Switched-capacitor converters with capacitor pre-charging
10680512 ยท 2020-06-09
Assignee
Inventors
- Amir Babazadeh (Laguna Hills, CA)
- Jens Ejury (Fremont, CA, US)
- Benjamim Tang (Rancho Palos Verdes, CA)
- Robert Carroll (Andover, MA)
Cpc classification
H02M3/07
ELECTRICITY
H01L27/088
ELECTRICITY
H02M1/32
ELECTRICITY
H02M3/1588
ELECTRICITY
International classification
H02M3/07
ELECTRICITY
H01L23/522
ELECTRICITY
H02M3/158
ELECTRICITY
H03H19/00
ELECTRICITY
H01L27/088
ELECTRICITY
Abstract
A switched-capacitor converter includes a rectifier at the output, a plurality of legs coupled between the input and the rectifier, and a controller. Each leg of the switched-capacitor converter includes a capacitor, and a switch device is connected to each leg. A first group of the legs is coupled to a first branch of the rectifier, and a second group of the legs is coupled to a second branch of the rectifier. The controller alternates switching of the first and second groups of legs after startup, to transfer energy from the input to the output during a first part of each switching cycle via the first group of legs and to ground during a second part of each switching cycle via the second group of legs. The controller or a current limited source provides for pre-charging of at least one of the capacitors during startup.
Claims
1. A switched-capacitor converter, comprising: an input; an output; a rectifier at the output; a plurality of legs coupled between the input and the rectifier, each leg comprising a capacitor, a first group of the legs being coupled to a first branch of the rectifier and a second group of the legs being coupled to a second branch of the rectifier; measurement circuitry configured to sense or estimate the voltage across each of the capacitors during startup; a switch device connected to each leg; and a controller operable to alternate switching of the first and the second groups of legs after startup, to transfer energy from the input to the output during a first part of each switching cycle via the first group of legs and to transfer energy to the output during a second part of each switching cycle via the second group of legs, and to control the switch devices during startup so that a combination of the switch devices which are normally switched in a complementary manner after startup are on at the same time to pre-charge at least one of the capacitors from an initial capacitor voltage of either zero or a value different from a steady-state voltage of the at least one capacitor, and to turn off each switch device during startup when the voltage sensed across the capacitor connected to the switch device reaches a predetermined level, so that the switch devices connected to the capacitors with lower predetermined levels are turned off before the switch devices connected to the capacitors with higher predetermined levels during startup.
2. The switched-capacitor converter of claim 1, further comprising a shunt resistor between the input and the plurality of legs, wherein the controller is operable to bypass the shunt resistor after startup.
3. The switched-capacitor converter of claim 1, wherein the controller is operable to turn on one or more switch devices of the rectifier during startup to prevent overcharging of the output.
4. The switched-capacitor converter of claim 1, wherein the controller is operable to successively turn on the switch devices during startup, beginning with the switch device closest to the input and ending with the switch device furthest from the input.
5. A switched-capacitor converter, comprising: an input; an output; a rectifier at the output; a plurality of legs coupled between the input and the rectifier, each leg comprising a capacitor, a first group of the legs being coupled to a first branch of the rectifier and a second group of the legs being coupled to a second branch of the rectifier; a switch device connected to each leg; a controller operable to alternate switching of the first and the second groups of legs after startup, to transfer energy from the input to the output during a first part of each switching cycle via the first group of legs and to transfer energy to the output during a second part of each switching cycle via the second group of legs; and a current limited source coupled between the input and the plurality of legs and operable to pre-charge, during startup, at least one of the capacitors from an initial capacitor voltage of either zero or a value different from a steady-state voltage of the at least one capacitor, wherein the controller is further operable to disable the current limited source after each capacitor being pre-charged during startup reaches a predetermined voltage level for the capacitor.
6. The switched-capacitor converter of claim 5, wherein the current limited source is operable to pre-charge the capacitor closest to the input during startup and stop charging that capacitor when the voltage across the capacitor reaches a predetermined level.
7. The switched-capacitor converter of claim 5, wherein the current limited source comprises a resistor divider and a diode connecting the input to the capacitor closest to the input.
8. The switched-capacitor converter of claim 5, wherein the current limited source comprises a charge pump connected to the capacitor closest to the input.
9. The switched-capacitor converter of claim 5, wherein the current limited source provides a single tap between the input and the capacitor closest to the input.
10. The switched-capacitor converter of claim 5, wherein the current limited source provides dual taps between the input and the capacitor closest to the input.
11. The switched-capacitor converter of claim 5, wherein the controller is operable to control the switch devices during startup so that a combination of the switch devices which are normally switched in a complementary manner after startup are on at the same time to aid in pre-charging at least one of the capacitors.
12. The switched-capacitor converter of claim 5, wherein the controller is operable to turn on one or more switch devices of the rectifier during startup to prevent overcharging the output.
13. The switched-capacitor converter of claim 5, wherein the controller is operable to successively turn on the switch devices during startup, starting with the switch device closest to the input and ending with the switch device furthest from the input.
