Method for toppling tower building in which base is used
11053705 ยท 2021-07-06
Assignee
Inventors
Cpc classification
E04H12/348
FIXED CONSTRUCTIONS
Y10T29/49815
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
International classification
Abstract
To provide a method of toppling a tower structure more safely, simply and quickly than in the conventional manner. In a method of toppling a tower structure that is fixedly supported on a base 20 to demolish the tower structure 10, the method includes a base dividing step of dividing the base 20 into an upper base 22 and a lower base 26, by cutting the base 20 in a substantially horizontal direction, an upper base dividing step of dividing the upper base 22 into a support base portion 23 and a separated base portion 24 by cutting the upper base 22, in a longitudinal direction, from above to a substantially horizontal surface 20a, a removing step of removing the separated base portion 24, and a toppling step of toppling the tower structure 10 together with the support base portion 23 using, as a tumble axis 23a, a lower edge of a longitudinally cut surface 22a of the support base portion 23, in which the tumble axis 23a is located on a toppling direction side of the tower structure with respect to a center of gravity C. Thus, since the tumble axis 23a of the robust base serves as a tumble fulcrum by itself, there is no possibility that breakage of the base is caused even by the concentration of a buckling load, and the tower structure can be toppled in an intended direction.
Claims
1. A method of toppling a tower structure that is fixedly supported on a base fixed to a ground to demolish the tower structure, the method comprising: a base dividing step of dividing the base into an upper base that is fixed to the tower structure and a lower base that is fixed to a ground, by cutting the base in a substantially horizontal direction; an upper base dividing step of dividing the upper base into a support base portion on which the tower structure is fixedly supported and a separated base portion that is separated from the tower structure by cutting the upper base, in a longitudinal direction, from above to a substantially horizontal surface created by the cutting in the substantially horizontal direction; a removing step of removing the separated base portion; and a toppling step of toppling the tower structure together with the support base portion using, as a tumble axis, a lower edge of a longitudinally cut surface created by cutting the support base portion in the longitudinal direction, wherein the tumble axis is located on a toppling direction side of the tower structure with respect to a center of gravity of the tower structure when viewed in an axial direction of the tumble axis.
2. The method of toppling a tower structure according to claim 1, wherein the longitudinally cut surface has an oblique cross section which gradually approaches a center-of-gravity side of the tower structure as it extends from above to below.
3. The method of toppling a tower structure according to claim 1, wherein a shortest distance from the center of gravity of the tower structure to the tumble axis in the substantially horizontal surface is equal to or smaller than of a shortest distance from the center of gravity to a side surface portion of the base in the substantially horizontal surface.
4. The method of toppling a tower structure according to claim 1, wherein a continuous portion in which the lower base and the support base portion are not completely disconnected is provided in a region including the tumble axis and a vicinity of the tumble axis, and a strength of the continuous portion is a strength sufficient to break the continuous portion in a process of toppling of the tower structure in the toppling step.
5. The method of toppling a tower structure according to claim 1, wherein the toppling step includes a push-up operation of pushing up a bottom surface of the support base portion by a push-up means provided on the lower base after the base dividing step.
6. The method of toppling a tower structure according to claim 1, wherein a partially removing step of the lower base of removing a part of the lower base on the toppling direction side of the tower structure with respect to the tumble axis is provided between the removing step and the toppling step.
Description
BRIEF DESCRIPTION OF DRAWINGS
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
(13)
DESCRIPTION OF EMBODIMENTS
(14) Next, embodiments of the present invention will be described in detail based on the drawings. A method of toppling a tower structure that is fixedly supported on a base fixed to a ground to demolish the tower structure will be described with referent to
(15) As illustrated in
(16) The tower structure 10 is fixedly supported on a base 20 made of reinforced concrete via the tower 12. The base 20 is firmly fixed to piles (not illustrated) driven into a ground G. That is, the base 20 is firmly fixed on the ground G via the piles which are a part of the base 20. Note that the piles are not necessarily provided, and can be arbitrarily selected according to the type of the ground G and the height of the tower structure.
