METHOD FOR CONTROLLING WET FLUE GAS DESULFURIZATION DEVICE, DEVICE FOR CONTROLLING WET FLUE GAS DESULFURIZATION DEVICE, AND REMOTE MONITORING SYSTEM COMPRISING DEVICE FOR CONTROLLING WET FLUE GAS DESULFURIZATION DEVICE
20210275964 · 2021-09-09
Assignee
Inventors
- Makoto Kokubo (Yokohama-shi, JP)
- Jin Sudo (Yokohama-shi, JP)
- Shinya KANEMORI (Tokyo, JP)
- Shun Gunji (Yokohama-shi, JP)
Cpc classification
F23J15/04
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
B01D53/30
PERFORMING OPERATIONS; TRANSPORTING
B01D53/504
PERFORMING OPERATIONS; TRANSPORTING
B01D53/507
PERFORMING OPERATIONS; TRANSPORTING
B01D53/80
PERFORMING OPERATIONS; TRANSPORTING
B01D53/502
PERFORMING OPERATIONS; TRANSPORTING
F23J15/006
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F23J15/003
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
B01D2259/126
PERFORMING OPERATIONS; TRANSPORTING
International classification
B01D53/34
PERFORMING OPERATIONS; TRANSPORTING
B01D53/18
PERFORMING OPERATIONS; TRANSPORTING
B01D53/30
PERFORMING OPERATIONS; TRANSPORTING
B01D53/80
PERFORMING OPERATIONS; TRANSPORTING
Abstract
A method for controlling a wet flue gas desulfurization device includes a step of constructing a first learning model by machine learning of a relationship between a future sulfur dioxide concentration at an outlet of the absorption tower, and operation data of the combustion device and operation data of the wet flue gas desulfurization device including a circulation flow rate of the absorption liquid, a step of creating, by using the first learning model, a first relationship table between a circulation flow rate of the absorption liquid at first time and a sulfur dioxide concentration in an effluent gas flowing out of the absorption tower at second time which is time in the future relative to the first time, a step of deciding, based on the first relationship table, the circulation flow rate of the absorption liquid at the first time, at which the sulfur dioxide concentration in the effluent gas at the second time is not more than a preset set value, and a step of adjusting an operation condition of the at least one circulation pump based on the decided circulation flow rate, at the first time.
Claims
1. A method for controlling a wet flue gas desulfurization device including: an absorption tower; and at least one circulation pump for circulating an absorption liquid in the absorption tower, and performing desulfurization by bringing the absorption liquid into gas-liquid contact with an exhaust gas generated in a combustion device, in the absorption tower, the method comprising: a step of constructing a first learning model by machine learning of a relationship between a future sulfur dioxide concentration at an outlet of the absorption tower, and operation data of the combustion device and operation data of the wet flue gas desulfurization device including a circulation flow rate of the absorption liquid; a step of creating, by using the first learning model, a first relationship table between a circulation flow rate of the absorption liquid at first time and a sulfur dioxide concentration in an effluent gas flowing out of the absorption tower at second time which is time in the future relative to the first time; a step of deciding, based on the first relationship table, the circulation flow rate of the absorption liquid at the first time, at which the sulfur dioxide concentration in the effluent gas at the second time is not more than a preset set value; and a step of adjusting an operation condition of the at least one circulation pump based on the decided circulation flow rate, at the first time.
2. The method for controlling the wet flue gas desulfurization device according to claim 1, wherein the operation data of the wet flue gas desulfurization device including the circulation flow rate of the absorption liquid includes: a sulfur dioxide concentration in the effluent gas at any time; and a circulation flow rate of the absorption liquid at time in the past relative to the any time by a time interval obtained by subtracting the first time from the second time.
3. The method for controlling the wet flue gas desulfurization device according to claim 1, wherein the wet flue gas desulfurization device further includes a gas analyzer for measuring the sulfur dioxide concentration in the effluent gas, and wherein the method further includes a step of comparing an analysis result by the gas analyzer acquired at the second time with a predictive value of the sulfur dioxide concentration in the effluent gas at the second time.
