Underground evacuation shelter
10428548 ยท 2019-10-01
Assignee
Inventors
Cpc classification
E02D29/045
FIXED CONSTRUCTIONS
Y02A50/00
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
E04H9/08
FIXED CONSTRUCTIONS
E04B1/343
FIXED CONSTRUCTIONS
International classification
E04H9/14
FIXED CONSTRUCTIONS
E02D29/045
FIXED CONSTRUCTIONS
E04B1/343
FIXED CONSTRUCTIONS
Abstract
The purpose of the invention is to reduce a cost and a construction period, secure measures for stability of the shelter main body against a tsunami, water pressure resistant performance against the tsunami generated by the Nankai Trough Great Earthquake, safety performance necessary for using the evacuation shelter, and good living comfort, and shorten evacuation time. The shelter main body 3 is connected to the concrete foundation 2 and has a structure with the frame 3a of a columnar structure, the ceiling 3b, and the internal space 9 of a columnar structure. The inner hatch 5 is attached to the periphery of the opening 4 provided in the ceiling 3b by a hinge in an openable and closable manner. A rising portion 6 rises upward from the peripheral edge of the opening 4. The outer hatch 7 is connected to the upper surface of the rising portion 6 by a hinge 7a in an openable and closable manner. A pair of rails 8 is arranged in the vertical direction on the inner wall surface of the frame 3a of a columnar structure of the shelter main body 3. The movable floor 10 is capable of moving up and down inside the internal space 9 along the rails 8.
Claims
1. An underground evacuation shelter, comprising: a shelter main body connected to a concrete foundation, said shelter main body having a frame of a columnar structure and a ceiling, and an internal space of said shelter main body having a columnar structure shape; a hatch of a double structure including an outer hatch and an inner hatch, the inner hatch connected a to periphery of an opening provided in said ceiling via at least one hinge so that the inner hatch opens and closes the opening provided in said ceiling; a movable floor capable of ascending and descending inside said internal space along rails arranged vertically on inner wall surfaces of said shelter main body, wherein said internal space is partitioned into two floors by said movable floor; and an inner hatch fixing rod arranged in a vertical direction for supporting said inner hatch, said inner hatch fixing rod having a structure capable of expansion and contraction, said inner hatch fixing rod passing through and penetrating a notch of said movable floor, an upper end portion of said inner hatch fixing rod supporting said inner hatch, and a lower end portion of said inner hatch fixing rod being in contact with a bottom surface of said shelter main body.
2. The underground evacuation shelter according to claim 1, wherein said outer hatch and said movable floor are connected by a link mechanism, and said outer hatch is interlocked with said movable floor via the link mechanism while ascending and descending of said movable floor.
3. The underground evacuation shelter according to claim 1, wherein said movable floor is movable up and down from an upper stage to a middle stage of said shelter main body.
4. The underground evacuation shelter according to claim 1, wherein said outer hatch is connected to a rising portion by another hinge in an openable and closable manner, and the rising portion is formed upwardly from the periphery of the opening provided in said ceiling.
Description
BRIEF DESCRIPTION OF DRAWINGS
(1)
(2)
(3)
(4)
(5)
(6)
(7)
DESCRIPTION OF EMBODIMENTS
(8) Preferred embodiments of the present invention will be described with reference to the drawings. As shown in
(9) A shelter 1 according to a second embodiment of the present invention will be described with reference to
(10) The shelter main body 3 is connected to the concrete foundation 2, has a cylindrical iron plate 3a and a ceiling 3b made of an iron plate, and has a structure wherein the internal space 9 has a columnar structure. The outer surface of the shelter main body 3 is finished with a water-resistant coating. An inner hatch 5 made of an iron plate is connected to the periphery of an opening 4 provided in the ceiling 3b by hinges so that the inner hatch 5 can be opened and closed. A rising portion 6 rises upward from the periphery of the opening 4. An outer hatch 7 made of an iron plate is connected to the upper surface of the rising portion 6 by hinges 7a so that the outer hatch 7 can be opened and closed. The shelter main body 3 has a pair of rails 8 arranged in the vertical direction on the inner wall surface of the cylindrical iron plate 3a. A movable floor 10 is capable of moving up and down in the internal space 9 along the rail 8. The above will be described in detail below.
(11) For example, the thickness of the iron plate of the shelter main body 3 is 9 mm, and preferably 6 to 12 mm.
