Steam turbine power plant and method for activating steam turbine power plant
09863283 ยท 2018-01-09
Assignee
Inventors
- Tatsuro Yashiki (Tokyo, JP)
- Yukinori Katagiri (Tokyo, JP)
- Takuya YOSHIDA (Tokyo, JP)
- Miyuki KAWATA (Tokyo, JP)
- Yasuhiro Yoshida (Tokyo, JP)
- Eunkyeong KIM (Tokyo, JP)
- Kenichiro Nomura (Yokohama, JP)
- Kazunori Yamanaka (Yokohama, JP)
- Fumiyuki Suzuki (Yokohama, JP)
- Norihiro Iyanaga (Yokohama, JP)
Cpc classification
F01K7/165
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F01K13/02
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F22B35/00
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
International classification
F01K13/02
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F01K7/16
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
Abstract
A steam turbine power plant includes a life consumption amount calculator configured to calculate life consumption amounts of a turbine rotor based on a value measured by a measurer, a thermal stress limit update timing determining device configured to determine a time when thermal stress limits are updated, an accumulated life consumption amount calculator configured to calculate accumulated life consumption amounts of the turbine rotor when the thermal stress limits are updated, a planned life consumption amount setting device configured to set planned life consumption amounts of the turbine rotor based on the accumulated life consumption amounts of the turbine rotor, a thermal stress limit calculator configured to calculate and update the thermal stress limits based on the planned life consumption amounts of the turbine rotor, and a plant command value calculator configured to calculate a plant command value based on the thermal stress limits.
Claims
1. A steam turbine power plant comprising: a heat source device configured to use a heat source medium to heat a low-temperature fluid and generate a high-temperature fluid; a steam generator configured to generate steam by the high-temperature fluid; a steam turbine that is driven by the steam; a power generator configured to convert driving force of the steam turbine into power; an adjuster configured to adjust a load of the plant; a measurer configured to measure state amounts of the plant; a life consumption amount calculator configured to calculate life consumption amounts of a turbine rotor included in the steam turbine based on the state amounts measured by the measurer; a life consumption amount storage device configured to store the life consumption amounts of the turbine rotor; a thermal stress limit update timing determining device configured to determine a time when thermal stress limits of the turbine rotor are updated; an accumulated life consumption amount calculator configured to accumulate, at a timing when the thermal stress limits of the turbine rotor are updated, life consumption amounts of the turbine rotor after the thermal stress limits are previously updated and calculate the accumulated life consumption amounts of the turbine rotor; a planned life consumption amount setting device configured to set, based on the accumulated life consumption amounts of the turbine rotor, planned life consumption amounts of the turbine rotor for a time period to a time when the thermal stress limits are next updated; a thermal stress limit calculator configured to calculate and update the thermal stress limits based on the planned life consumption amounts of the turbine rotor; and a plant command value calculator configured to calculate, based on the thermal stress limits, a plant command value such that the plant command value does not exceed the thermal stress limits.
2. The steam turbine power plant according to claim 1, further comprising a life consumption amount deviation assignment ratio input device configured to input assignment ratios of deviation of life consumption amounts of the turbine rotor to activation modes of the steam turbine, wherein the planned life consumption amount setting device sets, based on the assignment ratios of the deviation of the life consumption amounts and the accumulated life consumption amounts of the turbine rotor, the planned life consumption amounts for the time period to the time when the thermal stress limits are next updated.
3. The steam turbine power plant according to claim 2, further comprising an activation number input device configured to input the number of times of activation in each of the activation modes, wherein, based on the numbers of the times of the activation, the planned life consumption amount setting device sets the assignment ratios of the deviation of the life consumption amounts of the turbine rotor, the accumulated life consumption amounts of the turbine rotor, and planned life consumption amounts of the turbine rotor for the time period to the time when the thermal stress limits are next updated.