4. The method for controlling the wet flue gas desulfurization device according to claim 3, further comprising: after creating the first relationship table, a step of reconstructing, based on a difference between the analysis result and the predictive value of the sulfur dioxide concentration in the effluent gas, the first learning model by machine learning of the relationship between the future sulfur dioxide concentration at the outlet of the absorption tower, and the operation data of the combustion device and the operation data of the wet flue gas desulfurization device including the circulation flow rate of the absorption liquid, and creating the first relationship table by using the reconstructed first learning model.
5. The method for controlling the wet flue gas desulfurization device according to claim 1, wherein the wet flue gas desulfurization device further includes an absorbent slurry supply part for supplying, to the absorption tower, an absorbent slurry which is a slurry of an absorbent included in the absorption liquid, and wherein the method further includes: a step of constructing a second learning model by machine learning of a relationship between a future absorbent concentration, and the operation data of the combustion device and the operation data of the wet flue gas desulfurization device including the circulation flow rate of the absorption liquid; a step of creating, by using the second learning model, a second relationship table between a supply amount of the absorbent slurry to the absorption tower at third time and a concentration of the absorbent in the absorption liquid at fourth time which is time in future relative to the third time; a step of deciding, based on the second relationship table, the supply amount of the absorbent slurry at the third time, in which the concentration of the absorbent at the fourth time falls within a preset setting range; and a step of controlling the absorbent slurry supply part based on the decided supply amount of the absorbent slurry, at the third time.
6. The method for controlling the wet flue gas desulfurization device according to claim 5, wherein the operation data of the wet flue gas desulfurization device including the circulation flow rate of the absorption liquid includes: a concentration of the absorbent at any time; and a supply amount of the absorbent slurry at time in the past relative to the any time by a time interval obtained by subtracting the third time from the fourth time.
7. The method for controlling the wet flue gas desulfurization device according to claim 6, wherein the concentration of the absorbent is calculated with a simulation model by mass balance calculation.
8. The method for controlling the wet flue gas desulfurization device according to claim 5, wherein an interval from the third time to the fourth time is shorter than an interval from the first time to the second time.
9. A device for controlling a wet flue gas desulfurization device including: an absorption tower; and at least one circulation pump for circulating an absorption liquid in the absorption tower, and performing desulfurization by bringing the absorption liquid into gas-liquid contact with an exhaust gas generated in a combustion device, in the absorption tower, the device comprising: a first learning model construction unit for constructing a learning model by machine learning of a relationship between a future sulfur dioxide concentration at an outlet of the absorption tower, and operation data of the combustion device and operation data of the wet flue gas desulfurization device including a circulation flow rate of the absorption liquid; a first relationship table creation unit for creating, by using the learning model, a first relationship table between a circulation flow rate of the absorption liquid at first time and a sulfur dioxide concentration in an effluent gas flowing out of the absorption tower at second time which is time in the future relative to the first time; a circulation flow rate decision unit for deciding, based on the first relationship table, the circulation flow rate of the absorption liquid at the first time, at which the sulfur dioxide concentration in the effluent gas at the second time is not more than a preset set value; and a circulation pump adjustment unit for adjusting an operation condition of the at least one circulation pump based on the decided circulation flow rate, at the first time.
10. The device for controlling the wet flue gas desulfurization device according to claim 9, wherein the wet flue gas desulfurization device further includes an absorbent slurry supply part for supplying, to the absorption tower, an absorbent slurry which is a slurry of an absorbent included in the absorption liquid, and wherein the device further includes: a second learning model construction unit for constructing a second learning model by machine learning of a relationship between a future absorbent concentration, and the operation data of the combustion device and the operation data of the wet flue gas desulfurization device including the circulation flow rate of the absorption liquid; a second relationship table creation unit for creating, by using the second learning model, a second relationship table between a supply amount of the absorbent slurry to the absorption tower at third time and a concentration of the absorbent in the absorption liquid at fourth time which is time in future relative to the third time; an absorbent slurry supply amount decision unit for deciding, based on the second relationship table, the supply amount of the absorbent slurry at the third time, in which the concentration of the absorbent at the fourth time falls within a preset setting range; and an absorbent slurry supply control unit for controlling the absorbent slurry supply part based on the decided supply amount of the absorbent slurry, at the third time.