14. A switched-capacitor converter, comprising: an input; an output; a rectifier at the output; a plurality of legs coupled between the input and the rectifier, each leg comprising a capacitor, a first group of the legs being coupled to a first branch of the rectifier and a second group of the legs being coupled to a second branch of the rectifier; a switch device connected to each leg; a shunt resistor connected to a gate of at least one of the switch devices; and a controller operable to alternate switching of the first and the second groups of legs after startup, to transfer energy from the input to the output during a first part of each switching cycle via the first group of legs and to transfer energy to the output during a second part of each switching cycle via the second group of legs, wherein the controller is operable to adjust a gate-to-source voltage applied to the at least one switch device during a startup interval in which at least one of the capacitors is pre-charged from an initial capacitor voltage of either zero or a value different from a steady-state voltage of the capacitor, to adjust an on-state resistance of the at least one switch device, and is further operable to bypass the shunt resistor after the startup interval.
15. A switched-capacitor converter, comprising: an input; an output; a rectifier at the output; a plurality of legs coupled between the input and the rectifier, each leg comprising a capacitor, a first group of the legs being coupled to a first branch of the rectifier and a second group of the legs being coupled to a second branch of the rectifier; a switch device connected to each leg; and a controller operable to: alternate switching of the first and the second groups of legs after startup, to transfer energy from the input to the output during a first part of each switching cycle via the first group of legs and to transfer energy to the output during a second part of each switching cycle via the second group of legs, and control the switch devices during startup so that a combination of the switch devices that are normally switched in a complementary manner after startup are on at the same time to pre-charge at least one of the capacitors from an initial capacitor voltage of either zero or a value different from a steady-state voltage of the at least one capacitor, and to turn off each switch device during startup when a timer value assigned to the switch device expires, wherein the timer values correspond to respective pre-charge voltages of the capacitors connected to the switch devices, and wherein at least some of the pre-charge voltages differ from each other.
Description
BRIEF DESCRIPTION OF THE FIGURES
(1) The elements of the drawings are not necessarily to scale relative to each other. Like reference numerals designate corresponding similar parts. The features of the various illustrated embodiments can be combined unless they exclude each other. Embodiments are depicted in the drawings and are detailed in the description which follows.
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
DETAILED DESCRIPTION
(10) The embodiments described herein provide for pre-charging of one or more capacitors of a switched-capacitor converter during startup, such that the transition from startup to regular (post startup) operation occurs with lower stress on the switch devices and other components of the switched-capacitor converter in the shortest possible time.
(11)
(12) Each leg of the switched-capacitor converter 100 includes a respective capacitor Cy. Some of the legs, also referred to herein as resonant legs, include an inductor Lx connected to the corresponding capacitor Cy. A switch device Qx is connected to each leg, for controlling charging of the capacitors Qx. Six legs in total are shown in
(13) The (first) group of resonant legs which includes resonant capacitors C1, C3 and C5 is coupled to a first branch 112 of the rectifier 108, and the (second) group of non-resonant legs which includes flying capacitors C2, C4 and C6 is coupled to a second branch 114 of the rectifier 108. The rectifier is a switched capacitor rectifier in that for each group of legs, the AC currents are in opposite phase during normal (post startup) operation. While the first group is charging during normal operation, the other group is discharging. The rectifier switches alternatively connect each leg to the output when the current is being discharged, and to ground when the current is charging. In one embodiment, each branch 112, 114 of the rectifier 108 includes two switch devices Qm/Qn coupled as a half bridge. Other rectifier configurations are possible.
(14) With the exemplary 6:1 topology shown in
V.sub.C5=1*Vout
V.sub.C4=2*Vout
V.sub.C3=3*Vout
V.sub.C2=4*Vout
V.sub.C1=5*Vout
The conversion ratio for the exemplary system shown in
(15) The controller 110 of the switched-capacitor converter 100 alternates switching of the first (resonant) and the second (non-resonant) groups of legs to transfer energy from the input 102 to the output 104 during post startup operation. For example, switch devices Q1, Q3, Q5, Q7 and Q10 can be switched via a first PWM (pulse width modulation) signal with approximately 50% duty cycle and switch devices Q2, Q4, Q6, Q8 and Q9 can be switched via the complementary PWM signal with dead time between the PWM signals. The controller 110 can implement other duty cycle combinations post startup.
(16) During startup, the capacitor voltages V.sub.C1, V.sub.C2, etc. and the inductor currents i.sub.L1, i.sub.L2, etc, of the switched-capacitor converter 100 are either zero or different from the respective steady-state values. The controller 110 ensures one or more of the capacitors C1 through C6 is pre-charged during startup, by controlling the switch devices so that a combination of the switch devices which are normally switched in a complimentary manner after startup are on at the same time to pre-charge at least one of the capacitors during startup. The on-time of the switch devices during startup can be limited (reduced) to just enough time to charge the corresponding capacitors, thus limiting the inrush current during startup.