4. A method for activating a steam turbine power plant including a heat source device configured to use a heat source medium to heat a low-temperature fluid and generate a high-temperature fluid, a steam generator configured to generate steam by the high-temperature fluid, a steam turbine that is driven by the steam, a power generator configured to convert driving force of the steam turbine into power, an adjuster configured to adjust a load of the steam turbine power plant, and a measurer configured to measure state amounts of the steam turbine power plant, the method comprising: calculating life consumption amounts of a turbine rotor included in the steam turbine based on the state amounts measured by the measurer; storing the life consumption amounts of the turbine rotor; determining a time when thermal stress limits of the turbine rotor are updated; accumulating, when the thermal stress limits of the turbine rotor are updated, life consumption amounts of the turbine rotor after the thermal stress limits are previously updated and calculating the accumulated life consumption amounts of the turbine rotor; setting, based on the accumulated life consumption amounts of the turbine rotor, planned life consumption amounts of the turbine rotor for a time period from the time when thermal stress limits of the turbine rotor are updated to a time when the thermal stress limits are next updated; calculating and updating the thermal stress limits based on the planned life consumption amounts of the turbine rotor; and calculating, based on the thermal stress limits, a plant command value such that the plant command value does not exceed the thermal stress limits.
5. The method according to claim 4, further comprising inputting assignment ratios of deviation of the life consumption amounts of the turbine rotor to activation modes of the steam turbine, wherein the planned life consumption amounts for the time period to the time when the thermal stress limits are next updated are set based on the assignment ratios of the deviation of the life consumption amounts and the accumulated life consumption amounts of the turbine rotor.
6. The method according to claim 5, further comprising inputting the number of times of activation in each of the activation modes, wherein the planned life consumption amounts of the turbine rotor for the time period to the time when the thermal stress limits are next updated are set based on the numbers of the times of the activation, the assignment ratios of the deviation of the life consumption amounts of the turbine rotor, and the accumulated life consumption amounts of the turbine rotor.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
DESCRIPTION OF THE PREFERRED EMBODIMENTS
First Embodiment
(13) Configuration
(14)
(15) As illustrated in
(16) The heat source device 1 uses heat held by a heat source medium 5 (a gas fuel, a liquid fuel, or a fuel such as a hydrogen-containing fuel in the first embodiment) to heat a low-temperature fluid 6 (air to be burned with the fuel in the first embodiment) and generates a high-temperature fluid 7 (combustion gas used to drive the gas turbine in the first embodiment) and supplies the generated high-temperature fluid 7 to the steam generator 2. The steam generator 2 (exhaust heat recovery boiler in the first embodiment) heats supplied water by thermal exchange with heat held by the high-temperature fluid 7 generated by the heat source device 1 and generates steam 8. The steam turbine 3 is driven by the steam 8 generated by the steam generator 2. A thermometer 13 is provided for the steam turbine 3 and measures the metal temperature of a casing or the like arranged at an initial stage of the steam turbine 3. The power generator 4 is concentrically coupled directly to the steam turbine 3 and converts driving force of the steam turbine 3 into power. The power of the power generator 4 is supplied to a power system (not illustrated), for example.
(17) The heat source medium amount adjuster 14 (fuel adjusting valve in the first embodiment) is installed on a path for supplying the heat source medium 5 to the heat source device 1 and adjusts the amount of the heat source medium to be supplied to the heat source device 1. Specifically, the heat source medium amount adjuster 14 functions as an adjuster for adjusting a plant load of the steam turbine power plant 100 or the amount of energy to be input to the steam turbine power plant 100. In addition, on the path for supplying the heat source medium 5, a flowmeter 11 is installed on the downstream side of the heat source medium amount adjuster 14 in a direction in which the heat source medium 5 flows. The flowmeter 11 measures the amount of the heat source medium 5 to be supplied to the heat source device 1.
(18) The main steam adjusting valve 15 is installed in a main steam pipe that connects the steam generator 2 to the steam turbine 3. The main steam adjusting valve 15 adjusts the flow rate of the steam 8 to be supplied to the steam turbine 3. Specifically, the main steam adjusting valve 15 may function as an adjuster for adjusting a plant load of the steam turbine power plant 100 or the amount of a working medium of the steam turbine 3. In addition, a pressure indicator 12 is installed on the downstream side (side of the steam turbine 3) of the main steam adjusting valve 15 in the main steam pipe in a direction in which the steam 8 flows. The pressure indicator 12 measures pressure of the steam (main steam) 8 flowing in the main steam pile.
