Method and system for ecological operation of total phosphorus export of cascade hydropower station
11295245 · 2022-04-05
Assignee
Inventors
- Yu Li (Dalian, CN)
- Jiahui Deng (Dalian, CN)
- Bo Xu (Dalian, CN)
- Wei Ding (Dalian, CN)
- Huicheng Zhou (Dalian, CN)
- Chi Zhang (Dalian, CN)
Cpc classification
Y02E40/70
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
Y04S10/50
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
Y02E10/20
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
G06Q10/04
PHYSICS
G06Q10/06312
PHYSICS
E02B9/00
FIXED CONSTRUCTIONS
International classification
E02B9/00
FIXED CONSTRUCTIONS
G06Q10/06
PHYSICS
Abstract
A method and system for ecological operation of total phosphorus (TP) export of a cascade hydropower station are provided. The method includes: integrating total power generation and TP export of the cascade hydropower station into a single operation objective, and obtaining an operation objective under different weight ratios; optimizing the obtained operation objective; and obtaining a water level operation process corresponding to total power generation and TP export under the current operation objective through the optimized operation objective. The present invention alleviates an ecological and environmental problem caused by the construction of the hydropower station from a water quality mechanism, and can be widely used, for example, in the ecological optimal operation of cascade hydropower stations in a river basin.
Claims
1. A method for ecological operation of total phosphorus (TP) export of a cascade hydropower station, the method comprising: constructing an operation objective of the cascade hydropower station, the operation objective being: D=ω.sub.1.Math.W+ω.sub.2.Math.TP, wherein TP is a TP export of the cascade hydropower station, max TP=Σ.sub.t=1.sup.TQR.sub.k,t.Math.c.sub.k,t.Math.Δt; W is total power generation of the cascade hydropower station, max W=Σ.sub.t=1.sup.TΣ.sub.j=1.sup.kP.sub.j,t.Math.Δt; T is a total number of time periods in an operation period; k is a serial number of a last stage of a hydropower station in the cascade hydropower station; Δt is a time step; j is a serial number of a hydropower station in the cascade hydropower station from upstream to downstream; QR.sub.k,t is a release flow of the hydropower station k in a time period t; c.sub.k,t is an average phosphorus concentration of the hydropower station k in the time period t,
2. The method for ecological operation of TP export of a cascade hydropower station according to claim 1, wherein the set step size is 0.1.
3. The method for ecological operation of TP export of a cascade hydropower station according to claim 1, wherein the optimizing the operation objective under different weight ratios by using a DPSA algorithm to obtain multiple optimal solutions comprises: optimizing a water level of each stage of hydropower station in the cascade hydropower station at different times by using the water level of each stage of hydropower station at different times as a decision variable; obtaining TP export and total power generation corresponding to an optimized water level in different time periods, based on an optimized water level at different times; and obtaining multiple optimal solutions of the operation objective under different weight ratios according to the TP export and the total power generation corresponding to the optimized water level in different time periods.
4. The method for ecological operation of TP export of a cascade hydropower station according to claim 3, wherein the optimizing the operation objective under different weight ratios by using a DPSA algorithm to obtain multiple optimal solutions further comprises: obtaining a constraint condition for the water level to serve as a decision variable, the constraint condition comprising a water balance constraint, a storage capacity constraint, an output constraint and a release flow constraint.