11. A remote monitoring system, comprising: the device for controlling the wet flue gas desulfurization device according to claim 9; and a remote monitoring device electrically connected to the device for controlling the wet flue gas desulfurization device.
Description
BRIEF DESCRIPTION OF DRAWINGS
[0032]
[0033]
[0034]
[0035]
[0036]
[0037]
[0038]
DETAILED DESCRIPTION
[0039] Embodiments of the present invention will now be described in detail with reference to the accompanying drawings. However, the scope of the present invention is not limited to the following embodiments. It is intended that dimensions, materials, shapes, relative positions and the like of components described in the embodiments shall be interpreted as illustrative only and not intended to limit the scope of the present invention.
[0040] As shown in
[0041] The absorbent slurry supply part 13 includes an absorbent slurry production equipment 21 for producing the absorbent slurry, an absorbent slurry supply pipe 22 for causing the absorbent slurry production equipment 21 and the absorption tower 11 to communicate with each other, and an absorbent slurry supply amount control valve 23 for controlling the flow rate of the absorbent slurry flowing through the absorbent slurry supply pipe 22. The gypsum recovery part 14 includes a gypsum separator 25, a gypsum slurry extraction pipe 26 for causing the gypsum separator 25 and the absorption tower 11 to communicate with each other, and a gypsum slurry extraction pump 27 disposed on the gypsum slurry extraction pipe 26.
[0042] The wet flue gas desulfurization device 10 is provided with a control device 15 of the wet flue gas desulfurization device 10. The control device 15 includes an operation data reception unit 30 electrically connected to an operation data acquisition unit 20, which includes various detectors for acquiring various kinds of operation data (for example, temperatures and pressures in various sections, flow rates of various fluids, and the like) of the combustion device 1 and the wet flue gas desulfurization device 10. The operation data acquisition unit 20 includes the gas analyzer 17.
[0043] The control device 15 includes a first learning model construction unit 38 electrically connected to the operation data reception unit 30, a first relationship table creation unit 31 electrically connected to the first learning model construction unit 38, a circulation flow rate decision unit 32 electrically connected to the first relationship table creation unit 31, and a circulation pump adjustment unit 33 electrically connected to the circulation flow rate decision unit 32. The circulation pump adjustment unit 33 is electrically connected to the circulation pumps 12a, 12b, 12c.
[0044] The control device 15 further includes a second learning model construction unit 39 electrically connected to the operation data reception unit 30, a second relationship table creation unit 35 electrically connected to the second learning model construction unit 39, an absorbent slurry supply amount decision unit 36 electrically connected to the second relationship table creation unit 35, and an absorbent slurry supply control unit 37 electrically connected to the absorbent slurry supply amount decision unit 36. The absorbent slurry supply control unit 37 is electrically connected to the absorbent slurry supply amount control valve 23.
[0045]
[0046] Next, an operation in which the wet flue gas desulfurization device 10 desulfurizes the exhaust gas generated in the combustion device 1 will be described.
[0047] As shown in
[0048] In the absorption tower 11, the rising exhaust gas and the flow-down absorption liquid are brought into gas-liquid contact with each other. SO.sub.2 contained in the exhaust gas reacts with CaCO.sub.3 in the absorption liquid, precipitating gypsum (CaSO.sub.4.2H.sub.2O) in the absorption liquid, as indicated by the following reaction formula:
SO.sub.2+CaCO.sub.3+2H.sub.2O+½O.sub.2.fwdarw.CaSO.sub.4.2H.sub.2O+CO.sub.2
[0049] Since a part of SO.sub.2 in the exhaust gas is thus removed as gypsum into the absorption liquid, that is, the exhaust gas is desulfurized, the SO.sub.2 concentration in the effluent gas flowing out of the absorption tower 11 via the outflow pipe 16 is lower than the SO.sub.2 concentration in the exhaust gas flowing into the absorption tower 11 via the pipe 2. The effluent gas flowing out of the absorption tower 11 flows through the outflow pipe 16 and is released to the atmosphere, in the middle of which the gas analyzer 17 measures the SO.sub.2 concentration, and the measurement result is transmitted to the operation data reception unit 30 of the control device 15.