(19) The steam turbine activation controller 21 receives state amounts of the steam turbine power plant 100 as measured data 16 or receives various measured values representing the state amounts such as the temperatures and pressures of constituent elements of the steam turbine power plant 100, the temperature and pressure of the working medium, and the flow rate of the working medium. In the present embodiment, the supply amount of the heat source medium 5, which is measured by the flowmeter 11, the pressure of the steam 8, which is measured by the pressure indicator 12, and the metal temperature of the initial stage of the steam turbine 3, which is measured by the thermometer 13, are input as the measured data 16 to the steam turbine activation controller 21. Since values necessary to calculate thermal stress generated in the turbine rotor may vary depending on a calculation method, measured values other than the aforementioned values may be input to the steam turbine activation controller 21 as state amounts of the plant. For example, a thermometer may be installed on the downstream side (side of the steam turbine 3) of the main steam adjusting valve 15 in the direction of the flow of the steam 8 and measure the temperature of the steam 8 flowing in the main steam pipe, and the measured temperature may be input to the steam turbine activation controller 21. The steam turbine activation controller 21 outputs, based on the measured data 16, command values to be used to control the steam turbine power plant 100 as plant command values 17. In the present embodiment, the steam turbine activation controller 21 outputs, as plant command values 17, a command value to be used to adjust the heat source medium 5 to the heat source medium amount adjuster 14 and a command value to be used to adjust the amount of the steam 8 to the main steam adjusting valve 15.
(20) The steam turbine activation controller 21 includes constituent elements such as a life consumption amount calculator 22, a life consumption amount storage device 23, a thermal stress limit update timing determining device 24, an accumulated life consumption amount calculator 25, a planned life consumption amount setting device 26, a thermal stress limit calculator 27, and a plant command value calculator 28. The constituent elements are described below.
(21) The life consumption amount calculator 22 calculates life consumption amounts (turbine rotor life consumption amounts) LC of the turbine rotor for one time of the activation. First, a temperature distribution in a radius direction of the turbine rotor is calculated by calculation of heat transfer to the turbine rotor based on the pressure of the steam 8 flowing in the main steam pipe, which is measured by the pressure indicator 12 and the temperature of the metal arranged at the initial stage of the steam turbine 3, which is measured by the thermometer 13. Next, thermal stress of the turbine rotor is calculated by material mechanics calculation using a linear expansion coefficient, a Young's modulus, a Poisson ratio and the like of the turbine rotor. Based on thermal stress calculated for every hour in the aforementioned manner, a peak value max of the thermal stress of the turbine rotor in one activation process is calculated. The thermal stress for every hour is a thermal stress value calculated for every calculation cycle by the steam turbine activation controller 21. The life consumption amounts LC can be expressed by a function of the peak value max of the thermal stress (refer to
(22) The life consumption amount storage device 23 stores, in a storage device such as a hard disk, the life consumption amounts LC of the turbine rotor for one time of the activation, which is calculated by the life consumption amount calculator 22.
(23) The thermal stress limit update timing determining device 24 determines timings when the thermal stress limits are updated. The update timings are, for example, timings when periodic inspection is performed after a certain time period in which an operation is performed. A time period from a previous update time when the thermal stress limits are previously updated to a current update time when the thermal stress limits are updated is referred to as a previous time period, while a time period from the current update time when the thermal stress limits are updated to a next update time when the thermal stress limits are next updated is referred to as a current time period. The thermal stress limit update timing determining device 24 has a timer (not illustrated) for measuring time. For example, when a set time elapses after the previous update time, the thermal stress limit update timing determining device 24 switches the previous time period to the current time period. The present embodiment assumes that the current time period is equal to the previous time period. These time periods each include at least one cycle from the start of the activation of the steam turbine power plant 100 to the stop of an operation of the steam turbine power plant 100.
(24) The accumulated life consumption amount calculator 25 accumulates, for each of the activation modes or for the hot start, the warm start, and the cold start respectively, a life consumption amount LC belonging to the previous time period based on the life consumption amounts LC for one time of the activation, which is stored in the life consumption amount storage device 23 at the timings determined by the thermal stress limit update timing determining device 24. The accumulated life consumption amount calculator 25 further calculates accumulated life consumption amounts (accumulated life consumption amounts of the turbine rotor) of the turbine rotor for the previous time period.