5. A system for ecological operation of total phosphorus (TP) export of a cascade hydropower station, comprising: an operation objective construction module, configured to construct an operation objective of the cascade hydropower station, the operation objective being: D=ω.sub.1.Math.W+ω.sub.2.Math.TP, wherein TP is a TP export of the cascade hydropower station, max TP=Σ.sub.t=1.sup.TQ.sub.k,t.Math.c.sub.k,t.Math.Δt; W is total power generation of the cascade hydropower station, max W=Σ.sub.t=1.sup.TΣ.sub.j=1.sup.kP.sub.j,t.Math.Δt; T is a total number of time periods in an operation period; k is a serial number of a last stage of hydropower station in the cascade hydropower station; Δt is a time step; j is a serial number of a hydropower station in the cascade hydropower station from upstream to downstream; QR.sub.k,t is a release flow of the hydropower station k in a time period t; c.sub.k,t is an average phosphorus concentration of the hydropower station k in the time period t,
6. The system for ecological operation of TP export of a cascade hydropower station according to claim 5, wherein the optimal solution obtaining module comprises: a water level optimization unit, configured to optimize a water level of each stage of hydropower station in the cascade hydropower station at different times by using the water level of each stage of hydropower station at different times as a decision variable; a TP export and total power generation obtaining unit, configured to obtain TP export and total power generation corresponding to an optimized water level in different time periods, based on an optimized water level at different times; and an optimal solution obtaining unit, configured to obtain multiple optimal solutions of the operation objective under different weight ratios according to the TP export and the total power generation corresponding to the optimized water level in different time periods.
7. The system for ecological operation of TP export of a cascade hydropower station according to claim 6, wherein the optimal solution obtaining module further comprises: a constraint condition obtaining unit, configured to obtain a constraint condition for the water level to serve as a decision variable, the constraint condition comprising a water balance constraint, a storage capacity constraint, an output constraint and a release flow constraint.
Description
BRIEF DESCRIPTION OF DRAWINGS
(1) To describe the technical solutions in the embodiments of the present invention or in the prior art more clearly, the following briefly describes the accompanying drawings required for the embodiments. Apparently, the accompanying drawings in the following description show merely some embodiments of the present invention, and a person of ordinary skill in the art may still derive other accompanying drawings from these accompanying drawings without creative efforts.
(2)
(3)
(4)
(5)
(6)
DETAILED DESCRIPTION
(7) The following clearly and completely describes the technical solutions in the embodiments of the present invention with reference to accompanying drawings in the embodiments of the present invention. Apparently, the described embodiments are merely a part rather than all of the embodiments of the present invention. All other embodiments obtained by a person of ordinary skill in the art based on the embodiments of the present invention without creative efforts shall fall within the protection scope of the present invention.
(8) An objective of the present invention is to provide a method and system for ecological operation of TP export of a cascade hydropower station. The present invention proposes for the first time to take TP export as an ecological operation objective to optimize a water level operation process of a cascade hydropower station. The present invention effectively improves the water environment quality in a reservoir area of the cascade hydropower station.
(9) To make the above objects, features, and advantages of the present invention more obvious and easy to understand, the present invention will be further described in detail with reference to the accompanying drawings and the detailed description.
(10)
(11) S100, construct an operation objective of the cascade hydropower station, the operation objective being: D=ω.sub.1.Math.W+ω.sub.2.Math.TP, where TP is a TP export of the cascade hydropower station, max TP=Σ.sub.t=1.sup.TQR.sub.k,t.Math.c.sub.k,t.Math.Δt; W is total power generation of the cascade hydropower station, max W=Σ.sub.t=1.sup.TΣ.sub.j=1.sup.kP.sub.j,t.Math.Δt; T is a total number of time periods in an operation period; k is a serial number of a last stage of hydropower station in the cascade hydropower station; Δt is a time step; j is a serial number of a hydropower station in the cascade hydropower station from upstream to downstream; QR.sub.k,t is a release flow of the hydropower station k in a time period t; c.sub.k,t is an average phosphorus concentration of the hydropower station k in the time period t,
(12)
L.sub.t is a phosphorus load in the time period t; σ is a deposition coefficient; QR.sub.t is an average release capacity in the time period t; V.sub.t is an average storage capacity of the hydropower station k in the time period t; M.sub.t is the total mass of phosphorus in a water body of a reservoir area at a time t; P.sub.j,t is an average output of the power station j in the time period t; t is a serial number of a time period; ω.sub.1 is a weight of the total power generation; ω.sub.2 is a weight of the TP export, ω.sub.1∈[1, 0], ω.sub.2∈[0, 1] and ω.sub.1+ω.sub.2=1;
(13) S101, change the weight ω.sub.2 of the TP export and the weight ω.sub.1 of the total power generation according to a set step size, to obtain an operation objective under different weight ratios;
(14) S102, optimize the operation objective under different weight ratios by using a dynamic programming successive approximation (DPSA) algorithm to obtain multiple optimal solutions; and
(15) S103, obtain a water level operation process corresponding to a maximum optimal solution among the multiple optimal solutions, and use the water level operation process to operate the cascade hydropower station.