(17) In the exemplary switched-capacitor converter topology illustrated in
(18) In one embodiment, the switched-capacitor converter 100 also includes measurement circuitry 116 such as DGR sense circuitry, on-state resistance (R.sub.DSon) measurement circuitry, comparator circuitry, etc. for sensing or estimating the voltage across each of the capacitors during startup. The controller 110 turns off each switch device during startup when the voltage sensed across the capacitor connected to that switch device reaches a predetermined level for that capacitor, so that the switch devices connected to the capacitors with lower predetermined levels are turned off during startup before the switch devices connected to the capacitors with higher predetermined levels. In the exemplary switched-capacitor converter topology illustrated in
(19) In a second approach, the controller 110 turns on switch devices Q1 through Q3, Q8 and Q10 to pre-charge capacitors C1, C2 and C3 which are charged at a higher level than the other capacitors. In a third approach, the controller 110 implements the PWM control of switch device Q1 at a higher frequency than the other switch devices to charge resonant capacitor C1 via inductor L1 and switch device Q8, and subsequently charge flying capacitor C2 by switch device Q10 via switch device Q8 and inductor L1. The controller 110 can repeat the sequence for other downstream capacitor stages, and re-charge resonant capacitor C1 as needed.
(20) Similar to the third approach, a fourth approach involves the controller 110 setting switch devices Q2 through Q5 in the on-state to charge all capacitors simultaneously. With the fourth approach, the controller 110 can turn on switch devices Q1 and Q8 for some time and charge resonant capacitor C1 and then use other switch devices to transfer energy from capacitor C1 to the other capacitors. Similar to the third approach, a fifth approach involves the controller 110 setting switch devices Q2 through Q5 in the on-state and switch device Q10 in the off state to charge resonant capacitors C1, C3 and C5 simultaneously. Subsequent turning off of switch device Q1 and turning on of switch devices Q2, Q4 and Q10 charges flying capacitors C2 and C4 resonantly via the inductors. The controller 110 can repeat the sequence until desired pre-charge capacitor voltage levels have been reached.
(21) In another embodiment, the controller 110 turns off each switch device during startup when a timer value assigned to that switch device expires. The timer values correspond to respective pre-charge voltages of the capacitors connected to the switch devices.
(22)
(23)
(24)
(25) In one embodiment, the current limited source 402 pre-charges at least the capacitor C1 closest to the input Vin during startup and stops charging capacitor C1 when the voltage across capacitor C1 reaches a predetermined level. Any of the capacitor pre-charging embodiments described above in connection with
(26)
(27)
(28)
(29) The current limited source 402 can provide a single tap between the input Vin and the capacitor C1 closest to the input. In this configuration, the pre-charging sequence includes the controller 110 turning on switch devices Q8 and Q10 to prevent overcharging of the output Vout, which is not likely to happen since preferably Cout>>C1. The controller 110 turns on switch device Q2 through Q5 to charge capacitors C2 through C5, and then successively turns off switch devices Q5 through Q2 to limit the voltage on capacitors C5 through C2. The time constant is set mostly by flying capacitors C2 and C4, so the initial voltage on resonant capacitor C1 should not matter and the controller 110 can set the on-time for switch device Q1 to ensure proper pre-charging. Once the capacitors have been pre-charged, the controller 110 can exit startup and enter normal (post startup) operation.
(30) In another embodiment, the current limited source 402 has dual taps between the input Vin and the capacitor C1 closest to the input. In this configuration, the pre-charging sequence includes the controller 110 turning on switch devices Q8 and Q10 to prevent overcharging of the output Vout. Resonant capacitors C1 and C3 are pre-charged through body diodes of switch devices Q2 and Q4, to values slightly below the voltages across flying capacitors C2 and C4, respectively. The controller 110 turns off switch device Q10, and then turns on switch devices Q2 and Q4 to pre-charge resonant C1 and C3 to about the same level as flying capacitors C2 and C4, respectively. This pre-charging is damped by the current limited source 402, so the timing need not be precisely determined. If needed, the controller 110 can pulse switch devices Q2 and Q4 to limit the currents which pre-charge flying capacitors C2 and C4, respectively.
(31)
(32)
(33)
(34)
(35) Terms such as first, second, and the like, are used to describe various elements, regions, sections, etc. and are also not intended to be limiting. Like terms refer to like elements throughout the description.
(36) As used herein, the terms having, containing, including, comprising and the like are open ended terms that indicate the presence of stated elements or features, but do not preclude additional elements or features. The articles a, an and the are intended to include the plural as well as the singular, unless the context clearly indicates otherwise.
(37) It is to be understood that the features of the various embodiments described herein may be combined with each other, unless specifically noted otherwise.
(38) Although specific embodiments have been illustrated and described herein, it will be appreciated by those of ordinary skill in the art that a variety of alternate and/or equivalent implementations may be substituted for the specific embodiments shown and described without departing from the scope of the present invention. This application is intended to cover any adaptations or variations of the specific embodiments discussed herein. Therefore, it is intended that this invention be limited only by the claims and the equivalents thereof.