(17) Next, each step of the method of toppling the tower structure of the present invention will be described. The method of toppling the tower structure of the present invention includes a base dividing step, an upper base diving step, a removing step, and a toppling step.
(18) [Base Dividing Step]
(19) The base dividing step will be described with reference to
(20) The base 20 is divided into an upper base 22 and a lower base 26 by a substantially horizontal surface 20a created by the cutting in the substantially horizontal direction. The substantially horizontal surface 20a need not be perfectly horizontal, and may have a slightly oblique cross section (this concludes the description of the base dividing step).
(21) [Upper Base Dividing Step]
(22) Next, the upper base dividing step will be described with reference to
(23) [Removing Step]
(24) The separated base portion 24 is removed before the toppling step. One end of a wire rope (not illustrated) is fixed to the separated base portion 24, and the other end of the wire rope is towed by a winch or a vehicle, so that the separated base portion 24 can be removed. The fixing of the one end of the wire rope to the separated base portion 24 is achieved by providing a U-shaped hook, an L-shaped hook or the like on the surface of the separated base portion 24 by which the one end of the wire rope is anchored therein, for example.
(25) After the separated base portion 24 is removed, a boundary line (a lower edge 22aa of the longitudinally cut surface 22a) between the substantially horizontal surface 20a and the longitudinally cut surface 22a in the support base portion 23 serves as a tumble axis 23a, as will be described later in the toppling step. It is preferable that the tumble axis 23a is located on a toppling direction side (the left side in the drawing) of the tower structure 10 with respect to the center of gravity C of the tower structure 10 in a side view, as illustrated in
(26) [Partially Removing Step of Lower Base]
(27) In this step, a part of the lower base 26 on the toppling direction side of the tower structure 10 with respect to the tumble axis 23a is removed. In the present embodiment, as illustrated in
(28) Note that the cut portion 29 to be removed is set so that a length from the position 26a to the tumble axis 23a on the substantially horizontal surface 20a is smaller than the length of the longitudinally cut surface 22a. This is because the tower structure 10 can be toppled in the intended direction more securely, as will be described later.
(29) In addition, in the present embodiment, a push-up means is provided on the lower base 26 after the base dividing step. For example, a jack can be used for the push-up means 28.
(30) For example, as illustrated in
(31)
(32) In the present embodiment, the magnitude of D.sub.ac is compared with the magnitude of D.sub.sc when the substantially horizontal surface 20a has a circular cross section. However, even when the shape of the substantially horizontal surface 20a is another shape such as a square shape, a hexagonal shape, a four angle star-like shape, the above-described relationship in magnitude between D.sub.ac and D.sub.sc is similarly applied.
(33) [Toppling Step]
(34) Next, the toppling step will be described with reference to
(35) The toppling step includes a push-up operation of pushing up a bottom surface 23b (a cross section 20a) of the support base portion 23 by the push-up means 28. As illustrated in
(36) Note that after the pushed-up height of the push-up means 28 provided in the recess 27 becomes maximum during the push-up operation, another push-up means 28 is further provided on the lower base 26 as illustrated in
(37) Therefore, according to the method of toppling the tower structure according to the present embodiment, the base 20 is divided into the upper base 22 and the lower base 26, the upper base 22 is divided into the support base portion 23 on which the tower structure 10 is fixedly supported and the separated base portion 24 to remove the separated base portion 24, and the support base portion 23 is toppled around the tumble axis 23a, whereby the tower structure 10 can be toppled simply and quickly.
(38) At this time, since the tumble axis 23a (tumble fulcrum) is formed by the robust base 20, the tumble axis 23a can be held even when a buckling load is concentrated on the tumble axis 23a, whereby the tower structure 10 can be toppled in the intended direction, which ensures safety.
(39) In addition, since the robust base 20 serves as a tumble fulcrum by itself, the tower structure 10 can be toppled without the need to reinforce the tumble fulcrum and more simply and quickly than the conventional toppling method which requires a reinforcement of the tumble fulcrum.