[0050] The SO.sub.2 concentration in the effluent gas tends to decrease as the circulation flow rate of the absorption liquid circulating in the absorption tower 11 increases, unless a CaCO.sub.3 concentration in the absorption liquid fluctuates greatly. Controlling the circulation flow rate by controlling the number of circulation pumps 12a to 12c in operation by the control device 15 with a control method to be described later, it is possible to control the SO.sub.2 concentration in the effluent gas, for example, it is possible to control the SO.sub.2 concentration in the effluent gas to be not more than a preset set value.
[0051] The gypsum precipitated in the absorption liquid in the absorption tower 11 is extracted from the absorption tower 11 by the gypsum slurry extraction pump 27 as the gypsum slurry. The gypsum slurry flows through the gypsum slurry extraction pipe 26 and flows into the gypsum separator 25. The gypsum and water are separated from each other in the gypsum separator 25. The gypsum is recovered, and the water is sent to a drainage facility (not shown).
[0052] CaCO.sub.3 in the absorption liquid reacts with SO.sub.2 to be gypsum, decreasing the CaCO.sub.3 concentration in the absorption liquid as the exhaust gas is desulfurized. With the control method to be described later, the control device 15 controls the opening degree of the absorbent slurry supply amount control valve 23, and supplies the absorbent slurry produced in the absorbent slurry production equipment 21 into the absorption tower 11 via the absorbent slurry supply pipe 22. Thus, the CaCO.sub.3 concentration in the absorption liquid falls within a preset setting range, suppressing a large fluctuation in CaCO.sub.3 concentration during desulfurization of the exhaust gas.
[0053] Next, the method for controlling the wet flue gas desulfurization device 10 by the control device 15 will be described.
[0054]
[0055] Moreover, after step S1, besides steps S2 to S5, in step S12, a second learning model is constructed by machine learning of the relationship between the various kinds of operation data and a future CaCO.sub.3 concentration in absorption liquid. Next, in step S13, a second relationship table to be described later is created by using the constructed second learning model.
[0056] In subsequent step S14, an absorbent slurry supply amount, in which the CaCO.sub.3 concentration falls within a preset setting range, is decided based on the second relationship table. In step S15, controlling the absorbent slurry supply part 13, that is, controlling the opening degree of the absorbent slurry supply amount control valve 23, the absorbent slurry is supplied into the absorption tower 11 by the decided supply amount. Thus, the CaCO.sub.3 concentration in the absorption liquid falls within the preset setting range, suppressing a large fluctuation in CaCO.sub.3 concentration during desulfurization of the exhaust gas.
[0057] Next, the respective steps of the method for controlling the wet flue gas desulfurization device 10 by the control device 15 will be described in detail.
[0058] In step S1, as shown in
[0059] In step S2, the first learning model construction unit 38 constructs the first model by machine learning of the relationship between the various kinds of operations collected by the control device 15 and the future SO.sub.2 concentration in the effluent gas. In step S3, using the constructed first learning model, the first relationship table creation unit 31 creates the first relationship table indicating correlation between a circulation flow rate of the absorption liquid at first time and a predictive value of the SO.sub.2 concentration in the effluent gas at second time which is time in the future relative to the first time. Since the first relationship table is created by using the first learning model constructed by machine learning, it is possible to rapidly create the first relationship table.
