Scheduling in license assisted access
11523424 · 2022-12-06
Assignee
Inventors
- Daniel Larsson (Lund, SE)
- Jung-Fu Cheng (Fremont, CA)
- Sorour Falahati (Stockholm, SE)
- Havish Koorapaty (Saratoga, CA)
- Amitav Mukherjee (Fremont, CA, US)
- Yu Yang (Solna, SE)
Cpc classification
H04W72/23
ELECTRICITY
H04W74/0808
ELECTRICITY
International classification
Abstract
In one aspect, a wireless device receives a scheduling grant and a grant confirmation signal indicating that a network node has performed a CCA on a carrier and is releasing the carrier for the wireless device. An uplink message is transmitted on the carrier without performing a CCA on the carrier. In another aspect, a wireless device is connected to a first cell and a second cell configured on a carrier requiring an LBT protocol. The wireless device receives configuration messages indicating that downlink transmissions on the second cell are to be scheduled. This can mean self-scheduling for downlink on the second cell and cross-carrier scheduling for uplink on the first cell. The wireless device receives a scheduling grant in the first cell and performs a CCA in the second cell. The wireless device then transmits an uplink message responsive to success of the CCA.
Claims
1. A method performed at a wireless device, the wireless device being connected to a first cell and a second cell operated by a network node, wherein the first cell is configured on a carrier where a listen-before-talk (LBT) protocol for transmission is used, the method comprising: receiving, from the network node, a scheduling signal scheduling an uplink transmission; receiving, in the second cell, a confirmation signal from the network node, the confirmation signal indicating that the network node has performed a clear channel assessment (CCA) on the carrier and is releasing the carrier for the wireless device; and responsive to receiving the scheduling signal and the confirmation signal, transmitting the uplink transmission on the carrier without performing a CCA on the carrier.
2. The method of claim 1, wherein the confirmation signal is received after the scheduling signal.
3. The method of claim 1, wherein the scheduling signal is a scheduling grant, and wherein the confirmation signal is a grant confirmation signal.
4. The method of claim 3, wherein the confirmation signal is received after the scheduling signal.
5. A method performed at a network node, the network node serving a first cell and a second cell, wherein the first cell is configured on a carrier where a listen-before-talk (LBT) protocol for transmission is used, the method comprising: transmitting, to a wireless device, a scheduling signal scheduling an uplink transmission; performing a clear channel assessment (CCA) for the carrier, prior to a time for the scheduled uplink transmission; responsive to success of the CCA, transmitting, in the second cell, a confirmation signal to the wireless device and releasing the carrier for the scheduled uplink transmission; and receiving the uplink transmission on the carrier after transmitting the confirmation signal.
6. The method of claim 5, wherein the confirmation signal is transmitted after the scheduling signal.
7. The method of claim 5, wherein the scheduling signal is a scheduling grant, and wherein the confirmation signal is a grant confirmation signal.
8. The method of claim 7, wherein the confirmation signal is transmitted after the scheduling signal.
9. The method of claim 7, wherein transmitting the scheduling signal is preceded by performing a CCA.
10. The method of claim 5, wherein transmitting the scheduling signal is preceded by performing a CCA.
11. A wireless device configurable to connect to a first cell and a second cell operated by a network node, wherein the first cell is configured on a carrier where a listen-before-talk (LBT) protocol for transmission is used, wherein the wireless device comprises circuitry configured to cause the wireless device to: receive, from the network node, a scheduling signal scheduling an uplink transmission; receive, in the second cell, a confirmation signal from the network node, the confirmation signal indicating that the network node has performed a clear channel assessment (CCA) on the carrier and is releasing the carrier for the wireless device; and responsive to receiving the scheduling signal and the confirmation signal, transmit the uplink transmission on the carrier without performing a CCA on the carrier.
12. The wireless device of claim 11, wherein the circuitry is configured to cause the wireless device to receive the confirmation signal after the scheduling signal.
13. The wireless device of claim 11, wherein the scheduling signal is a scheduling grant, and wherein the confirmation signal is a grant confirmation signal.
14. The wireless device of claim 13, wherein the circuitry is configured to cause the wireless device to receive the confirmation signal after the scheduling signal.
15. A network node configurable to serve a first cell and a second cell, wherein the first cell is configured on a carrier where a listen-before-talk (LBT) protocol for transmission is used, the network node comprising circuitry configured to cause the network node to: transmit, to a wireless device, a scheduling signal scheduling an uplink transmission; perform a clear channel assessment (CCA) for the carrier, prior to a time for the scheduled uplink transmission; responsive to success of the CCA, transmit, in the second cell, a confirmation signal to the wireless device and release the carrier for the scheduled uplink transmission; and receive the uplink transmission on the carrier after transmitting the confirmation signal.
16. The network node of claim 15, wherein the circuitry is configured to cause the network node to transmit the confirmation signal after the scheduling signal.
17. The network node of claim 15, wherein the scheduling signal is a scheduling grant, and wherein the confirmation signal is a grant confirmation signal.
18. The network node of claim 17, wherein the circuitry is configured to cause the network node to transmit the confirmation signal after the scheduling signal.
19. The network node of claim 17, wherein the circuitry is configured to cause the network node to perform a CCA before transmitting the scheduling signal.
20. The network node of claim 15, wherein the circuitry is configured to cause the network node to perform a CCA before transmitting the scheduling signal.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
(13)
(14)
(15)
(16)
(17)
(18)
(19)
(20)
(21)
(22)
(23)
(24)
(25)
(26)
(27)
(28)
(29)
(30)
(31)
(32)
(33)
(34)
(35)
DETAILED DESCRIPTION
(36) Although this disclosure refers to “licensed” and “unlicensed” spectrum, it should be noted that this is only an illustrative scenario and should not be construed as limiting. For example, what is referred to in this disclosure as “unlicensed” spectrum could be licensed but still made available for use under certain conditions (for instance, during certain time periods, or when no users that have priority access to the spectrum are present in the cell). This is sometimes referred to as “License Shared Access” or LSA. Moreover, unless otherwise specified herein, it is not essential to the solution whether a certain spectrum is actually “licensed” or not. The solutions may be applicable in general in scenarios where spectrum in a cell is shared with other radio technologies, especially when those technologies employ different protocols for gaining channel access, and/or different protocols for scheduling.