(16) Before S100, the operation method provided by the present invention further includes:
(17) obtain various parameters of the cascade power station, including water level-storage capacity curve, water head-water consumption rate curve, installed capacity, guaranteed output, unit maximum discharge capacity constraint, maximum/minimum release flow constraint and phosphorus deposition coefficient, etc.; and
(18) establish an optimal operation model for the cascade power station with maximum generation capacity and maximum TP export as double objectives, where the TP export serves as an ecological objective The established optimal operation model includes an objective function. The objective function includes:
max TP=Σ.sub.t=1.sup.TQR.sub.k,t.Math.c.sub.k,t.Math.Δt,
max W=Σ.sub.t=1.sup.TΣ.sub.j=1.sup.kP.sub.j,t.Math.Δt.
(19) In S100, a variable-weight method is adopted to transform double objectives into a single objective to deal with a multi-objective problem, and a weighted sum of the total power generation and the TP export is used as an operation objective for direct optimization, that is, the operation objective is calculated according to the formula D=ω.sub.1.Math.W+ω.sub.2.Math.TP.
(20) In S100, as a first objective, the TP export is a sum of a product of the release capacity and the phosphorus concentration in different time periods. An average phosphorus concentration c.sub.k,t of each power station in each time period is obtained by recursive simulation by using a mass balance model. The mass balance model is expressed as
(21)
Given the phosphorus load L.sub.t and release flow QR.sub.t in each time period, the total phosphorus M.sub.t and the average storage capacity V.sub.t in all time periods are obtained through the recursive calculation of the mass balance model, that is, c.sub.k,t is equal to
(22)
or a corresponding hydropower station at a corresponding time.
(23) In S101, the weights of the two objectives are changed from [1:0] to [0:1] with a step size of 0.1 to finally obtain an operation objective D under 11 weight ratios. The operation objective D under each of the 11 weight ratios is optimized to obtain 11 objective values of total power generation W and TP export TP.
(24) The DPSA algorithm is one of the effective methods to solve a multi-dimensional problem. By using this algorithm, the present invention optimizes a water level of each power station at each time (i.e. a decision variable in a model) by optimizing a water level of all reservoirs based on the operation objective D.
(25) In S102, the present invention uses the DPSA algorithm to optimize a water level operation process of the cascade power station based on the operation objective under different weight ratios by means of “simulation-optimization.” The present invention obtains a Pareto front solution set of total power generation and TP export (which is a competitive relationship between the total power generation and maximum TP export) and an operation process of each solution (as shown in
(26) optimize by using the water level of all reservoirs in one of the time periods as a variable and assuming the rest to be fixed, where the use of the DPSA algorithm to optimize the water level of each power station has particularity, and the specific optimization process is:
(27) keep the water level of all hydropower stations in other time periods fixed; take a number of discrete points above and below the water level of each hydropower station in the current time period with a certain step size to obtain a discrete combination of water levels of all hydropower stations in the current time period; combine any of the combinations and all other fixed points to form a new water level process; simulate based on the new water level process, and calculate objective function values TP and W and the operation objective D; take a water level corresponding to maximum D as an optimized water level at the current time;
(28) optimize a water level in the next time period based on the above optimization process, and sequentially obtain an optimal solution of a water level in all other time periods;
(29) reduce the discrete step size of the current water level process to perform iterative optimization again; repeat the above process, and end the iteration until a discrete accuracy is less than a certain accuracy; and repeat the above process by using the same method; input an optimization result of the previous cycle to successively iterate and optimize the water level process for multiple cycles; end the entire iterative process when a relative error of two (previous and next) operation objective values meets a certain accuracy. In an optimization result, W and TP corresponding to a maximum operation objective D constitute a Pareto front solution. Each Pareto front solution corresponds to an operation process which is ecologically optimal (or achieves the largest TP export of the cascade power station) under the generation capacity of the Pareto solution. The Pareto front solution can be used to guide the ecological operation of the hydropower station.