(40) Furthermore, as illustrated in
(41) In addition, since the longitudinally cut surface 22a has an oblique cross section which gradually approaches the center-of-gravity C side of the tower structure 10 as it extends from above to below, the tumble axis 23a can be closer to the center of gravity C of the tower structure 10. Therefore, the tower structure 10 can be toppled more easily than a case where the longitudinally cut surface 22a is substantially perpendicular to the substantially horizontal surface 20a.
(42) In addition, since the shortest distance D.sub.ac from the center of gravity C of the tower structure 10 to the tumble axis 23a in the substantially horizontal surface 20a is equal to or smaller than of the shortest distance D.sub.sc from the center of gravity C to the side surface portion 26a of the base 20 (26) in the substantially horizontal surface 20a, the tumble axis 23a is located at a position closer to the center of gravity C in the substantially horizontal surface 20a, the center-of-gravity movement distance in the toppling step is reduced, and the tower structure 10 transitions to the natural toppling due to the own weight, immediately. Therefore, the tower structure 10 can be toppled more simply and rapidly with a lower force.
(43) Furthermore, since the toppling step includes a push-up operation by the push-up means 28, the lower base 26 can be used as a reaction force receiving surface as it is by providing the push-up means 28 on the lower base 26, and the tower structure 10 can be toppled by the simple operation of pushing up the bottom surface of the support base portion 23.
(44) In addition, when the tower structure 10 is toppled in the toppling step, the support base portion 23 can drop into a region in which a part (the cut portion 29) of the lower base 26 has been removed, whereby the tower structure 10 can be toppled in the intended direction more securely.
(45) Note that the present invention is not limited to the above-described embodiment, and can be modified in various ways without departing from the gist of the invention. For example, in the above-described embodiment, the lower base 26 is completely separated from the support base portion 23, but even after the partially removing step of the lower base, the lower base 26 need not be completely separated from the support base portion 23.
(46)
(47) As illustrated in
(48) The strength of the continuous portion 31 is a strength sufficient to break the continuous portion 31 in a process of toppling of the tower structure 10 in the toppling step. Therefore, a tensile force in an up-down direction acts on the continuous portion 31 along with the push-up operation by the push-up means 28 in the toppling step, and the continuous portion 31 breaks as illustrated in
(49) According to the continuous portion 31, since the continuous portion 31 connects between the lower base 26 and the support base portion 23 in an early stage of the toppling step, shifting of the tumble axis 23a (for example, the support base portion 23 is turned in the direction around an axis of the center of gravity C with respect to the lower base 26, or the like) in the early stage of the toppling step can be prevented. In the intermediate stage or later of the toppling step, the continuous portion 31 breaks by the turning of the support base portion 23 around the tumble axis 23a, whereby the tower structure 10 can be toppled. In this way, the tower structure 10 can be toppled in the intended direction more securely.
(50) In the above-described embodiment, the push-up operation by the push-up means 28 causes the support base portion 23 to be turned in the direction of the arrow 100, whereby the tower structure 10 is toppled. However, the present invention is not limited thereto, and the tower structure 10 may be toppled by another operation.
(51)
(52) Then, the support base portion 23 may turned around the tumble axis 23a in a direction in which the longitudinally cut surface 22a of the support base portion 23 approaches the substantially horizontal surface 20a of the lower base 26 by towing the other end of the wire rope 43, to topple the tower structure 10. Note that in a variant example of
(53) A pulling operation using the wire rope 43 and the push-up operation by the push-up means 28 may be used in combination.
(54) Furthermore, in the above-described embodiment, a wind turbine for power generation is shown as an example of the tower structure, but the present invention is not limited thereto. The tower structure can be any tower structure having a base. Examples of the tower structure include, a distillation tower 50 (
(55) In addition, the method of toppling the tower structure of the present invention can be also applied to a plurality of tower structures provided on one base. That is, the tumble axes are formed by cutting one base, so that the plurality of tower structures can be toppled together with the one base by turning the plurality of tower structures around the respective tumble axes.
REFERENCE SIGNS LIST
(56) 10 Tower structure 20 Base 22 Upper base 23 Support base portion 23a Tumble axis 24 Separated base portion 26 Lower base 28 Push-up means 31 Continuous portion