(37) Further, in the context of this disclosure, CCA encompasses any technique for detecting whether the channel is not being used, before a transmission is performed. The assessment may be limited to specific resources, but it may also require CCA to be performed over a wider bandwidth, for example the full bandwidth of a cell. Thus, an LBT protocol, as discussed herein, involves, on a general level, performing a CCA, and then transmitting only when the CCA is successful, that is, transmitting when the channel is declared as not busy (or, equivalently, declared as idle). The CCA may in some cases be performed on behalf of another device. For example, in a “reverse direction grant protocol”, a network node (e.g., a base station or Wi-Fi access point) may perform CCA to secure the channel for a subsequent uplink transmission by a wireless device.
(38) In a first embodiment, scheduling methods for DL transmission and UL transmission can be configured separately via higher layer signaling. A non-limiting example of said higher layer signaling is the RRC layer signaling in LTE. For example, DL transmission is configured to follow self-scheduling and UL transmission is configured to follow cross-carrier scheduling. For the LAA use case, if the UL transmission is cross-scheduled from a cell not following LBT protocol (for example, the PCell in the licensed band), the UL transmission attempts will be subject to only one LBT procedure instead of two LBT procedures. For example, in the self-scheduling case where the eNB has to perform LBT before sending he scheduling message, followed by the UE performing an LBT before sending the scheduled data. This embodiment will allow the LAA UL transmission to perform well even in congested scenarios.
(39) An example embodiment in a wireless device will now be described with reference to the flowchart in
(40) In some variants, the wireless device is configured with carrier aggregation, and the first cell is the configured PCell, and the second cell is a configured SCell. The second cell may be configured on carrier that is shared with other radio technologies such as Wi-Fi. The carrier may use unlicensed spectrum.
(41) An example embodiment in a network node, e.g., an LTE base station, will now be described with reference to the flowchart in
(42) In a second embodiment, an assisting signal is transmitted in the DL to assist the operation of UL reverse direction grant protocol. This embodiment is to address the situation where the allowed channel occupancy time is not long enough to enable effective operation of the UL reverse direction grant protocol. In this example, the UE detects the reverse direction grant assistance signal before transmitting the UL without LBT.
(43) Thus, the “reverse direction grant protocol” implies that the network node (e.g., a base station) performs CCA to secure channel access for the UE, so that the UE does not need to perform CCA before transmitting in the uplink. In some embodiments, the reverse direction grant assistance signal is a PDCCH or an EPDCCH. In other embodiments, the reverse direction grant assistance signal is a sequence of symbols transmitted in specific time-frequency locations known to the UE (such as the CRS). In some examples, the reverse direction grant assistance signal is a dedicated physical channel specifically defined for carrying said information. An example of such a dedicated physical channel is the physical hybrid-ARQ indicator channel (PHICH) in LTE.
(44) In some embodiments, the reverse direction grant assistance signal conveys the number of subframes for which the channel access has been gained. Such information can be provided by signaling the number of subframes after the subframe in which the grant assistance signal occurs for which channel access is secured.
(45) In an example, a UE is provided with location information of the reverse direction grant assistance signal within the frame structure. In an example implementation, this information is the number of subframes relative to the UL scheduling command. In the example illustration in
(46) In a second example, the location of the reverse direction grant assistance signal is known to UE. In a first example implementation, the location information is fixed in the standard specification. In a second example implementation, the location information is configured via higher layer signaling and becomes fixed for the serving cell until a reconfiguration.
(47) In a third example, the reverse direction grant assistance signal, sent using any of the above methods, carries information for multiple UL SCells on which the UE can transmit without LBT.
(48) In a fourth example, the reverse direction grant assistance signal is sent to the UE on a licensed PCell or SCell, along with associated CIF information to indicate the corresponding UL SCell. The “reverse direction grant assistance signal” is, throughout this disclosure, alternatively referred to as a “grant confirmation signal.”
(49) In another example, a network node serves a cell, wherein the cell is configured on a carrier where an LBT protocol for transmission is required to be used. At least one wireless device is connected to the cell. This method includes performing a CCA, and transmitting a scheduling grant to a wireless device when the CCA is successful. The network node then performs a second CCA and, when the second CCA is successful, it transmits a grant confirmation signal to the wireless device.
(50) The second CCA may be performed a certain number of subframes (e.g., 3 subframes) after transmitting the scheduling grant. Thereby, channel access is secured for additional subframes, which is advantageous if the cell is configured on spectrum where the channel occupancy time is limited (for example, limited to 4 subframes). The grant confirmation signal may, in some variants, be transmitted shortly after the second CCA has succeeded, for example, in the following subframe.
(51) The wireless device waits until it receives the grant confirmation signal before it actually performs a scheduled uplink transmission. Hence, the network node may receive an uplink transmission subsequent to transmitting the grant confirmation signal.
(52) Advantageously, the network node may send scheduling grants to several wireless devices, and the second CCA may then be used to secure channel access for all these scheduled devices. Thereby, it is not necessary for each wireless device to perform a separate CCA before an uplink transmission. If each wireless device were to perform a separate CCA, the devices might interfere with each other, because the CCAs are likely to complete at slightly different times. Thus, if a first device has performed a successful CCA and started to transmit, the transmission from the first device might prevent a second device from obtaining channel access.
(53)
(54) The method 1400 also includes, responsive to success of the first CCA, transmitting a grant confirmation signal to the wireless device and releasing the carrier for the scheduled uplink transmission (block 1406). The grant confirmation signal may comprise an indication of the number of subframes for which channel access has been secured.
(55) In some cases, scheduling grants may be transmitted to each of more than one wireless device responsive to the first CCA being successful. In some cases, the method 1400 includes scheduling all of the more than one wireless devices in each of every subframe for which channel access has been secured by performing the first CCA and releasing the carrier. In other cases, the method 1400 includes scheduling at least one wireless device for fewer than all of the subframes in a series of subframes for which channel access has been secured by performing the first CCA and releasing the carrier, where the grant confirmation signal transmitted to the at least one wireless device indicates the number of subframes for which channel access has been secured.
(56) The method 1400 may include receiving an uplink transmission from the wireless device after transmitting the grant confirmation signal. The uplink transmission may be received in the subframe immediately following a subframe in which the grant confirmation signal was transmitted.