(30) The decision variable in the model is the water level of each stage of power station in the cascade power station at each time. A constraint condition of the decision variable includes a water balance constraint, a storage capacity constraint, an output constraint and a release flow constraint.
(31) The water balance constraint is:
(32) S.sub.j,t+1=S.sub.j,t+(QI.sub.j,t−QR.sub.j,t).Math.Δt, where QI.sub.j,t=QR.sub.j-1,t+q.sub.j,t, QR.sub.j,t=QG.sub.j,t+QS.sub.j,t and QR.sub.j,tQG.sub.j,tQS.sub.j,tS.sub.j,t are both greater than or equal to 0; S.sub.j,t is a storage capacity of a reservoir j at a time t; QI.sub.j,t is total inflow of the reservoir j at the time t; QR.sub.j,t is a release flow of the reservoir j at the time t; Δt is a time step; q.sub.j,t is interval confluence of reservoirs j and j−1; QG.sub.j,t is a generation flow of the reservoir j at the time t; QS.sub.j,t is a non-generation flow of the reservoir j at the time t.
(33) The storage capacity constraint is:
(34) S.sub.j.sup.min≤S.sub.j,t≤S.sub.j,t.sup.max, where, S.sub.j.sup.min is a dead water level of the reservoir j, and S.sub.j,t.sup.max is a maximum water level of the reservoir j at the time t.
(35) The output constraint is:
0≤P.sub.j,t≤IC.sub.j;
(36) P.sub.j.sup.min≤P.sub.j,t; where P.sub.j,t is an output of the reservoir j at the time t, IC.sub.j is an installed capacity of the reservoir j, and P.sub.j.sup.min is a minimum output constraint of the reservoir j.
(37) The flow constraint is:
QR.sub.j.sup.min≤QR.sub.j,t≤QR.sub.j.sup.max;
(38) QR.sub.j.sup.min≤QG.sub.j,t≤MIN(QG.sub.j.sup.max,QG.sub.j,t.sup.IC); where QR.sub.j.sup.min and QG.sub.j.sup.max are minimum release flow and maximum release flow of the reservoir j, respectively, and QG.sub.j,t.sup.IC is a flow required for the installed capacity of the reservoir j at the time t.
(39) The operation method provided by the present invention is used to optimize the operation of Xiaowan-Nuozhadu cascade hydropower station on the Lancang River in China. A release process and a composition of release flow of the cascade hydropower station are shown in
(40) An operation objective is obtained according to the formula D=ω.sub.1.Math.W+ω.sub.2.Math.TP. A competitive relationship between a generation capacity and TP export is obtained based on a model optimization result, which is also a competitive relationship between a generation benefit and an ecological benefit. When conditions permit, in order to ensure a certain ecological benefit, the hydropower station arranges a reasonable power generation plan to increase the TP export, and performs ecological operation according to an operation rule extracted from the optimization result.
(41) Compared with the prior art, the operation method provided by the present invention considers a phosphorus retention effect of the cascade hydropower station. In order to alleviate an eutrophication risk in a reservoir area and a lack of phosphorus downstream, the present invention makes the optimization with the goal of maximizing the TP export. The present invention alleviates an ecological and environmental problem of the cascade hydropower station from the physical and chemical characteristics of a water body. Traditional ecological optimal operation methods, such as minimum ecological flow constraint and hydrological regime indicator method, often fail to resolve the underlying causes. The present invention is inclined to improve the ecology from a water quality change mechanism, and provides perfect theoretical support.
