G21C3/335

Fuel Assembly For An SFR Nuclear Reactor, Comprising A Housing Containing A Removably Fastened Upper Neutron Shielding Device
20170352442 · 2017-12-07 ·

Fuel assembly for a nuclear reactor comprising a housing of longitudinal axis (X) having a central section containing nuclear-fuel pins and an upper section, forming a portion of the head of the assembly, containing a upper neutron shielding device (NSD) including neutron absorbers and means for reversibly interlocking with the housing and a moveable weight forming the head of the NSD, which is mounted so as to be able to move translationally relative to the rest of the NSD over a given path, said interlocking means being configured so that the NSD and the housing can be interlocked and uninterlocked by moving the moveable weight along the longitudinal axis by means of a grapple for extraction of the NSD, the claws of this grapple engaging with the moveable weight and the rest of the NSD being in downward longitudinal abutment in the interior of the housing.

Fuel Assembly For An SFR Nuclear Reactor, Comprising A Housing Containing A Removably Fastened Upper Neutron Shielding Device
20170352442 · 2017-12-07 ·

Fuel assembly for a nuclear reactor comprising a housing of longitudinal axis (X) having a central section containing nuclear-fuel pins and an upper section, forming a portion of the head of the assembly, containing a upper neutron shielding device (NSD) including neutron absorbers and means for reversibly interlocking with the housing and a moveable weight forming the head of the NSD, which is mounted so as to be able to move translationally relative to the rest of the NSD over a given path, said interlocking means being configured so that the NSD and the housing can be interlocked and uninterlocked by moving the moveable weight along the longitudinal axis by means of a grapple for extraction of the NSD, the claws of this grapple engaging with the moveable weight and the rest of the NSD being in downward longitudinal abutment in the interior of the housing.

Fuel assembly design concept and mixed cycle length operation method for long cycle length pressurized water reactor operation

In a pressurized water reactor operation method, a fuel assembly including first fuel rods that operates for a preset first operation time and second fuel rods that operates for a second operation time longer than the first operation time is prepared. An operation schedule of a pressurized water reactor is created by mixing the first operation time of the first fuel rods and the second operation time of the second fuel rods. The pressurized water reactor operates by repeating the operation schedule.

Fuel assembly design concept and mixed cycle length operation method for long cycle length pressurized water reactor operation

In a pressurized water reactor operation method, a fuel assembly including first fuel rods that operates for a preset first operation time and second fuel rods that operates for a second operation time longer than the first operation time is prepared. An operation schedule of a pressurized water reactor is created by mixing the first operation time of the first fuel rods and the second operation time of the second fuel rods. The pressurized water reactor operates by repeating the operation schedule.

Mitigation assembly for nuclear reactor comprising a removable sealing plug

A mitigation assembly for a nuclear reactor including a box with an upper portion forming the head of the assembly housing an upper neutron shielding device, including a head including removable lock and a slug installed free to move in translation relative over a given travel distance, the lock being configured such that locking/unlocking between the head and the box can be made by displacement of the slug with an extraction grab with its pawls attached in the slug. The lower part of the upper neutron shielding device includes a cone-shaped sealing block with the tip of the cone oriented downwards, cooperating with a cone-shaped internal surface of the box, a sealing device being formed between the two, the assembly created forming a removable sealing plug.

Mitigation assembly for nuclear reactor comprising a removable sealing plug

A mitigation assembly for a nuclear reactor including a box with an upper portion forming the head of the assembly housing an upper neutron shielding device, including a head including removable lock and a slug installed free to move in translation relative over a given travel distance, the lock being configured such that locking/unlocking between the head and the box can be made by displacement of the slug with an extraction grab with its pawls attached in the slug. The lower part of the upper neutron shielding device includes a cone-shaped sealing block with the tip of the cone oriented downwards, cooperating with a cone-shaped internal surface of the box, a sealing device being formed between the two, the assembly created forming a removable sealing plug.

FUEL ASSEMBLY DESIGN CONCEPT AND MIXED CYCLE LENGTH OPERATION METHOD FOR LONG CYCLE LENGTH PRESSURIZED WATER REACTOR OPERATION

In a pressurized water reactor operation method, a fuel assembly including first fuel rods that operates for a preset first operation time and second fuel rods that operates for a second operation time longer than the first operation time is prepared. An operation schedule of a pressurized water reactor is created by mixing the first operation time of the first fuel rods and the second operation time of the second fuel rods. The pressurized water reactor operates by repeating the operation schedule.

Fuel channel for a nuclear power boiling water reactor

A fuel channel for a nuclear power boiling water reactor is configured to include a bundle of fuel rods with nuclear fuel. The fuel channel is made of a sheet material and has a plurality of sides which have an elongated shape and which are connected to each other such that a corner with an elongated shape is formed where two adjacent sides meet. In one or more corners, the sheet materials from the two adjacent sides overlap with each other such that there is a corner region with double sheet material consisting of the overlapping sheet material from one of the two sides and the overlapping sheet material from the other of the two sides.

Fuel channel for a nuclear power boiling water reactor

A fuel channel for a nuclear power boiling water reactor is configured to include a bundle of fuel rods with nuclear fuel. The fuel channel is made of a sheet material and has a plurality of sides which have an elongated shape and which are connected to each other such that a corner with an elongated shape is formed where two adjacent sides meet. In one or more corners, the sheet materials from the two adjacent sides overlap with each other such that there is a corner region with double sheet material consisting of the overlapping sheet material from one of the two sides and the overlapping sheet material from the other of the two sides.

MITIGATION ASSEMBLY FOR NUCLEAR REACTOR COMPRISING A REMOVABLE SEALING PLUG

The main purpose of the invention is a mitigation assembly (40) for a nuclear reactor comprising a box (41) with an upper portion (41) forming the head of the assembly housing an upper neutron shielding (UNS) device, comprising a head (105) comprising removable locking means (100) and a slug (101) installed free to move in translation relative over a given travel distance, the locking means (100) being configured such that locking/unlocking between the head (105) and the box (41) can be made by displacement of the slug (101) by means of an extraction grab with its pawls attached in the slug (101), characterised in that the lower part of the upper neutron shielding device comprises a cone-shaped sealing block (107) with the tip of the cone oriented downwards, cooperating with a cone-shaped internal surface (108) of the box (41), a sealing device (109) being formed between the two, the assembly created forming a removable sealing plug (110).