(57) In another example, a wireless device is connected to a cell, wherein the cell is configured on a carrier where an LBT protocol for transmission is required to be used. The method comprises receiving a scheduling grant, and subsequently receiving a grant confirmation signal. Responsive to receiving the grant confirmation signal, the wireless device transmits an uplink message. The grant confirmation signal indicates to the wireless device that channel access has been secured. Thus, the wireless device does not need to perform CCA before transmitting the uplink message. As mentioned above, the network node has already performed the CCA before transmitting the grant confirmation signal and thereby secured channel access for the device (and possibly for other devices as well).
(58)
(59) In a third embodiment, when the UL transmission burst consists of multiple subframes after the channel is accessed and before the channel is released, all the UEs that are scheduled for UL transmissions in one burst are scheduled so that every UE is scheduled in each of the subframes. This method of scheduling can be combined with the reverse grant assistance signal in the previous embodiment where the signal is provided a certain number of subframes after the scheduling command is received by the UEs on the downlink as shown in
(60) In some embodiments, the UL transmissions for multiple UEs may be scheduled so that not all UEs transmit in all subframes in the transmission burst. In this case, for example, a particular UE may not be scheduled in the very first UL subframe of the transmitted burst. This method of scheduling UEs is then coupled with the embodiment where the reverse direction grant assistance signal indicates the number of subframes for which the channel access has been secured. Using this information, along with the scheduling information, allows the UE to determine whether it can transmit in a particular scheduled subframe without performing any LBT operation.
(61) As for a fourth embodiment, cross-carrier scheduling based on EPDCCH is considered. For EPDCCH, it may be possible to avoid the case where EPDCCH is needed to be provided before or at the same time as the corresponding PDSCH. This is by configuring the EPDCCH to start later in the subframe than the PDSCH would start on the LAA SCell. However, the eNB would need to have completed the processing of the time domain signal to be transmitted soon within 1 OFDM symbol or similar timing relations before the EPDCCH is actually transmitted. However, it may be possible that the eNB creates two different time domains samples, i.e. one with the EPDCCH included and one excluding the EPDCCH. Then eNB can then choose the applicable OFDM symbol(s), the ones including EPDCCH or the ones excluding EPDCCH. Based on whether or not the PDSCH on the LAA SCell is transmitted. This problem occurs as soon as the eNB has to perform LBT for the LAA SCell.
(62) Although the described solutions may be implemented in any appropriate type of telecommunication system supporting any suitable communication standards and using any suitable components, particular embodiments of the described solutions may be implemented in an LTE network using carrier aggregation, such as that illustrated in
(63) As shown in
(64) As shown in
(65) According to some embodiments, the wireless device 1700 is configured to be connectable to a first cell and a second cell, where the second cell is configured on a carrier where an LBT protocol for transmission is required to be used. The processing circuitry is configured to receive one or more configuration messages, via the radio circuitry 1710, indicating that downlink transmissions on the second cell are to be scheduled. Downlink transmissions may be scheduled using self-scheduling on the second cell, and that uplink transmissions on the second cell are to be scheduled using cross-carrier scheduling on the first cell. The processing circuitry is also configured to receive a scheduling grant in the first cell and, in a subframe occurring a predetermined number of subframes after receiving the scheduling grant, perform a CCA in the second cell. The processing circuitry is configured to use the radio circuitry 1710 to transmit an uplink message responsive to success of the CCA.
(66) According to other embodiments, the wireless device 1700 is configured to be connected to a cell operated by a network node (e.g., base station) and configured to be connectable to a cell configured on a carrier where an LBT protocol for transmission is required to be used. The processing circuitry is configured to receive, via the radio circuitry 1710, a scheduling grant from the network node and receive, from the network node, a grant confirmation signal indicating that the network node has performed a CCA on the carrier and is releasing the carrier for the wireless device 1700. The processing circuitry is also configured to, responsive to receiving the scheduling grant and the grant confirmation signal, transmit an uplink message on the carrier without performing a CCA on the carrier.
(67) As shown in
(68) According to some embodiments, the network node 1800 is configured to serve a first cell and a second cell, where the second cell is configured on a carrier where an LBT protocol for transmission is required to be used. The processing circuitry is configured to transmit, to a wireless device 1700 via the radio circuitry 1810, one or more configuration messages indicating that downlink transmissions on the second cell are to be scheduled. Downlink transmissions may be scheduled using self-scheduling on the second cell, and that uplink transmissions on the second cell are to be scheduled using cross-carrier scheduling on the first cell. The processing circuitry is also configured to transmit a scheduling grant to the wireless device 1700 in the first cell and receive an uplink message from the wireless device 1700 in the second cell, according to the transmitted scheduling grant.
(69) According to other embodiments, the processing circuitry of the network node 1800 is configured to transmit a scheduling grant to a wireless device for the carrier, via the radio circuitry 1810, for a scheduled uplink transmission and perform a first CCA for the carrier, prior to a time for the scheduled uplink transmission. The processing circuitry is also configured to, responsive to success of the first CCA, transmit a grant confirmation signal to the wireless device and release the carrier for the scheduled uplink transmission.
(70)
(71)
(72)
(73)
(74) Example Solutions
(75) According to some embodiments, certain aspects could be implemented within the framework of a specific communication standard. Specifically, changes could be made to one or more of the 3GPP specifications 3GPP TS 36.211 V11.4.0, 36.213 V11.4.0 and 36.331 V11.5.0, which methods can be used to implement certain embodiments of the described solutions. The following examples are merely intended to illustrate how a particular embodiment could be implemented in a particular standard. However, the example solutions could also be implemented in other suitable manners, both in the above mentioned specifications and in other specifications or standards.
(76) The LTE design supports, in general, two different scheduling approaches: cross-carrier scheduling and self-scheduling. The supported set of scheduling design needs some considerations for LAA SCell due to the LBT requirements on an LAA SCell, which differs from the previous LTE designs. For example, in one embodiment, self-scheduling is used for DL and cross-carrier scheduling is used on UL. In another embodiment, cross-carrier scheduling is used on DL and self-scheduling is used on UL. An applicable design of self-scheduling will be described before an applicable design for cross-carrier scheduling.