(25) The planned life consumption amount setting device 26 estimates, based on the accumulated life consumption amounts of the turbine rotor for the previous period, the numbers of times of the activation for one year in each of the activation modes and planned life consumption amounts for the numbers of years of a plant operation in the activation modes and sets planned life consumption amounts LC0 (planned life consumption amounts of the turbine rotor) in one operation for the current time period in each of the activation modes, when a plant operation plan is created. Details of the planned life consumption amount setting device 26 are described later with reference to
(26) The thermal stress limit calculator 27 calculates, based on the planned life consumption amount LC0 of the turbine rotor for the current time period, the thermal stress limit of the turbine rotor in each of the activation modes and updates the thermal stress limit in each of the activation modes. The thermal stress limit in each of the activation modes is determined so that the life consumption amount of the turbine rotor for one time of the activation does not exceed the planned life consumption amount or LCLC0. Specifically, the thermal stress limit is calculated by calculating value max0 corresponding to the planned life consumption amount LC0 based on a thermal stress-life consumption amount curve 300 (refer to
(27) The plant command value calculator 28 determines the plant command values 17 based on the measured data 16 and outputs the plant command values 17 to the heat source medium amount adjuster 14 and the main steam adjusting valve 15 respectively. As described above, in the present embodiment, the plant command values 17 are the command value (heat source medium adjustment command value) to be used to adjust the heat source medium and the command value (main steam adjustment command value) to be used to adjust the amount of the steam 8. Operational amounts (valve opening degrees in the present embodiment) of the heat source medium amount adjuster 14 and the main steam adjusting valve 15 are adjusted by PID for example, control based on the heat source medium adjustment command value and the main steam adjustment command value, for example. The plant command value calculator 28 includes a low value selector (not illustrated). The low value selector selects smaller value which is either one of the command value calculated based on the measured data 16 and the thermal stress limit input from the thermal stress limit calculator 27, as the plant command value 17. Thus, the thermal stress of the turbine rotor is suppressed to a value equal to or lower than the thermal stress limits set by the thermal stress limit calculator 27.
(28)
(29) As illustrated in
(30) The life consumption amount deviation calculator 29 calculates deviation of the life consumption amounts in each of the activation modes based on the accumulated life consumption amounts of the turbine rotor for the previous time period in each of the activation modes, which are calculated by the accumulated life consumption amount calculator 25. The deviation of the life consumption amounts is calculated by subtracting the accumulated life consumption amount from the planned life consumption amount for the previous period.
(31) The planned life consumption amount calculator 30 calculates planned life consumption amounts for the current time period in each of the activation modes based on the deviation of the life consumption amounts. The planned life consumption amount for the current time period is calculated by adding the deviation of the life consumption amount to the planned life consumption amount for the previous time period.
(32) Operations
(33) Next, a procedure for updating the thermal stress limits of the steam turbine activation controller 21 is described with reference to
(34) As illustrated in
(35) The life consumption amount deviation calculator 29 calculates deviations of the life consumption amounts in each of the activation modes based on the accumulated life consumption amounts of the turbine rotor for the previous time period in each of the activation modes, which are calculated by the accumulated life consumption amount calculator 25 (in S106) and outputs the calculated deviations to the planned life consumption amount calculator 30. The planned life consumption amount calculator 30 calculates planned life consumption amounts for the current time period in the activation modes (in S107) based on the deviations of the life consumption amounts and outputs the calculated planned life consumption amounts to the thermal stress limit calculator 27.
(36) The thermal stress limit calculator 27 calculates the thermal stress limit of the turbine rotor for each of the activation modes based on the input planned life consumption amount LC0 of the turbine rotor for the current time period and updates the thermal stress limit (in S108). Then, the thermal stress limit calculator 27 outputs the thermal stress limits to the plant command value calculator 28 (in S109). Then, the procedure illustrated in
(37) The plant command value calculator 28 calculates the command values based on the measured data 16 and compares the command values with the thermal stress limits received from the thermal stress limit calculator 27. The plant command value calculator 28 further outputs a smaller value which is either one of the command value and the thermal stress limit to the heat source medium amount adjuster 14, and outputs a smaller value which is either one of the command value and the thermal stress limit to the main steam adjusting valve 15.
(38) Effects
(39)
(40) The example illustrated in
(41)
(42) In in
(43) In the example illustrated in
(44) As described above, in the present embodiment, if an accumulated life consumption amount obtained based on operational results is smaller than a planned life consumption amount, an interested thermal stress limit of the turbine rotor can be set to a large value by adding a deviation (serving as a margin) of the planned life consumption amount from the accumulated life consumption amount to a planned life consumption amount to be next used, and the plant can be activated at a high speed. On the other hand, if the accumulated life consumption amount is larger than the planned life consumption amount, the thermal stress limit of the turbine rotor can be set to a small value by subtracting the deviation from the planned life consumption amount to be next used, and the plant can be activated while suppressing the life consumption amount. As a result, the plant can be safely activated at a high speed while maintaining the thermal stress at a level equal to or lower than a limit in consideration of operational results of the plant.