(12) It is preferable that an inner hatch fixing rod 11 for supporting the inner hatch 5 and having a structure capable of expansion and contraction is provided in the vertical direction. As shown in
(13) The outer hatch 7 and the movable floor 10 are connected by the link mechanism 15 so that the outer hatch 7 is interlocked with the movable floor 10 when the movable floor 10 moves up and down. The link mechanism 15 includes two arms with a universal joint. The outer hatch fixing member 16 is fixed to the outer surface of the ceiling 3b so that the outer hatch 7 can be detachably fixed to the outer hatch fixing member 16 in the standing state when the outer hatch 7 is opened. The outer hatch 7 is a hatch type opening and closing structure. The outer hatch 7 is preferably a double structure of an iron plate and a fireproof board. A safety sensor (not shown) is installed in the opening/closing part of the outer hatch 7.
(14) The movable floor 10 can be raised and lowered from the upper stage to the middle stage of the internal space 9 of the shelter main body 3. As shown in
(15) In order to support the movable floor 10, floor plate supporting pipes 19 are fixed to the movable floor 10. The end portions of the floor plate supporting pipes 19 have a structure capable of engaging with the teeth of the rails 8 for moving the movable floor. Therefore, the movable floor 10 can be gently raised and lowered. The movable floor 10 can move on the rails 8 and descend to 1400 mm. The power of the movable floor 10 is electrically driven (driven by a battery). When the movable floor 10 cannot be driven electrically, a manual crank 20 is provided. As shown in
(16) As an example of the dimensions of the shelter 1, a height; 3, 100 mm, an outer diameter (diameter); 140 mm, a height of the cylindrical iron plate 3a; 2,800 mm, a height of the rising portion 6; 300 mm, a longitudinal width of the outer hatch 7; 900 mm, a width of the outer hatch 7; 700 mm, for example. It can accommodate up to four adults in the internal space 9. Expansion is possible when increasing the number of people to be accommodated.
(17) The shelter 1 is designed such that the outer hatch 7 and the inner hatch 5 can withstand a water pressure of 200 kN/m.sup.2 at a water depth of 20 meters. It can also withstand typhoons and tornadoes. The outer hatch 7 and the inner hatch 5 provide a double hatch structure to withstand the impact of the colliding objects caused by a tsunami, thereby improving the impact resistance.
(18) For designing the structure of the shelter 1, the calculations of the main body 3 is performed based on the conditions that the shelter main body 3 is subjected to a vertical load and a tsunami load. The calculation of the foundation is performed based on the condition that the shelter main body 3 is installed to the foundation and is subject to a vertical load. Based on the calculation at the time of tsunami loading, concrete casting around the main body and connection with the peripheral foundation can be performed. In addition, the tsunami wave pressure formula is calculated according to the new guidelines such as the Tsunami Disaster Prevention Community Renovation Law announcement etc. The calculation of the foundation is performed according to the calculation formula used for the underground embedded foundations of road signs.
(19) It is preferable to set the building area within 10 m.sup.2 (for example, 9 m.sup.2) where building confirmation application is unnecessary. The size of the shelter main body 3 is calculated assuming the necessary space as 1.5 m.sup.3 per person. It is supposed to accommodate four people for general families. 4 people1.5 m.sup.3=6.0 m.sup.3. It is possible to change the size of the shelter main body according to the conditions such as the existing building and number of people to be accommodated.
(20) Although the case of embedding the shelter in the outdoor of the building is shown, it is also applicable to the case of being installed inside the building.
(21) The planar installation position of the shelter main body 3 is selected from places that are easy to jump in immediately when evacuating such as places next to a front door, a front yard, etc. When the site is wide, it is bonded to an existing concrete structure other than the foundation of the building. The reason is to increase resistance against the moment of a tsunami.
(22) An oxygen cylinder is prepared in the shelter main body 3. By blowing out oxygen, the interior pressure rises.
(23) As the content of oxygen in the shelter is not enough for oxygen aspiration, oxygen is supplied from the oxygen cylinder which is installed in advance. Capacity of the oxygen cylinder is designed to be enough for living inside the shelter depending on the conditions such as the number of people to be accommodated, children or adults and so on.
(24) In order to ensure adequate oxygen concentration, the concentrations of oxygen and carbon dioxide necessary for maintaining safe and secure living comfort within the shelter 1 can be detected by the concentration meter in the room. When the concentration deviates from an appropriate reference value, it is possible to adjust the oxygen concentration by injecting the installed oxygen can. Likewise, the concentration adjustment of carbon dioxide is possible. Target value of the oxygen concentration inside the shelter is 19%. Examples of necessary devices include an oxygen supply device set, an atmospheric pressure adjustment device, a carbon dioxide reduction device set, and the like.