(77) For the case of a DL-only LAA SCell that operates self-scheduling, the assumption is that the DCI message is provided by EPDCCH. If the UE finds an applicable EPDCCH, it would know that it has been assigned a PDSCH within that subframe. On the eNB side, this type of operation is rather straightforward, as either the eNB succeeds with its LBT operations or it does not. If the eNB succeeds with the LBT operation, the eNB transmits both EPDCCH and PDSCH. For subframes that do not require a new LBT procedure, the eNB simply transmits EPDCCH and PDSCH. The requirement to support this operation is that the eNB configures an EPDCCH that always starts, for example, three OFDM symbols into the subframe. Moreover, it should be allowed for the PDSCH to start from the first OFDM symbol or with the same offset as the EPDCCH.
(78) As shown in
(79) A similar approach can be applied in LAA. The scheduling delay of 4 ms in LAA may be used, or some other optimization for self-scheduling design for UL based on the impact on the LAA UL performance and/or assuming the similar applicable features for Wi-Fi.
(80) In another embodiment illustrated by
(81) Regarding cross-carrier scheduling, it may be assumed that the LAA SCell is scheduled from a licensed carrier. An LAA SCell may also be scheduled from another LAA SCell. In the case of DL-only LAA SCell, there are basically two different operational modes. The first is assuming that the PDCCH is used to schedule the LAA SCell and the second is that EPDCCH is used to schedule the LAA SCell. Assuming that the PDCCH is used, there will be a potential issue in the first subframe of a TxOP. The reason is that the eNB would need to transmit the PDCCH either before or at the same time as the PDSCH starts to be transmitted towards the UE. Since LBT needs to be done on LAA SCell in the beginning of the first subframe of TxOP, it is uncertain whether PDSCH will be transmitted on LAA SCell when PDCCH is transmitted on PCell as shown in
(82) An example solution is that the UE detects the presence of the initial signal, but this may require that the initial signal is transmitted long enough to allow a reliable detection at the UE side. Another alternative solution is that some signal is embedded in the beginning of the first PDSCH. The two last approaches have an issue with the scenario where the UE's ON duration of the discontinuous reception (DRX) procedure is not aligned with TxOP duration, and hence these two approaches are not preferred from this perspective. Blind detection of the PDSCH may be performed assuming a very low error rate to avoid corrupting the soft buffer. A DL may be cross-carrier scheduled from PDCCH on a carrier operating on a carrier operated in licensed spectrum.
(83) Cross-carrier scheduling may be based on EPDCCH. For EPDCCH, it may be possible to avoid the case that EPDCCH needs to be provided before or at the same time as the corresponding PDSCH. This is done by configuring the EPDCCH to start later in the subframe than the PDSCH would start on the LAA SCell.
(84) Another embodiment is illustrated by
(85) Cross-carrier scheduling from a carrier in licensed spectrum is considered for both DL and UL scheduling. Compared to DL based cross-carrier scheduling, this is more straightforward, assuming that the amount of carriers in licensed spectrum are rather balanced compared to the amount of carriers used in the unlicensed band. In addition, the scheduling cell is FDD. It would, in this instance, be possible to avoid the case that both the eNB and UE would be required to do LBT, by simply relying on that the UE performs LBT before transmitting.
(86)
(87) In sum, various embodiments may include the following: 1) for DL-only, LAA SCell self-scheduling is based on EPDCCH; 2) for UL+DL LAA, DL scheduling is based on self-scheduling with EPDCCH; 3) for UL+DL LAA, UL scheduling is based on self-scheduling with EPDCCH; 4) self-scheduling is based on EPDCCH for both UL and DL for any number of aggregated unlicensed carriers; and 5) cross-carrier scheduling for UL from (E)PDCCH is supported together with self-scheduling for DL.
(88) Additional LAA Embodiments
(89) In some embodiments, the following functionalities may be included, in addition to the current LAA TR on the unlicensed band: radio resource management (RRM) measurement including cell identification; automatic gain control (AGC) setting; coarse synchronization; fine frequency/time estimation for at least demodulation; and channel state information (CSI) measurement, including channel and interference. Rel-12 DRS can be the starting point for at least RRM measurement including cell identification.
(90) PHY-layer solutions will be described for how to perform measurement and reporting of CSI for an LAA SCell, according to some embodiments. From an LTE carrier aggregation perspective, all serving cells are categorized as intra-frequency cells. In LAA, the unlicensed carrier can dynamically be changed according to the channel selection process in the eNB. Also, the CRS on which the reference signal received power (RSRP) and reference signal received quality (RSRQ) are based on are sparse and further subjected to LBT. This will have an impact on the UE measurement performance.
(91) In Rel-12, RSRP and RSRQ measurements are supported for the discovery signal, while there is no support of reference signal time difference (RSTD) and Rx-Tx time difference. The same measurements may be supported for measurements in Rel-13 as for Rel-12. Support of RSTD and Rx-Tx time difference can be added later if location based services are needed for LAA.
(92) In one embodiment, for LAA, support for RSTD and Rx-Tx time diff is not required. When a SCell is active, from a measurements point of view, it is subject to performance requirements as an intra-frequency cell with discovery signal. If a discovery signal is subject to LBT, the detection of a new LAA cell can potentially take longer. The detection period of a 20 MHz channel is 15 DMTC periods. It may be noted that the identification of an LAA intra frequency cell can be potentially longer due to LBT of the discovery signal.
(93) The measurement performance between legacy LTE cells vs legacy LTE cells with discovery signal vs LAA cells with LBT will vary. It is likely that since the legacy LTE cells will be detected earlier and appears to be more stable, they may be better candidates for SCell addition. Since the decision of selecting an LAA cell is service based, algorithms for comparing licensed vs unlicensed carrier operation may be considered.
(94) RSRP and RSRQ measurements in the UE require positive identification and will fail when LBT fails. Received signal strength indicator (RSSI) measurements on the other hand can always be measured by the UE. RSSI measurements during an LBT failure on occasion can also be useful to the eNB. When tracked by the UE over a longer period of time, the eNB can get an idea of the other users on the carrier by using only the measurements during LBT failures. Such information can be used for the longer term channel selection. In order to distinguish between RSSI from LBT failure occasions and RSSI from LBT success occasions, two approaches are possible. The first approach would be that the UE detects LBT success/failure and tags the RSSI report with the corresponding detection result. In the second approach, the UE simply reports RSSI together with a potential time-stamp so that the eNB can keep track of and filter the reports based on its LBT history.
