E02B2017/0052
SUBSEA ASSEMBLY MODULARISATION
A subsea assembly comprising; a foundation, a support device; and a subsea equipment adapter frame is provided. The foundation, support device and subsea equipment adapter frame are separate modular components that can be installed separately. The foundation may be a suction anchor. A method of installing and uninstalling the subsea assembly is also provided.
REMOVING SUBMERGED PILES OF OFFSHORE PRODUCTION PLATFORMS
Certain aspects of removing submerged piles of offshore production platforms can be implemented as methods. A top deck of a fixed offshore platform installed on a mudline of a body of water is removed. An upper structure of the fixed offshore platform is removed. The upper structure is below the top deck. A lower structure is secured to the mudline by one or more structural piles remaining. The one or more structural piles, which are housed within one or more members of the lower structure, are driven below the mudline. The lower structure of the fixe offshore platform is removed. The one or more structural piles are left below the mudline.
REMOVING SUBMERGED PILES OF OFFSHORE PRODUCTION PLATFORMS
Certain aspects of removing submerged piles of offshore production platforms can be implemented as methods. A top deck of a fixed offshore platform installed on a mudline of a body of water is removed. An upper structure of the fixed offshore platform is removed. The upper structure is below the top deck. A lower structure is secured to the mudline by one or more structural piles remaining. The one or more structural piles, which are housed within one or more members of the lower structure, are driven below the mudline. The lower structure of the fixe offshore platform is removed. The one or more structural piles are left below the mudline.
Method and apparatus for removing underwater platforms
A method is provided for removing an abandoned marine platform from a seabed. The platform extends below the seabed mud line. In order to remove the platform, a frame is provided having a perimeter that surrounds an open center. The frame is lowered over the platform wherein the platform occupies the open center portion. A movable cutter cable is fitted to the frame. At least a part of the cutter cable is positioned below the mud line. The cutter is moved relative to the frame to cut the platform below the mud line. Such movement can be a back and forth movement wherein the cutter cable moves in a first direction, stops and then moves in a second direction that is generally opposite the first direction. A lifting device can employ two vessels and two frames, each frame bridging from one vessel to the other. Winches on the vessel can be used to provide movement to the cutter cable. These same winches can take up cable slack as cutting moves from one platform member (e.g. leg, jacket leg, piling, etc) to another.
Removing submerged piles of offshore production platforms
Certain aspects of removing submerged piles of offshore production platforms can be implemented as methods. A top deck of a fixed offshore platform installed on a mudline of a body of water is removed. An upper structure of the fixed offshore platform is removed. The upper structure is below the top deck. A lower structure is secured to the mudline by one or more structural piles remaining. The one or more structural piles, which are housed within one or more members of the lower structure, are driven below the mudline. The lower structure of the fixe offshore platform is removed. The one or more structural piles are left below the mudline.
Lifting device for lifting an upper part of a sea platform
The present invention relates to a lifting device for lifting an upper part of a sea platform, the sea platform comprising a support structure and a top side, the lifting device being constructed to be positioned on a lifting vessel, the lifting device comprising: a base frame constructed to rest on the lifting vessel, at least one console frame connected to the base frame via a flexible connection system, a suspension system connected to the console frame and comprising a leg connector, wherein the suspension system is constructed to allow freedom of movement of the leg connector relative to the console frame, wherein the flexible connection system forms a flexible connection between the console frame and the base frame and allows a predetermined movement of the console frame.
METHOD AND APPARATUS OF HOT TAPPING MULTIPLE COAXIAL OR NESTED STRINGS OF UNDERWATER PIPING AND/OR TUBING FOR OVERTURNED WELLS OR PLATFORMS
A method and apparatus for tapping into a pressurized multiple strings of coaxially situated tubulars for wells and/or platforms which have overturned wherein the tapping occurs underwater via a diver or remotely operated vehicle. The assembly includes a tapping tool connectable to the tubular via a saddle connection and an adjustable tapping clamp with adjustable support/locking feet, compression plate with view ports, and angularly adjustable hot tapping system, along with a drill/saw system.
Pile removal system
Some embodiments include an apparatus for cutting a pile. In some embodiments, the apparatus includes a shaft module including a cylindrical shaft including a first cavity configured to receive the pile. In some embodiments, the apparatus also includes a cutting module coupled to the shaft module, the cutting module including a second cavity configured to receive the pile, clamps configured to clamp onto the pile, and a saw configured to cut the pile. In some embodiments, the apparatus also includes a drilling module coupled to the cutting module, the drilling module including blades to burrow into an earth surface.
CONVERSION OF MOVEABLE OFFSHORE DRILLING PLATFORMS TO A WIND TURBINE INSTALLATION UNIT
The present disclosure generally relates to movable offshore platforms for installing wind turbines, and methods of forming the same. The movable offshore platforms are offshore platforms which were previously used in hydrocarbon production, such as jack-up units. The movable offshore platforms may be decommissioned and retrofitted with equipment for installing wind turbines. The movable offshore platforms may be American-made or otherwise Jones Act compliant. Methods of forming the same are also included.
Removing submerged piles of offshore production platforms
Certain aspects of removing submerged piles of offshore production platforms can be implemented as methods. A top deck of a fixed offshore platform installed on a mudline of a body of water is removed. An upper structure of the fixed offshore platform is removed. The upper structure is below the top deck. A lower structure is secured to the mudline by one or more structural piles remaining. The one or more structural piles, which are housed within one or more members of the lower structure, are driven below the mudline. The lower structure of the fixe offshore platform is removed. The one or more structural piles are left below the mudline.