CONSTRUCTION ASSEMBLY MADE WITH FIBER GLASS
20210131116 · 2021-05-06
Inventors
Cpc classification
E04F13/0862
FIXED CONSTRUCTIONS
B32B27/12
PERFORMING OPERATIONS; TRANSPORTING
B32B3/04
PERFORMING OPERATIONS; TRANSPORTING
B32B5/26
PERFORMING OPERATIONS; TRANSPORTING
E04F13/0866
FIXED CONSTRUCTIONS
B32B13/14
PERFORMING OPERATIONS; TRANSPORTING
B32B5/18
PERFORMING OPERATIONS; TRANSPORTING
B32B7/12
PERFORMING OPERATIONS; TRANSPORTING
B32B9/005
PERFORMING OPERATIONS; TRANSPORTING
B32B9/002
PERFORMING OPERATIONS; TRANSPORTING
B32B21/10
PERFORMING OPERATIONS; TRANSPORTING
E04D3/18
FIXED CONSTRUCTIONS
B32B3/266
PERFORMING OPERATIONS; TRANSPORTING
B32B2307/3065
PERFORMING OPERATIONS; TRANSPORTING
B32B2266/0228
PERFORMING OPERATIONS; TRANSPORTING
B32B17/04
PERFORMING OPERATIONS; TRANSPORTING
B44C5/0423
PERFORMING OPERATIONS; TRANSPORTING
E04F13/0875
FIXED CONSTRUCTIONS
B32B2262/106
PERFORMING OPERATIONS; TRANSPORTING
B32B15/14
PERFORMING OPERATIONS; TRANSPORTING
B32B2307/7145
PERFORMING OPERATIONS; TRANSPORTING
B32B2451/00
PERFORMING OPERATIONS; TRANSPORTING
International classification
Abstract
Provided is a construction assembly comprising: a. a base; b. a layer of glass fiber placed directly on the base; and c. a decorative layer having a plurality of tiles placed immediately on the glass fiber, wherein the glass fiber is mixed with a hardener and a resin to attach the glass fiber directly to the base and the decorative layer.
Claims
1. A construction assembly comprising: a. a base; b. a layer of glass fiber placed directly on the base; and c. a decorative layer having a plurality of tiles placed immediately on the glass fiber, wherein the glass fiber is mixed with a hardener and a resin to attach the glass fiber directly to the base and the decorative layer.
2. The construction assembly of claim 1, wherein the hardener percentage compared to the resin is between 1%-2% weight/weight at STP.
3. The construction assembly of claim 1, wherein the glass fiber is in form of a sheet.
4. The construction assembly of claim 1, wherein the glass fibers are in form of chopped fibers.
5. The construction assembly of claim 1, wherein an additional chemical compound acting an adhesive is not used in between the fiber glass and the decorative layer.
6. The construction assembly of claim 1, wherein the resin is selected from the group consisting of one or more of polyester, vinyl ester, epoxy resin, isophthalic, and mixture thereof.
7. The construction assembly of claim 1, wherein the resin is a polyester resin, the hardener is Methyl Ethyl Ketone Peroxide (MEKP).
8. The construction assembly of claim 7, wherein the combination of the percentage of the hardener is 1 to 1.25 relative to the polyester weight/weight at STP.
9. The construction assembly of claim 7, wherein the combination of the percentage of the hardener is 1 to 1.1 relative to the polyester weight/weight at STP.
10. The construction assembly of claim 1, wherein the base is made from wood, metal or concrete.
11. The construction assembly of claim 1, wherein the base is made from wood with a pre-applied layer of caulking to fill any of the gaps of the base.
12. The construction assembly of claim 1, wherein the hardener is an aliphatic, cycloaliphatic, or an aromatic amine and the resin is epoxy based.
13. The construction assembly of claim 1, wherein Calcium Carbonate is added to the mixture of the hardener and the resin.
14. A construction assembly made by a process comprising the steps of: a. combining a hardener with a resin to obtain a mixture; b. placing glass fibers on top of a base; c. applying the mixture to the glass fibers on the wood; and d. placing tiles on the glass fibers that area treated by the mixture.
15. A roof construction assembly comprising: a. a top and a bottom board made from wood; b. a plurality of rafters for connecting the boards; c. a plurality of plastic foams placed on between the rafters; and d. a layer of glass fiber under the bottom layer.
16. The roof assembly of claim 15, wherein the construction assembly is prefabricated.
17. The roof assembly of claim 15, further comprising a bracket extending from top of the assembly.
18. The roof assembly of claim 15, further comprising a layer of glass fiber on top of the top board, and a plurality of decorative elements on top of the fiberglass.
19. The roof assembly of claim 15, wherein the plastic foams are in form of a sheet.
20. The roof assembly of claim 15, wherein the layer of fiberglass is all around the assembly.
Description
BRIEF DESCRIPTION OF THE FIGURES
[0006]
[0007]
[0008]
[0009]
[0010]
[0011]
[0012]
[0013]
DETAILED DESCRIPTION OF THE INVENTION
[0014] Provided is a method for putting tiles 3 and other similar decorative products on walls, decks, roofs, flooring, building facades, kitchen counters, walls, and patio grills. The base 1 of the structure can be a wooden or metal base. The base 1 can be perforated or non-perforated metal, wood, GRP (Glass Reinforced Plastic), or FRP (Fiber-reinforced plastic) structure. A fiberglass 2 layer is placed immediately above the base 1 in physical contact with the base 1, and decorative members such as tiles 3 and stones on top, also in physical contact with the fiber glass 2 layer. These products are easy to install, strong and leak proof. They are also fire, cold, warm, wind and sunlight resistant, and therefore have high durability. This method of construction can be used in many different applications especially in custom designed houses, residential homes, and apartments. Other uses include use in overhead shades for parking and solar panels.