(95) In an embodiment, RSSI measurements are reported to the eNB regardless of whether LBT detection showed success or failure. The UE could either tag each report with the result from LBT detection or tag each report with a time stamp. With the latter option the eNB can keep track of the reports and filter them based on its LBT history. The discovery signal may have gaps that give the opportunity for Wi-Fi to use the channel.
(96) The following is a discussion on the types of information that can be conveyed in order to improve the system performance. Network ID: Since multiple operators are sharing the same channel, the physical cell identity is not sufficient identify the correct cell. The network identity may be transmitted on the discovery channel. The UE may ensure that this is decoded prior to performing any quality measurements.
(97) In another embodiment, the Network-ID is included in the discovery signal to enable the UE to correctly identify its own cell. As for operating Carriers, an eNB may operate on several LAA carriers simultaneously. If the eNB can send the LAA carriers on which it is operating, other operator eNBs can use this information as input to its channel selection. That is, if possible avoiding these particular LAA carriers. As for carrier Usage, similarly, channel usage metrics for the operating carriers may also be sent over the discovery signal to further aid another operator's eNBs for channel selection. This information would be even more useful when most LAA carriers are used and busy and more detailed information of each channel is required. The point of broadcasting control information over the discovery signal is that this cannot be done (for the above mentioned parameters) via the PCell. First, the dynamic changes in the parameters would cause an increase in the X2 signalling load. Second, the PCell would have to be co-located.
(98) In another embodiment, the operating carrier and carrier usage metrics are used in the discovery signal. Another parameter to consider broadcasting over the discovery signal is the neighbor cell list. This may be a situation where the macro cell is containing many small LAA cells.
(99) In sum, RRM measurements for an LAA SCell were discussed and based on the discussion in the contribution, the following may be considered: since positioning features are not envisioned in this time frame, support for RSTD and Rx-Tx time diff is not required; RSSI measurements are reported to the eNB; take action when a cell detection fails at the UE; include the Network-ID in the discovery signal to enable the UE to correctly identify its own cell; and consider including the operating carrier and carrier usage metrics in the discovery signal.
(100) Further LAA Embodiments
(101) Handling CSI measurements on LAA SCells needs to be handled with some care. The CSI measurements may consist of two different measurement resources: CSI-RS and CSI-IM. The reason is that CSI measurement opportunities at the UE will be much more difficult to obtain when operating an LAA SCell because the eNB needs to perform LBT before transmitting CSI-RS. One embodiments includes extending the CSI-RS design so that the UE is configured to expect CSI-RS in a subframe or a set of subframes with a configured periodicity and offset. The eNB then performs LBT on CSI-RS and the UE would need to blindly detect the presence of the CSI-RS. It is notable that it is very difficult to get a good blind detection of a single CSI-RS resource. The risk of falsely detecting the presence of CSI-RS is large, i.e., the situation where the UE believes that the eNB has transmitted the CSI-RS but the eNB has not. It is noted that the presence of a specific CSI-RS needs to be indicated to the UE.
(102) Before further discussion on the different approaches on CSI-RS transmissions, the value of periodic and aperiodic CSI reports for LAA SCells will be described. It is assumed that the interference conditions may be very varying on an LAA SCell over time. At the same time, the scenario that is considered is a very low mobility scenario. The underlying spatial properties and channel quality (if the interference conditions are excluded) is hence rather static over time. At the same time, it is assumed that the LAA SCell will mainly be used to expand the data rate, i.e., if the eNB has large amount of DL data to schedule to UE the eNB will utilise LAA SCells. Correspondingly, the LAA SCell will be used for significant time before the eNB has emptied its transmission buffer. Due to this, it is unlikely that the eNB will activate LAA SCells without scheduling data on them for a long period of time. Periodic CSI reports are mainly used to get a good starting point for the link adaptation and scheduling and when data is being continuously scheduled the resolution of the periodic CSI report is not good enough. This due to that the level of resolution in the periodic CSI feedback is not good enough to provide reliable scheduling of high date rate. In addition, the reliable transmission of reference signals for CSI in a periodic manner on the unlicensed band will not be possible due to a potential lack of access to the channel. Due to all of the above reasons the most practical approach would be to rely only on aperiodic CSI reports for LAA SCell.
(103) Accordingly, in some embodiments, LAA SCells do not support periodic CSI reports, but do support aperiodic CSI reports. Going back to the need for the CSI-RS presence to be indicated to the UE, this needs to be done with minimal delay as the eNB will decide in a very short time frame whether or not to transmit a specific set of subframe(s). It is possible to introduce a specific indicator that indicates the presence of the CSI-RS, as for example, a specific DCI message that is scrambled with specific radio network temporary identifier (RNTI) and indicates the presence of a CSI reference signal (CSI-RS) on a specific carrier or group of carriers. This would require that the message is sent on a search space that is common for many UEs, e.g. on Pcell. This together with the DCI message could indicate which SCell the message applies to and potentially when in time.
(104) In other embodiments, the presence of the CSI-RS is indicated to the UE receiving the UL Grant which indicates that an aperiodic CSI message should be sent for the specific cell. In a case when the UL Grant is sent on the SCell that the aperiodic CSI report is triggered for, it is easy for the eNB to ensure that CSI-RS is transmitted together with the UL grant. If, however, the UL grant indicates an aperiodic CSI-RS report for a different cell than the one the UL grant is sent on, it may not be possible to transmit CSI-RS in the very first subframe after the eNB has occupied the channel due to the very short processing time available between the successful LBT on the carrier for which reporting is to be done and the transmission time of the UL grant on a different carrier. If, however, the subframe is a later subframe within the eNB's TxOP, the eNB can have more processing time to indicate the presence of the CSI-RS on the SCell that the UL Grant is sent on.
(105) The CSI-RS framework is a UE specific framework, i.e., a specific UE is not aware of other UEs CSI-RS. Furthermore, the CSI-RS are configured currently by a specific periodicity and offset. In addition there are three CSI processes defined for CSI measurements.