(25) A pressure reduction valve that decreases the pressure of the gas inside the shelter main body 3 is installed. Parts of water supply are also provided. In order to prevent excessive increase of carbon dioxide, carbon dioxide is adsorbed by slaked lime water solution or zeolite to reduce carbon dioxide. Since the storage battery is fully charged by the photovoltaic power generation panel, the storage battery continues to drive the slaked lime pump.
(26) There are multiple (in this example, two) monitors to see the outside. As the monitors does not work in the middle of the night due to darkness, a thermometer is set outside so as to monitor the outside. Outside air temperature, inside air temperature, oxygen concentration, and carbon dioxide concentration can be recorded every predetermined time (for example, 30 minutes). In the case of midwinter, the temperature of the outside air thermometer rises as the tsunami intrudes, the judgement can be done whether or not the tsunami came even in the middle of the night.
(27) The shelter main body 3 has a communication function such as a mobile phone, a satellite phone, a transceiver, etc, simple toilet, AED, and disaster prevention goods etc.
(28) Next, the construction method is explained. Basically, it is assumed that the removal of the floor and the foundation has been completed in the construction work. When installing the main body, a hole having a size larger than the external dimensions of the main body of the underground evacuation shelter 1 both in the vertical and horizontal directions is dug on the ground. The depth is not constant due to a relation between the concrete foundation 2 and the earth pressure, but excavation is carried out based on the above calculation formula. Depending on the case of preliminary survey, it may be necessary to carry out earth retaining work. When an earth retaining work is necessary, it should be carried out simultaneously.
(29) Ground is dug to a prescribed depth using human power and ultra small excavator. The dig work should be carried out paying attention to the behavior of the main body of the building. Especially careful attention is required to the depth of dig. After the dig is completed, pressure is applied by the engine type plate, and then the crushed stone is layered. As the material of the crushed stone, recycled aggregate of JIS standard RC 25 is used. After flattening the crushed stone, the engine plate performs surface compaction for flattening.
(30) Subsequently, the concrete foundation 2 is constructed. If necessary, the rebars of the concrete foundation 2 is connected with the reinforced concrete substructure 101 of the house 100 with rebars, before concrete is cast. Concrete material is ordinary Portland cement. If shortening of construction schedule is necessary, rapid strength concrete shorten curing time. Basically it is on-site construction. Surface protecting concrete is placed on the concrete foundation 2. Concrete material may be ordinary Portland cement.
(31) The concrete foundation 2 may be reinforced by placing a winged steel pipe pile like a screw pile in the earth. This not only supports the shelter 1 but also prevents it from collapsing.
(32) The shelter main body 3 is constructed after concrete is hardened. In the case of on-site construction, concrete is cast after constructing rebars.
(33) The shelter main body 3 is constructed by on-site construction, but it may be precast concrete manufactured at factory. Since this part is heavy, it is carried in with a truck crane. The shelter main body 3 is installed in accordance with the entrance anchor which is buried in the foundation concrete 2 in advance. After installation, it is fixed with nuts. The nuts are uniformly fastened by a torque type wrench.
(34) Next, the inner hatch 5 is attached to the opening 4, and an outer hatch 7 which is a hatch made of fireproof steel is attached to the rising portion 6.
(35)
(36) The effect of this embodiment will be described.
(37) Since the movable floor 10 is provided in the internal space 9, a person inside can move easily, and the internal space can be used efficiently.
(38) Since the outer hatch 7 and the movable floor 10 are connected by the link mechanism 15, the opening and closing efficiency of the outer hatch 7 is increased.
(39) Since the inner hatch fixing rod 11 for supporting the inner hatch 5 is provided, it is possible to prevent the inner hatch 11 from unexpectedly opening and closing, which is highly safe.
(40) The shelter 1 stay in the place where people evacuate to and can withstand secondary disasters such as tsunami, fire, and debris flow, as well as earthquake. Elderly and physically disabled people can safely evacuate. Innovative and more reliable performance highly necessary in modern society is offered.
(41) It is possible to provide a safe shelter with a reduced construction cost and a shortened construction period. In addition, it can be made compact and the construction area of the shelter can be made small. It is possible to omit the application for confirmation to the city government and to reduce the time and labor for building. Furthermore, people can go in and out via above-ground part by opening the outer hatch 5 and the inner hatch 5 which are hatches of fireproof steel. The size of the opening 4 can be increased. As a barrier-free structure, the disabled people can evacuate by covering the floor with a board.
