERIOD ALLOCATION OF AXIS IN THE PLC POSITIONING SYSTEM
Disclosed embodiments relate to a method of independent control period allocation of axes in a PLC positioning system. In some embodiments, the method includes: dividing the axes into a first axis group including a first control period and a second axis group including a second control period and allocating different control periods for different axes; when position control calculation of the first axis group is requested during position control calculation of the second axis group, performing the position control calculation of the first axis group through task switching by an interrupt; and, after completing the position control calculation of the first axis group, resuming the position control calculation of the second axis group through task switching by an interrupt.