(106) Per CSI process, the UE would need to be configured with a rather short periodicity of CSI-RS as the eNB can not guarantee to succeed with LBT for a longer periodicity based CSI-RS configuration. More specifically there is a relationship between the TxOP used by the eNB and the CSI-RS configuration. If the periodicity of the CSI-RS can ensure that a single CSI-RS occasion is within a TxOP that the eNB operates, the CSI-RS can occur at any time occasion within the TxOP. If the CSI-RS occurs in the first subframe and potentially second subframe of the TxOP, it could be difficult for the eNB to be able to indicate accurately that the CSI-RS is present on any other carrier than on the same carrier as the UL Grant is sent on, due to processing delay. In that sense, it would be easier to operate CSI-RS configurations if at least two CSI-RS occasions occur within a single TxOP occasion, with a maximum difference in time between them. This ensures that there is always a CSI-RS resource occasion that is possible for the eNB to indicate to the UE to measure on. The currently defined CSI-RS periodicities are 5, 10, 20, 40 and 80 ms. The mainly considered TxOP values in the LAA design are currently 4 and 10 ms. A CSI-RS with a periodicity of 5 ms can be supported with a TxOP of 10 ms. This assumes that the CSI-RS can occur in any subframe within the TxOP. It is worth noting here that DwPTS does not support CSI-RS configurations so that, if the last DL subframe is corresponding to a DwPTS subframe, a CSI-RS configuration for such a subframe needs to be defined. For a TxOP of 4 ms, a new tighter periodicity of CSI-RS needs to be introduced. This is to ensure the presence of two CSI-RS occasions within the TxOP. For the case of only having a single CSI-RS occasion within a 4 ms TxOP, a 4 ms periodicity is sufficient and for double CSI-RS occasion 2 ms periodicity is required. To simplify the eNB processing it is proposed to allow that there are at least two CSI-RS occasions within the applicable TxOP for LAA.
(107) Accordingly, in some embodiments, a CSI-RS periodicity of 2 ms may be introduced. Given that there are multiple CSI-RS occasions within the TxOP either of the above two discussed solutions for indicating the presence of the CSI-RS are possible. It is noted that the first approach is based on a specific RNTI that is broadcast and the second approach is based on the eNB transmitting an UL Grant per UE. The first solution would need the use of a common search to indicate the message, which is a limited resource. The second approach however, assumes that the number of scheduled UEs is rather low. The last assumption is motivated by the LAA SCell being a small cell, which means that is generally not serving as many UEs as a macro cell.
(108) In an embodiment, the presence of CSI-RS is indicated by a UL grant triggering an aperiodic CSI report for the indicated SCell. The other component of the CSI measurement is the interference measurement. To accurately represent the interference conditions when data is transmitted to the UE, it would be beneficial for the interference to be measured on CSI inteference measurement (CSI-IM) when the serving SCell is transmitting. The simplest approach is that the interference is measured on CSI-IM resources at the same time when the UE performs measurements on the CSI-RS.
(109) In an embodiment, the UE can conduct interference measurements for the purpose of CSI reporting on CSI-IM resource in the same time occasions as the UE does measurements on CSI-RS. There is a risk that two different transmitting entities, either eNB, UEs, ST or APs collide over the air and both grab the channel. If the UE would in such an occasion measure on a CSI-RS and CSI-IM, the measurement would be very noisy and not represent the general conditions of the channel. Within the current LTE design, it is allowed for the UE to average CSI-RS and CSI-IM measurement across different CSI-RS and CSI-IM occasions. If this occurs in the above situation, the measurement error will propagate in time and would not correspond to the actual CSI at the time of a successful transmission. It may therefore be preferred to limit CSI-RS and CSI-IM measurements to a single CSI-RS and CSI-IM occasion and not allow averaging over time. Accordingly, an embodiment may include CSI-RS and CSI-IM measurements that are only based on one CSI-RS and CSI-IM occasion.
(110) In sum, various embodiments may include: LAA SCells that do not support periodic CSI reports, but do support aperiodic CSI reports; introduce a CSI-RS periodicity of 2 ms; the presence of CSI-RS is indicated by a UL grant triggering an aperiodic CSI report for the indicated SCell; there is no need to change the CSI-IM resource handling; and CSI-RS measurements are only based on one CSI-RS occasion.
(111) LBT for LAA UL Transmissions
(112) Different options may be considered for accessing unlicensed spectrum for LAA uplink transmissions. Moreover, we discuss the necessity to consider joint designing of the DL and UL LBT algorithms. This description is about the DL and UL LBT dependency.
(113) Frame Based or Load Based LBT for Uplink Transmission
(114) It has been discussed that the load-based CCA procedure is not only very similar to the Wi-Fi physical medium sensing procedure, but also provides flexible spectrum utilization and adaptability to traffic load. Therefore, it is recommended that the LBT procedure for LAA be designed based on the load-based procedure both for UL and DL transmission. Focusing more on the uplink, the frame based LBT may appear to benefit the UE with power saving and reduced complexity due to the fixed CCA time. However, the load based LBT is also capable of providing such benefits without compromising transmission efficiency due to its flexibility in accessing the channel as opposed to the frame based LBT procedure with its rigid structure. The fact that the UE is aware of its uplink grant 4 ms prior to its corresponding scheduled subframe may provide enough time for the UE to choose a reasonable starting point of CCA.
(115) Also, having the load based LBT approach does not impose unnecessary constraints on the eNB to schedule the UEs for the uplink traffic with consideration to the CCA time as a function of the total transmission duration depending on the number of subframes the UE is scheduled for as in the case of the frame based approach. The load based LBT provides more flexibility in the scheduler to better adapt to uplink traffic load by making the start points of CCA more flexible. Moreover, UE power saving can be achieved by allowing defer periods in channel sensing when the medium is observed to be occupied. For example, a UE that is scheduled for two consecutive subframes starts CCA close to the subframe boundary of the first scheduled subframe. If it fails to succeed in load based LBT for that subframe, the UE can defer and continue sensing close to the next subframe boundary and save power. Note that introducing defer periods can also ensure better coexistence with Wi-Fi.
(116) Accordingly, an embodiment includes, when an LBT procedure is used for uplink transmission in LAA, using ETSI rules defined for Load Based Equipment as a starting point.