(42) The shelter can be constructed as a set with a house so that the cost can be reduced. For example, it is possible to reduce the cost so that people in income groups with an annual income of 3 million to 4 million yen can afford a safe house with a shelter at a price comparable to that of a rental house. Further, for example, it is possible to reduce the cost to such an extent that the construction cost is less than 3 million yen. The cost can be further cut down by using subsidies. By adopting a structure integrated with the reinforced concrete substructure 101 of the house 100, it is possible to aim for dissemination by reducing the cost as compared to the cost for constructing a shelter alone. For example, it is possible to sell a house of a total floor space of 33 tsubo(109 m.sup.2), with an evacuation shelter in the garden attached thereto, at the 16 million yen level. This is equivalent to the selling price of the residential part of the average spec houses. Housing with added value of an evacuation shelter is expected to be monetized. Above all, it also contributes to the national mission and role of protecting as many lives as possible. In addition, considering land information as one of the commercial items for these people, a set of a house, land information and a shelter is vendible. Furthermore, by reducing the foundation pile, cost reduction is possible.
(43) By making the shelter main body 3 compact, it is possible to reduce the construction area of the shelter. It is thus possible to omit application for confirmation to the city government and to reduce time and labor for building.
(44) The shelter 1 is adjacent to the house 100 such as their own home so that people can go in and out from the above-ground in an emergency to evacuate immediately. Even in an emergency, people can evacuate within 1 minute to 3 minutes. Even elderly people, physically disabled people and infants can evacuate within 3 minutes from the occurrence of an earthquake warning. Even if the shelter is submerged by tsunami, oxygen and other things necessary for life support can be maintained for at least 3 days. It is thus possible to provide an environment to live safely and securely.
(45) In particular, it is possible to provide a safe and secure housing without tsunami concern for people who reside or live in the future in coastal areas.
(46) Water pressure resistance performance is 2 atm (corresponding to water depth of 20 m) and an air conditioning function such as oxygen is provided assuming when the shelter is submerged. For example, food and water sufficient for four adults to live in the shelter for at least 3 days can be stored.
(47) If the shelter main body 3 is precast concrete, it is possible to omit the labor of making, dismantling, and removing, and disposing a temporary frame. In this case, cost can be greatly reduced if the shelter main body 3 is manufactured by casting concrete on a stack of circular tubes which are made of circular tubes or single pipes used for the scaffolding of construction work by bending them into a shape such as a circle. In order to secure the strength of the shelter main body 3, at least one single straight pipe may be disposed at a position across the inner wall of the shelter main body 3 from the upper end surface to the lower end surface of the shelter main body 3.
(48) Since the reinforced concrete 30 and the reinforced concrete structure 300 are connected to each other, sinking of the shelter 1 can be prevented.
(49) Since the outer hatch 7 has a dual structure of a fireproof board of an iron plate, fireproof performance is enhanced. Since the upper part of the shelter 1 is covered with the reinforced concrete 30, the strength and the fireproof performance are improved.
(50) By descending the movable floor 10, it is possible for a person to move while riding on the movable floor 10 and to partition the internal space 9 into two floors.
(51) As the outer hatch 7 is interlocked with the movable floor 10, the outer hatch 7 can be automatically closed.
(52) By supporting the inner hatch 5 with the inner hatch fixing rod 11, safety can be improved.
INDUSTRIAL APPLICABILITY
(53) Evacuation shelters for household use can be provided at low cost with a shortened construction period, and it is possible to provide a safe and secure environment against tsunami, fire, tornado, and the like. Especially in coastal areas, its industrial utility value is great.
SIGNS LIST
(54) 1: an underground evacuation shelter 2: a concrete foundation 3: a shelter main body 100: a house 101: a reinforced concrete substructure 200: a parking lot 201: an automobile 300: a reinforced concrete structure 400: a fence 3a: a cylindrical iron plate 3b: a ceiling 4: an opening 5: an inner hatch 6: a rising portion 7: an outer hatch 7a: a hinge 8: a pair of rails 9: an internal space 10: a movable floor 10a: a notch 11: an inner hatch fixing rod 12: a string or a chain 13: a hanging part 14: an operating part 15: a link mechanism 16: an outer hatch fixing member 17: a fixed floor plate 17a: an opening 18: a gap 19: a floor plate supporting pipe 20: a manual crank 21: a floor plate fixing pipe 30: a reinforced concrete