Second Embodiment
(45)
(46) Configuration
(47) The second embodiment is different from the first embodiment in that planned life consumption amounts for the current time period are set while the activation modes are weighted. Specifically, as illustrated in
(48) The life consumption amount deviation assignment ratio input device 100 stores an assignment ratio of deviation of life consumption amounts to each of the activation modes. The assignment ratio of the deviation of the life consumption amounts is a set value input by an operator based on an operational state or the like. The life consumption amount to be assigned to each of the activation modes is changed by the set value. Specifically, weighting for each of the activation modes can be performed by setting the assignment ratio.
(49)
(50) Other features are the same as or similar to the first embodiment.
(51) Operations
(52) Next, operations of the planned life consumption amount setting device 126 are described. Details of processes other than processes to be performed by the planned life consumption amount setting device 126 are the same as or similar to those in the first embodiment.
(53) As illustrated in
_T=_1+_2+_3(Equation 160)
LCMG_T=MAX(LCMG_1,0)+MAX(LCMG_2,0)+MAX(LCMG_3,0)(Equation 161)
DLC_i=MIN(LCMG_i,0)+LCMG_T_i/_T(Equation 162)
(54) The planned life consumption amount calculator 130 calculates planned life consumption amounts for the current time period in each of the activation modes based on the life consumption amount deviation assignment values and the like, received from the life consumption amount deviation assignment value calculator 101. Then, the planned life consumption amount calculator 130 outputs the planned life consumption amounts to the thermal stress limit calculator 27. The planned life consumption amounts for the current time period are calculated by adding the life consumption amount deviation assignment values to the planned life consumption amounts for the previous time period.
(55)
(56) In
(57) In the example illustrated in
(58) Effects
(59) In the second embodiment, the effects obtained in the first embodiment and the following effects can be obtained by the aforementioned configuration.
(60) In the second embodiment, the assignment ratios of the deviation to each of the activation modes are input, and the planned life consumption amounts for the current time period are determined based on the life consumption amount deviation assignment values calculated based on the assignment ratios of the deviation. Thus, the plant can be safely activated at a high speed while providing priorities to the activation modes and maintaining the thermal stress at a level equal to or lower than a limit in consideration of operational results of the plant.
Third Embodiment
(61)
(62) Configuration
(63) The third embodiment is different from the second embodiment in that the numbers of times of the activation per year for the current time period are identified and planned life consumption amounts for the current time period are set. Specifically, as illustrated in
(64) The activation number input device 200 stores planned number of times of the activation per year for the current time period in each of the activation modes. The numbers are values input and set by the operator.
(65)
(66) Other features are the same as or similar to those in the second embodiment.
(67) Operations
(68) Next, operations of the planned life consumption amount setting device 226 are described. Details of processes other than processes to be performed by the planned life consumption amount setting device 226 are the same as or similar to the second embodiment.
(69) The life consumption amount deviation calculator 229 calculates deviation of the life consumption amounts in each of the activation modes based on accumulated life consumption amounts of the turbine rotor for the previous time period, which are calculated for each of the activation modes by the accumulated life consumption amount calculator 25, and on the number of times of the activation per year for the current time period in each of the activation modes, which is received from the activation number input device 200. The life consumption amount deviation calculator 229 outputs the deviations of the life consumption amounts to the life consumption amount deviation assignment value calculator 201. The deviations of the life consumption amounts for the previous time period are calculated by subtracting the accumulated life consumption amounts from the planned life consumption amounts for the previous time period. In addition, deviation LCMGS_i of the life consumption amounts is produced by the fact that the number NSC_i of times of the activation per year for the current time period is reduced to be smaller than the number NSC_i of times of the activation per year for the previous time period. The deviation LCMGS_i is calculated according to the following Equation using planned life consumption amounts LC0_i for the previous time period.