(117) Mandatory or Optional LBT for Uplink Transmission:
(118) Enforcing LBT when it comes to uplink transmissions in LAA has been discussed. One embodiment includes a default approach where each UE has to perform LBT to be permitted for its uplink transmission. Although this approach seems reasonable regarding the basic principles of accessing the unlicensed band, it might be possible to relax some of the requirements on UEs to perform LBT prior to uplink transmission without resulting in any unfair exploitation of the unlicensed channel with respect to other transmitting nodes. For example, the number of UEs doing LBT can be probably reduced in a group of UEs that are located close enough to each other and experience similar observed interference. The possible advantages could be improved UE power saving and possibly more efficient transmission by avoiding unnecessary LBT attempts. Moreover, there have been further discussions on relaxing all the UEs on performing LBT for example by sharing the corresponding eNB channel access for uplink transmissions.
(119) Moreover, the discussion of DL+UL LAA is starting and there is considerable range of uncertainty at this point. Note that UL transmission in LTE is not autonomous from the UE side but is controlled and scheduled by the eNB. Hence, in the case of self-scheduling, UL transmissions can happen only if the LAA eNB gain channel access first. Consider the scenario where the LAA network (with 1 LAA eNB+N LAA UEs) is operating on the channel with a Wi-Fi network (with 1 Wi-Fi AP+N Wi-Fi stations). Two first-order considerations are made. First, if the LAA eNB can only gain channel access share on the order of 1/N, the scheduled UEs following similar LBT algorithms will gain channel access on the order of 1/N. The net channel access share of the LAA UEs is then 1/N.sup.2. This type of solution may not achieve a fair sharing of the DL+UL operations for the LAA network. Second, if the LAA eNB can gain channel access share on the order close to ½, the scheduled UE can adopt an LBT algorithm such that they will gain channel access on the order of 1/N. The net channel access share of the LAA UEs is then ½N.
(120) With the above considerations, it is recognized that the LBT attempts at UE for LAA uplink transmissions could be considered mandatory for all UEs, optional for some of the UEs or not required for any of the UEs. Each of the three alternatives differently impact UE power saving and transmission efficiency. In the LTE protocol, UL transmissions are controlled by the eNB through UL grants given to individual UEs.
(121) Accordingly, in some cases, there may be three alternatives for uplink LBT: 1) LBT mandatory for all UEs; 2) LBT optional for some UEs; and 3) LBT not required for all UEs. Uplink LBT should consider the dependency of LTE UL transmissions to DL transmissions through UL grants. In some cases, UL LBT should ensure that the eNB and its serving UEs would benefit a fair sharing of the spectrum in spite of the dependency of LTE UL transmissions to DL transmissions through UL grants.
(122) In sum, potential alternatives for performing LBT at UE side for the LAA uplink transmission are considered. In some embodiments, when an LBT procedure is used for uplink transmission in LAA, ETSI rules defined for Load Based Equipment are considered as a starting point. In some cases, the LBT attempts at UE for LAA uplink transmissions could be considered mandatory for all UEs, optional for some of the UEs or not required for any of the UEs. Each of the three alternatives differently impacts UE power saving and transmission efficiency. In the LTE protocol, UL transmissions may be controlled by the eNB through UL grants given to individual UEs. Three alternatives for uplink LBT may include LBT mandatory for all UEs, LBT optional for some UEs and LBT not required for any of the UEs. Uplink LBT should consider the dependency of LTE UL transmissions to DL transmissions through UL grants. UL LBT may ensure that the eNB and its serving UEs would benefit a fair sharing of the spectrum in spite of the dependency of LTE UL transmissions to DL transmissions through UL grants.
(123) LBT for LAA DL Transmissions
(124) Detailed solutions for the LBT phase in LAA have been discussed in order to ensure fair coexistence with Wi-Fi and other LAA services as well as compliance with regulatory requirements. Here, further details for design of LBT in the downlink for LAA are considered.
(125) Regarding LBT design in DL for LAA, the benefits of a load-based LBT scheme were discussed due to its flexible spectrum utilization and adaptability to traffic load and proposed an LBT protocol, which ensures fair coexistence with other technologies in particular Wi-Fi in the unlicensed spectrum. In some LBT protocol embodiments with additional coexistence measures, additional deferring after sensing an occupied channel and before post-transmission random backoff are added to the EN 301.893 generic load-based LBT procedure to enable better coexistence behavior with Wi-Fi and LAA. The modification provides a means to randomize LAA data transmissions.
(126) In some embodiments, the following LAA LBT procedure is used. As illustrated with a flow chart in
(127) In other words, a successful transmission leads to a restart of the LBT procedure with a newly drawn random backoff counter, N. This ensures that a defer period and a post-transmission random backoff with extended CCA is employed after the end of every transmission burst. Defer periods are incorporated by freezing the backoff counter and deferring back to the initial CCA when the channel is observed to be occupied during the extended CCA.
(128) Some features may be adjusted to enhance the flexibility and efficiency of the LBT protocol with consideration to at least the following objectives: reducing UE complexity and power consumption; reducing overhead; imposing minimum standardization impact; and reducing collision and avoiding channel access starvation.
(129) Regarding freeze periods during a load-based LBT procedure, the starting time instance of the LBT procedure at eNB can be flexible and when eNB is permitted to access the channel it can transmit signals. However, the eNB can be configured to consider time periods during the LBT procedure where no transmission can be initiated within. These time periods can be referred to as “the freeze periods” for simplicity. The initiation of transmission due to the successful LBT can be hence occurred only outside these time intervals.
(130) Configuring freeze periods at eNB during the LBT procedure enhances the corresponding UEs power saving due to the fact that those UEs are not expecting any possible transmission during the freeze periods, since the eNB remains idle during the freeze periods. Moreover, it reduces the overhead due to the possible transmission of the initial/reservation signals. Additionally, this feature increases the opportunities for other contending nodes in the medium to access the channel in an effective manner which can serve a purpose similar to the exponential backoff feature in Wi-Fi technology.
(131) Moreover, the eNB can be configured to have a limited time budget for the CCA operation in the LBT procedure. As an example, the EN ETSI 301.893 generic load-based LBT regulation implies that a contention window of 10 is large enough to fulfil a maximum channel occupancy of 4 ms. This means that for the LBT with a CCA slot of 20 μs, if the largest random backoff number is drawn, a time budget of about 3 OFDM symbols (OS) is required for the LBT to declare success if the channel is idle.