[0060] In the first relationship table, provided that the circulation flow rate of the absorption liquid and the predictive value of the SO.sub.2 concentration in the effluent gas are different in time and the circulation flow rate of the absorption liquid is set to a current value, the predictive value of the SO.sub.2 concentration in the effluent gas is, for example, a predictive value of the SO.sub.2 concentration a few minutes later from now. Thus, the various kinds of operation data at least include the SO.sub.2 concentration in the effluent gas at any time and the circulation flow rate of the absorption liquid at time in the past relative to the any time by a time interval obtained by subtracting the first time from the second time. The future SO.sub.2 concentration is predicted directly from the actual operation data including the SO.sub.2 concentration in the effluent gas at the any time and the circulation flow rate of the absorption liquid at time in the past relative to the any time by the time interval obtained by subtracting the first time from the second time, making it possible to improve predictive performance of the future SO.sub.2 concentration. The predictive performance of the future SO.sub.2 concentration improves, as the interval between the first time and the second time is short. Thus, the interval between the first time and the second time is preferably the sum of a time taken until the SO.sub.2 concentration in the effluent gas changes due to a change in circulation flow rate of the absorption liquid and a time required for the gas analyzer 17 to measure the SO.sub.2 concentration.
[0061]
[0062]
[0063] In step S5, as shown in
[0064] Note that adjustment of the circulation flow rate is not limited to be performed by controlling the number of circulation pumps. The supply amount of the circulation pump may be adjusted to obtain the circulation flow rate decided by the circulation flow rate decision unit 32, by using one circulation pump capable of adjusting the supply amount.
[0065] Thus adjusting the circulation flow rate of the absorption liquid circulating in the absorption tower 11, it is possible to control the future SO.sub.2 concentration in the effluent gas to be not more than the preset set value. However, this requires that there is no large fluctuation in CaCO.sub.3 concentration in the absorption liquid. Accordingly, in the present embodiment, as described above, besides steps S2 to S5, in steps S12 to S15, the CaCO.sub.3 concentration in the absorption liquid is controlled to fall within the preset setting range. Next, each of steps S12 to S15 will be described in detail.
[0066] In step S12, the second learning model construction unit 39 constructs the second learning model by machine learning of the relationship between the various kinds of operation data collected by the control device 15 and the future CaCO.sub.3 concentration in the absorption liquid in the absorption tower 11. In step S13, using the constructed second learning model, the second relationship table creation unit 35 creates the second relationship table indicating correlation between a supply amount of the absorbent slurry to the absorption tower 11 at third time and a predictive value of the CaCO.sub.3 concentration at fourth time which is time in the future relative to the third time. Since the second relationship table is created by using the second learning model constructed by machine learning, it is possible to rapidly create the second relationship table.
[0067] In the second relationship table, provided that the supply amount of the absorbent slurry to the absorption tower 11 and the predictive value of the CaCO.sub.3 concentration are different in time and the supply amount of the absorbent slurry is set to a current value, the predictive value of the CaCO.sub.3 concentration is, for example, a predictive value of the CaCO.sub.3 concentration a few minutes later from now. Thus, the various kinds of operation data at least include the CaCO.sub.3 concentration at any time and the supply amount of the absorbent slurry at time in the past relative to the any time by a time interval obtained by subtracting the third time from the fourth time. The future CaCO.sub.3 concentration is predicted directly from the actual operation data including the CaCO.sub.3 concentration at the any time and the supply amount of the absorbent slurry at the time in the past relative to the any time by the time interval obtained by subtracting the third time from the fourth time, making it possible to improve predictive performance of the future CaCO.sub.3 concentration.
[0068] In the present embodiment, the CaCO.sub.3 concentration at the any time uses a value calculated with a simulation model by mass balance calculation. A sensor for detecting the CaCO.sub.3 concentration is generally expensive. Thus, providing such a sensor increases the cost of the wet flue gas desulfurization device 10. However, if the CaCO.sub.3 concentration is calculated with the simulation model by mass balance calculation, the expensive sensor is no longer needed, making it possible to suppress the increase in cost of the wet flue gas desulfurization device 10.