LCMGS_i=LC0_iMAX(NSP_iNSC_i,0)/NSP_i(Equation 260)
(70) The life consumption amount assignment value calculator 201 calculates life consumption amount deviation assignment value to be assigned to each of the activation modes, based on the deviation, output from the life consumption amount deviation calculator 229, of the life consumption amounts for the previous time period and the assignment ratio received from the life consumption amount deviation assignment ratio input device 100. The assignment value DLC_i is calculated according to the following Equations.
LCMGS_T=LCMGS_1+LCMGS_2+LCMGS_3 (Equation 261)
DLC_i=MIN(LCMG_i,0)+(LCMG_T+LCMG_T)_i/_T (Equation 262)
(71) In Equation 262, _T and LCMG_T are items calculated in Equations 160 and 161, respectively.
(72)
(73) In
(74) The deviation 252 of the life consumption amounts, which is produced by reducing the number of the times of the activation, are calculated according to Equation 260 based on the number 50 of times of the activation per year for the previous time period, the number 250 of times of the activation per year for the current time period, and the planned life consumption amounts 52 for the previous time period. In addition, the life consumption amount deviation assignment value 251 is calculated according to Equations 160, 161, 261, and 262 based on the deviation 54 of the life consumption amounts for the previous time period, the deviation 252 of the life consumption amounts, which is produced by reducing the number of times of the activation, and the ratio 150 of assigning the deviation of the life consumption amounts. In addition, the planned life consumption amount 55 for the current time period is obtained by adding the life consumption amount deviation assignment value 251 to the planned life consumption amount 52 for the previous time period.
(75) In the example illustrated in
(76) Effects
(77) In the third embodiment, the effects obtained in the first and second embodiments and the following effects can be obtained by the aforementioned configuration.
(78) In the third embodiment, the deviation of the life consumption amounts, which is produced by changing the number of times of the activation per year, is reflected in the planned life consumption amounts for the current time period. Thus, the plant can be safely activated at a high speed while identifying the numbers of times of the activation per year for the current time period, providing priorities to the activation modes, and maintaining the thermal stress at a level equal to or lower than a limit in consideration of operational results of the plant.
(79) Miscellaneous
(80) It is to be noted that the present invention is not limited to the aforementioned embodiments, but covers various modifications. While, for illustrative purposes, those embodiments have been described specifically, the present invention is not necessarily limited to the specific forms disclosed. Thus, partial replacement is possible between the components of a certain embodiment and the components of another. Likewise, certain components can be added to or removed from the embodiments disclosed.
(81) Each of the embodiments describes the case where the thermal stress limit update timing determining device 24 sets times when the thermal stress limits are updated to the times when the periodic inspection is performed after the certain time period in which the operation is performed. However, the essential effect of the invention is the fact that the plant is safely activated at a high speed while maintaining the thermal stress at a level equal to or lower than a limit in consideration of operational results of the plant. Thus, the times when the thermal stress limits are updated are not limited as long as the essential effect is obtained. For example, the timing at which the thermal stress limits are updated may be a timing at which an accumulated life consumption amount of the turbine rotor from the previous update timing at which the thermal stress limits are updated exceeds a set value. In addition, the times when the thermal stress limits are updated may be the times when the periodic inspection is performed after the certain time period in which the operation is performed and the times when an accumulated life consumption amount of the turbine rotor from the previous update time when the thermal stress limits are updated exceeds the set value.
(82) In addition, each of the embodiments describes the case where the invention is applied to the combined cycle power plant as an example. The invention, however, is not limited to the combined cycle power plant and is applicable to all power plants each including a steam turbine and typified by a steam power plant and a solar power plant. In such cases, a procedure for activating the plant is the same as or similar to the procedure for activating the combined cycle power plant.
(83) If the invention is applied to the steam power plant, coal or natural gas may be used as the heat source medium 5, air or oxygen may be used as the low-temperature fluid, a fuel adjusting valve may be used as the heat source medium adjuster 14, a furnace included in a boiler may be used as the heat source device 1, combustion gas may be used as the high-temperature fluid, and a heat transfer unit (steam generator) included in the boiler may be used as the steam generator 2.
(84) If the invention is applied to the solar power plant, sunlight may be used as the heat source medium 5, a device for driving a heat collecting panel may be used as the heat source medium adjuster 14, the heat collecting panel may be used as the heat source device 1, and media such as oil and high-temperature solvent salt, which convert solar thermal energy and hold the converted energy, may be used as the low-temperature fluid and the high-temperature fluid.