(132)
(133) Fixed OS candidates may be used to initiate data transmission after a successful LBT procedure. Moreover, fixed candidates for initiating the data transmission can reduce the complexity at the UE side where the data would be expected to start arriving in limited time instances.
(134) In the following, corresponding approaches are considered to support EPDCCH and PDCCH self-scheduling. The UE can be configured with either self-scheduling or cross-carrier scheduling. For efficient operations on LAA, self-scheduling has higher importance for being supported since it reduces the scheduling load on the PCell. Moreover, cross-carrier scheduling can have challenges due to the very short delay between the LBT result on the SCell and the scheduling command on the PCell, and cross-carrier scheduling can impose scheduling limitations if the scheduling cell is operating TDD.
(135) In some embodiments, to support self-scheduling with EPDCCH on the LAA SCell, EPDCCH resources should be configured for the SCell. To reduce the UEs complexity, the UE may be configured with one fixed candidate for the EPDCCH starting OS which already exists in the standard. The proper choice of the EPDCCH starting OS depends on the operating point of the LBT protocol. The example in
(136) In some cases, to support self-scheduling with PDCCH on the LAA SCell, only OS #0 can be considered for starting the data transmission to reduce the impact on the PDDCH. However, this implies that in order to release the channel as late as possible, the last subframe has to be shortened at the end that would impact demodulation reference signals (DMRS) and some CSI-RS configurations. Moreover, that subframe from the UE side should be configured differently than other subframes and use a similar structure as downlink pilot time slot (DwPTS), where the last OFDM symbol with CRS may not be available.
(137) However, support of DMRS-based transmission modes may be preferred as compared to the CRS-based transmission modes. This is motivated by the fact that in the context of discontinuous transmission on the LAA SCell, the legacy CRS does not exist as in previous releases. In fact, the CRS can be present only in the subframes that transmission is allowed. Due the unpredictable nature of the unlicensed band there is no guarantee for the existence of CRS even if enhanced International Mobile Telecommunications Advanced (eIMTA) frame work is adopted for LAA. Therefore, the standardization impact in particular on the tests procedures and requirements in RAN4 in relation to non-always available CRS may be significant. This statement holds even if DRS frame work or TDD configuration 0 are considered as a starting point since all rely on the periodicity of the CRS but less frequent. The situation for DMRS based transmission is different since DMRS is present only when data is present. Hence no changes in the specifications are needed as compared to CRS but perhaps some new requirements are needed to specify.
(138) Having said that, the freeze period feature is in general applicable to support both DMRS based or CRS based transmissions, as shown in
(139) Prioritized Channel Access
(140) In some embodiments, a Wi-Fi enhanced distributed channel access (EDCA) mechanism defines four access categories (ACs) to support prioritized quality of service (QoS). Each AC is characterized by specific values for a set of access parameters that statistically prioritize channel access for one AC over another.
(141) In LAA, a similar prioritization of channel access could be defined. One option is to apply different LBT categories to prioritize channel access for different channels and signals, or support data with different QoS requirements in LAA. For example, it would be beneficial to have a prioritized channel access for management and control information over data traffic in LAA. Examples of management and control information can be Discovery Reference Signal (DRS) transmissions, or Master Information Block (MIB) and/or System Information Block (SIB) signals, etc. A different LBT scheme than the LBT procedure proposed in
(142) The transmissions can commence immediately after the initial CCA is cleared. If the channel is determined to be busy during an initial CCA, the commencement of the next CCA is conditionally deferred to the next CCA starting point. Therefore, the management and control information could have a prioritized channel access and have higher probability to be transmitted at the predetermined time instances, which could be especially beneficial for DRS transmission and in turn would facilitate and simplify the DRS reception on UE side.
(143) Another option is to apply different LBT parameters to prioritize channel access for different channels and signals, or support data with different QoS requirements in LAA. The channel access may be prioritized/deprioritized using different LBT parameter settings, such as the CCA duration, freeze periods, contention window sizes, etc. For the channels or signals with a prioritized channel access, for example, with a smaller contention window size, the maximum channel occupancy time can be decreased to maintain a fair coexistence. Accordingly, in embodiment may include supporting prioritized channel access in LAA by, for example, applying different LBT categories, and/or different LBT parameters, etc. For prioritized channel access, the channel/signal with prioritized access should be determined and specified. One example is that DRS should have a prioritized channel access over other transmissions in DL. Moreover, the LBT scheme and LBT parameters need to be specified for the prioritized channel/signal.
(144) In sum, further details on DL LBT in LAA were explained and some embodiments may include the following in the LBT procedure for LAA data transmissions: a random backoff counter, N, is always drawn to start the LBT procedure; an initial CCA is always immediately followed by an extended CCA stage; a successful transmission always leads to a restart of the LBT procedure with a newly drawn random backoff counter, N. This may ensure that a defer period and a post-transmission random backoff with extended CCA is employed after the end of every transmission burst. Defer periods may be incorporated by freezing the backoff counter and deferring back to the initial CCA when the channel is observed to be occupied during the extended CCA. Freeze periods during the LBT procedure may be configured at the eNB where the UE does not expect any signal from the eNB. Self-scheduling may be based on EPDCCH should be considered for LAA SCells. For DMRS-based transmission, the UE may be configured with one of the four candidates of the EPDCCH starting. A candidate may include an offset from the subframe boundary. Maximum channel occupancy of 4 ms may suggests OS #3 as starting symbol for EPDCCH. A new control bit in the DCI message may indicate to the UE starting point of the PDSCH. The default may be a choice between two alternatives of OS #0 and OS #3. Prioritized channel access may be supported in LAA, for example, by applying different LBT categories, and/or different LBT parameters, etc.
(145) Notably, modifications and other embodiments of the disclosed invention(s) will come to mind to one skilled in the art having the benefit of the teachings presented in the foregoing descriptions and the associated drawings. Therefore, it is to be understood that the invention(s) is/are not to be limited to the specific embodiments disclosed and that modifications and other embodiments are intended to be included within the scope of this disclosure. Although specific terms may be employed herein, they are used in a generic and descriptive sense only and not for purposes of limitation.