(42) In addition, based on the above-mentioned operation method, the present invention provides a system for ecological operation of TP export of a cascade hydropower station. As shown in
(43) The operation objective construction module 1 is configured to construct an operation objective of the cascade hydropower station, the operation objective being: D=ω.sub.1.Math.W+ω.sub.2.Math.TP, where TP is a TP export of the cascade hydropower station, max TP=Σ.sub.t=1.sup.TQ.sub.k,t.Math.c.sub.k,t.Math.Δt; W is total power generation of the cascade hydropower station, max W=Σ.sub.t=1.sup.TΣ.sub.j=1.sup.kP.sub.j,t.Math.Δt; T is a total number of time periods in an operation period; k is a serial number of a last stage of hydropower station in the cascade hydropower station; Δt is a time step; j is a serial number of a hydropower station in the cascade hydropower station from upstream to downstream; QR.sub.k,t is a release flow of the hydropower station k in a time period t; c.sub.k,t is an average phosphorus concentration of the hydropower station k in the time period t,
(44)
L.sub.t is a phosphorus load in the time period t; σ is a deposition coefficient; QR.sub.t is an average release capacity in the time period t; V.sub.t is an average storage capacity of the hydropower station k in the time period t; M.sub.t is the total mass of phosphorus in a water body of a reservoir area at a time t; P.sub.j,t is an average output of the power station j in the time period t; t is a serial number of a time period; ω.sub.1 is a weight of the total power generation; ω.sub.2 is a weight of the TP export, ω.sub.1∈[1, 0], ω.sub.2∈[0, 1] and ω.sub.1+ω.sub.2=1.
(45) The optimized operation objective obtaining module 2 is configured to change the weight ω.sub.2 of the TP export and the weight ω.sub.1 of the total power generation according to a set step size, to obtain an operation objective under different weight ratios.
(46) The optimal solution obtaining module 3 is configured to optimize the operation objective under different weight ratios by using a DPSA algorithm to obtain multiple optimal solutions.
(47) The water level operation process obtaining module 4 is configured to obtain a water level operation process corresponding to a maximum optimal solution among the multiple optimal solutions, and use the water level operation process to operate the cascade hydropower station.
(48) The optimal solution obtaining module 3 includes:
(49) a water level optimization unit, configured to optimize a water level of each stage of hydropower station in the cascade hydropower station at different times by using the water level of each stage of hydropower station at different times as a decision variable;
(50) a TP export and total power generation obtaining unit, configured to obtain TP export and total power generation corresponding to an optimized water level in different time periods, based on an optimized water level at different times; and
(51) an optimal solution obtaining unit, configured to obtain multiple optimal solutions of the operation objective under different weight ratios according to the TP export and the total power generation corresponding to the optimized water level in different time periods.
(52) The optimal solution obtaining module 3 further includes a constraint condition obtaining unit, configured to obtain a constraint condition for the water level to serve as a decision variable, the constraint condition including a water balance constraint, a storage capacity constraint, an output constraint and a release flow constraint.
(53) Each embodiment of the present specification is described in a progressive manner, each embodiment focuses on the difference from other embodiments, and the same and similar parts between the embodiments may refer to each other. For a system disclosed in the embodiments, since it corresponds to the method disclosed in the embodiments, the description is relatively simple, and reference can be made to the method description.
(54) Several examples are used herein for illustration of the principles and embodiments of the present invention. The description of the embodiments is used to help illustrate the method and its core principles of the present invention. In addition, a person of ordinary skill in the art can make various modifications in terms of specific embodiments and scope of application in accordance with the teachings of the present invention. In conclusion, the content of this specification shall not be construed as a limitation to the present invention.