Patent classifications
E01D6/00
Method for pre-stressing a steel structure, and steel structure pre-stressed using said method
According to the method, at least one carbon fibre-reinforced polymer band is joined to the steel structure at the end regions thereof, capable of transferring tensile forces. Subsequently, at least one lifting element (7) disposed between the carbon fibre-reinforced polymer band (4) and the steel girder (3) to be reinforced in a region between these end anchorages (5), is extended substantially perpendicular to the carbon fibre-reinforced polymer band (4). So, a tensile force stress is generated between the end regions of the carbon fibre-reinforced polymer band (4). Then, a steel girder treated in such a manner includes at least one carbon fibre-reinforced polymer band, which is each joined to the steel structure (1) at the end regions thereof, capable of transferring tensile forces. In the region between these end regions, a lifting element (7) is disposed between the carbon fibre-reinforced polymer band (4) and the steel girder (3) to be reinforced, by means of which the carbon fibre-reinforced polymer band (4) is subjected to tensile stress by lifting away from the steel girder (3). The tensile force is transferred to the steel girder (3) via the anchoring elements (5).
Method for pre-stressing a steel structure, and steel structure pre-stressed using said method
According to the method, at least one carbon fibre-reinforced polymer band is joined to the steel structure at the end regions thereof, capable of transferring tensile forces. Subsequently, at least one lifting element (7) disposed between the carbon fibre-reinforced polymer band (4) and the steel girder (3) to be reinforced in a region between these end anchorages (5), is extended substantially perpendicular to the carbon fibre-reinforced polymer band (4). So, a tensile force stress is generated between the end regions of the carbon fibre-reinforced polymer band (4). Then, a steel girder treated in such a manner includes at least one carbon fibre-reinforced polymer band, which is each joined to the steel structure (1) at the end regions thereof, capable of transferring tensile forces. In the region between these end regions, a lifting element (7) is disposed between the carbon fibre-reinforced polymer band (4) and the steel girder (3) to be reinforced, by means of which the carbon fibre-reinforced polymer band (4) is subjected to tensile stress by lifting away from the steel girder (3). The tensile force is transferred to the steel girder (3) via the anchoring elements (5).
Structural assemblies for constructing bridges and other structures
Structural assemblies for constructing bridges and other structures. A structural assembly may comprise an elongated member defining an internal space. The structural assembly may also comprise a plurality of framing members connected to the elongated member at a plurality of pin connection nodes, each pin connection node comprising a pin interconnecting the elongated member, a first one of the framing members, and a second one of the framing members, the pin having a first longitudinal end and a second longitudinal end, at least one of the first longitudinal end and the second longitudinal end of the pin being located in the internal space of the elongated member.
Structural assemblies for constructing bridges and other structures
Structural assemblies for constructing bridges and other structures. A structural assembly may comprise an elongated member defining an internal space. The structural assembly may also comprise a plurality of framing members connected to the elongated member at a plurality of pin connection nodes, each pin connection node comprising a pin interconnecting the elongated member, a first one of the framing members, and a second one of the framing members, the pin having a first longitudinal end and a second longitudinal end, at least one of the first longitudinal end and the second longitudinal end of the pin being located in the internal space of the elongated member.
METHOD FOR PRE-STRESSING A STEEL STRUCTURE, AND STEEL STRUCTURE PRE-STRESSED USING SAID METHOD
According to the method, at least one carbon fibre-reinforced polymer band is joined to the steel structure at the end regions thereof, capable of transferring tensile forces. Subsequently, at least one lifting element (7) disposed between the carbon fibre-reinforced polymer band (4) and the steel girder (3) to be reinforced in a region between these end anchorages (5), is extended substantially perpendicular to the carbon fibre-reinforced polymer band (4). So, a tensile force stress is generated between the end regions of the carbon fibre-reinforced polymer band (4). Then, a steel girder treated in such a manner includes at least one carbon fibre-reinforced polymer band, which is each joined to the steel structure (1) at the end regions thereof, capable of transferring tensile forces. In the region between these end regions, a lifting element (7) is disposed between the carbon fibre-reinforced polymer band (4) and the steel girder (3) to be reinforced, by means of which the carbon fibre-reinforced polymer band (4) is subjected to tensile stress by lifting away from the steel girder (3). The tensile force is transferred to the steel girder (3) via the anchoring elements (5).
METHOD FOR PRE-STRESSING A STEEL STRUCTURE, AND STEEL STRUCTURE PRE-STRESSED USING SAID METHOD
According to the method, at least one carbon fibre-reinforced polymer band is joined to the steel structure at the end regions thereof, capable of transferring tensile forces. Subsequently, at least one lifting element (7) disposed between the carbon fibre-reinforced polymer band (4) and the steel girder (3) to be reinforced in a region between these end anchorages (5), is extended substantially perpendicular to the carbon fibre-reinforced polymer band (4). So, a tensile force stress is generated between the end regions of the carbon fibre-reinforced polymer band (4). Then, a steel girder treated in such a manner includes at least one carbon fibre-reinforced polymer band, which is each joined to the steel structure (1) at the end regions thereof, capable of transferring tensile forces. In the region between these end regions, a lifting element (7) is disposed between the carbon fibre-reinforced polymer band (4) and the steel girder (3) to be reinforced, by means of which the carbon fibre-reinforced polymer band (4) is subjected to tensile stress by lifting away from the steel girder (3). The tensile force is transferred to the steel girder (3) via the anchoring elements (5).
Bridge structure
A bridge structure comprises a first supporting structure, at least one first hollow tube and a first monitor. The first supporting structure comprises bases, first pillars, a first platform. The first pillars are coupled to the bases, wherein each of the first pillars comprises first pillar chords and first pillar girders formed as first pillar trusses with the first pillar chords. The first platform is coupled to the first pillars, wherein the first platform comprises a first supporting plane, first platform chords and first platform girders formed as first platform trusses with the first platform chords. The at least one first hollow tube is located between the first pillar trusses or the first platform trusses. The first monitor is located in the at least one first hollow tube, wherein the first monitor is capable of monitoring a bridge stability.
Bridge structure
A bridge structure comprises a first supporting structure, at least one first hollow tube and a first monitor. The first supporting structure comprises bases, first pillars, a first platform. The first pillars are coupled to the bases, wherein each of the first pillars comprises first pillar chords and first pillar girders formed as first pillar trusses with the first pillar chords. The first platform is coupled to the first pillars, wherein the first platform comprises a first supporting plane, first platform chords and first platform girders formed as first platform trusses with the first platform chords. The at least one first hollow tube is located between the first pillar trusses or the first platform trusses. The first monitor is located in the at least one first hollow tube, wherein the first monitor is capable of monitoring a bridge stability.
Modular truss joint
A modular truss joint is a web plate with at least three connectors. Each connection includes a web integrally formed as a portion of the web plate of a certain length. Each connection is positioned at a connector angle with respect to the other connectors. The connections have continuous flanges on a periphery of the modular truss joint. Each flange is oriented transversely to the web. The connectors form a modular structure by each connecting to at least one wide flange body to form a moment resisting connection such that the modular truss joint resists flexure of the modular structure.
Fibre reinforced polymer structures
A structure including a first hollow-section Fibre Reinforced Polymer (FRP) member, and a second hollow-section FRP member arranged at an angle to the first member. A rod extends through the second member. The rod also has a threaded end section extending through or into the first member. The opposed end of the rod is fixed to a further member. A nut secures the threaded end section to the first member, and screwing of the nut and threaded end section together exerts a compressive force on the second member and a tensile force on the rod.