[0015] The base 1 can be made from a perforated or non-perforated metal, wood, GRP (Glass Reinforced Plastic), or FRP. Fiber-reinforced plastic (FRP)(also called fiber-reinforced polymer, or fiber-reinforced plastic) is a composite material made of a polymer matrix reinforced with fibers. The base 1 can for example be a drywall or floor for placement of a tile. The base 1 can be the wooden support of a roof.
[0016] Glass fibers 2 are put immediately on top of the base 1. Fiberglass 2 layers, with different fabric reinforcements such as cloth. matt, roving, KNYTEX (made with a stitch-bonding process by combining layers of ±45° unidirectional fabric with chopped strand mat), with different weights, and different materials such as E-Glass (alumino-borosilicate glass with less than 1% w/w alkali oxides, mainly used for glass-reinforced plastics), S-Glass (alumino silicate glass without CaO but with high MgO content with high tensile strength), carbon, graphite, carbon fiber, and Aramid (TWARON and KEVLAR) can be used as the fiber reinforcement.
[0017] Decorative products, such as tiles, stones, porcelain, ceramic, and facade bricks are placed immediately on the glass fiber 2.
[0018] To activate the glass fibers 2, a mixture 8 of a resin 31 and a catalyst hardener 30 is added to the glass 2 fibers. The mixture 31 can further optionally have calcium carbonate 32. After the mixture is applied to the glass fibers 2, the glass fibers 2 form a viscous sticky liquid, which is optimal for placement of tiles. An additional layer of adhesive is not needed.
[0019] Examples of resins 31 include polyester, vinyl ester, epoxy resin, and isophthalic.
[0020] Examples of hardeners 30 include Methyl Ethyl Ketone Peroxide (MEKP) and amines, such an aliphatic, cycloaliphatic, or an aromatic amine.
[0021] Hardener percentage can be between 1%-2% weight/weight compared to the resin at STP (Standard temperature and pressure).
[0022] Caulking 4, plaster and other filling agents can be used to fill in between the tiles or fill in the base 1 (if perforated metal, woven wire mesh or if the wood has imperfections).
[0023] The fiberglass 2 layer after activation with the resin/hardener, acts as the binder between the base 1 structure and the decorative products such as tiles 3.
[0024] Different resins 31 such as polyester, vinyl ester, epoxy resin, or isophthalic and their hardeners 30 can be used in the fiberglass 2 layers to adhere all the components together.
[0025] These construction assemblies can be either pre-made (prefabricated) and get installed later or they can be made onsite depending on the application. For example, in applications for walls, precast sheets of this assembly can be attached to building posts using bolts and nuts. For flooring applications, they can be made onsite. For example, fiberglass 2 can be put on top of dried cement and tiles 3, stones, and can be put on top, or the precast sheets can be installed on top of cement using expansion anchor bolts. For wooden roofs with small slopes, the layers of fiberglass 2 and then tiles 3, stones, bricks, or other materials can be installed on top of it onsite. For high slope roofs, precast roofs (as illustrated in
[0026] The base 1 layer can be made of wood, metal or concrete. The preferred base 1 for use can be wood. When making the assembly, a completely dry wood is used with all the cracks and small grooves filled, such as with fiberglass 2. Caulking 4 can be used to fill spaces between different boards. Use of resin 31 in fiberglass 2 makes the base 1 more resistant to termites.
[0027] After caulking 4, the surface can be leveled and smoothed by sand paper. Two or three fiberglass 2 layers can be used for ordinary roof/floor/deck/wall. To increase flexibility and cushioning property of the roofs/floors/deck, especially when the base 1 is made of wood, it is preferred to use excess layers of fiberglass 2. In this embodiment, a combination of chopped fiber glass (
[0028] Use of rollers to prevent formation of air bubbles is preferred. After putting the second layer of fiberglass 2 let it dry for 24 hours, then the third layer and tiles will be applied. Caulking 4 will be done after 24 hours of putting tiles. Fiberglass 2 layer made of hardener 1% is more flexible than fiberglass 2 made of denser hardener. Best temperature range is between 65-75 degrees Fahrenheit. Fiberglass gel time is between 15-25 minutes depending on temperature and amount of hardener. Best time for installing the tiles is before gel time. Spacer can be used to build certain space for caulking 4 between tiles. Final caulking 4 is preferably done at least 24 hours after installing tiles. Different colors can be added for a better look of caulking 4.
[0029] Perforated sheet metal used for a wall is preferred over non-perforated because bilateral connection is made through the holes. A layer of fiberglass 2 is attached to the surface of tile 3 (stones/ceramics/porcelains). An additional layer of fiber glass can be used for heavier stones/ceramics/tiles. After 24 hours, when it is completely dry, it would then adhere to fresh outer fiberglass 2 layer of the wall/roof. The procedure of using different resins is the same.
[0030] The following table illustrates the amount of MEKP used for polyester and vinyl ester resin, preferably polyester resin:
TABLE-US-00001 Polyester Resin 1% 1.25% 1.5% Weight to weight MEKP MEKP MEKP 1.75% 4 ounces 1/32 1.50 1.75 1/16+ Ounces ounces ounces
[0031] Other resin and hardener combinations can also be used. For example, if an epoxy resin is used, the hardener can be an aliphatic, cycloaliphatic, or an aromatic amine for epoxy.
[0032]
[0033]
[0034]
[0035]