[0069] The predictive performance of the future CaCO.sub.3 concentration improves, as the interval between the third time and the fourth time is short. Thus, the interval between the third time and the fourth time is preferably a time taken until the CaCO.sub.3 concentration changes due to a change in supply amount of the absorbent slurry. A transition of the predictive value of the supply amount of the absorbent slurry and the transition of the true value are in the same relationship as the transition of the predictive value of the SO.sub.2 concentration (top graph) and the transition of the true value (bottom graph) in
[0070] In general, the number of steps required for the SO.sub.2 concentration in the effluent gas flowing out of the absorption tower 11 to change is larger than the number of steps required for the CaCO.sub.3 concentration to change. Thus, a delay in control of the SO.sub.2 concentration is long, as compared with control of the CaCO.sub.3 concentration. Thus, making the time from the third time to the fourth time shorter than the time from the first time to the second time, it is possible to appropriately consider an influence of the control delay. Accordingly, it is possible to further improve predictive performance of the future CaCO.sub.3 concentration.
[0071]
[0072] In step S15, as shown in
[0073] As described above, the future SO.sub.2 concentration is predicted directly from the actual operation data, by creating the first relationship table between the circulation flow rate of the absorption liquid at the first time and the SO.sub.2 concentration in the effluent gas flowing out of the absorption tower 11 at the second time which is the time in the future relative to the first time, from the operation data of the combustion device 1 and the operation data of the wet flue gas desulfurization device 10 including the circulation flow rate of the absorption liquid. Thus, it is possible to obtain the first relationship table improved in predictive performance of the future SO.sub.2 concentration. Based on the obtained first relationship table, the circulation flow rate of the absorption liquid at the first time at which the SO.sub.2 concentration in the effluent gas at the second time is not more than the preset set value is decided, and at the first time, the operation conditions of the circulation pumps 12a to 12c are adjusted based on the decided circulation flow rate. Thus, it is possible to appropriately adjust the operation conditions of the circulation pumps 12a to 12c.
[0074] In the present embodiment, the CaCO.sub.3 concentration in the absorption liquid is set within the preset setting range by steps S12 to S15. However, it is possible to eliminate the need for respective steps S12 to S15, if, for example, the CaCO.sub.3 concentration in the absorption liquid is actually measured by a sensor, and the supply amount of the absorbent slurry to the absorption tower 11 is adjusted as needed based on the actual measurement value. In this case, the control device 15 may not include the second learning model construction unit 39, the second relationship table creation unit 35, the absorbent slurry supply amount decision unit 36, and the absorbent slurry supply control unit 37.
[0075] As shown in
[0076] Moreover, in the configuration of
[0077] In the present embodiment, CaCO.sub.3 is used as the SO.sub.2 absorbent. However, the SO.sub.2 absorbent is not limited to CaCO.sub.3. As the SO.sub.2 absorbent, for example, magnesium hydroxide (Mg(OH).sub.2) or the like can also be used.
REFERENCE SIGNS LIST
[0078] 1 Combustion device [0079] 2 Pipe [0080] 3 Circulation pipe [0081] 10 Wet flue gas desulfurization device [0082] 11 Absorption tower [0083] 12a Circulation pump [0084] 12b Circulation pump [0085] 12c Circulation pump [0086] 13 Absorbent slurry supply part [0087] 14 Gypsum recovery part [0088] 15 Control device [0089] 16 Outflow pipe [0090] 17 Gas analyzer [0091] 21 Absorbent slurry production equipment [0092] 22 Absorbent slurry supply pipe [0093] 23 Absorbent slurry supply amount control valve [0094] 25 Gypsum separator [0095] 26 Gypsum slurry extraction pipe [0096] 27 Gypsum slurry extraction pump [0097] 30 Operation data reception unit [0098] 31 First relationship table creation unit [0099] 32 Circulation flow rate decision unit [0100] 33 Circulation pump adjustment unit [0101] 34 Comparison unit [0102] 35 Second relationship table creation unit [0103] 36 Absorbent slurry supply amount decision unit [0104] 37 Absorbent slurry supply control unit [0105] 38 First learning model construction unit [0106] 39 Second learning model construction unit [0107] 40 Remote monitoring system [0108] 41 Distributed control system (DCS) [0109] 42 Edge server [0110] 43 Remote monitoring device