E02D7/18

METHOD FOR INSTALLING A TUBULAR METAL PILE IN ROCKY SOIL
20210292989 · 2021-09-23 ·

A method for installing a tubular metal pile in a rocky ground, successively comprises the steps of drilling the rocky ground in order to form a cavity of predetermined diameter and depth, filling the cavity with a granular material, arranging the granular material present in the cavity by vibration, and installing the pile in the cavity.

METHOD FOR INSTALLING A TUBULAR METAL PILE IN ROCKY SOIL
20210292989 · 2021-09-23 ·

A method for installing a tubular metal pile in a rocky ground, successively comprises the steps of drilling the rocky ground in order to form a cavity of predetermined diameter and depth, filling the cavity with a granular material, arranging the granular material present in the cavity by vibration, and installing the pile in the cavity.

CIVIL ENGINEERING DEVICE

A civil engineering device, in particular a pile-driving or drilling device, has at least one positioner, in particular a working carriage for accommodating an implement, connected with a carrier device by relatively movable links within a kinematic chain and connected by joints and/or linear adjusters and with at least six actuators for changing their corresponding position and/or orientation, and with a control and regulation device for controlling them. The control and regulation device has an input module for specifying a positioner target position, and is connected with a computer module that determines at least one displacement path for moving the positioner from its current (starting) position to the target position, and, using inverse kinematics, the locations of the individual actuators required for implementing the path, and sends these locations to the control and regulation device to control the actuators. A method multi-dimensionally, free positions a civil engineering device positioner.

Trough plate for constructing locked polymer anti-seepage wall and construction method of locked polymer anti-seepage wall

A trough plate for constructing a locked polymer anti-seepage wall includes a plate body, a guide tube, a grouting pipe and an anti-blocking head. A construction method of the locked polymer anti-seepage wall includes the steps of positioning an N.sup.th trough plate and then pressing the N.sup.th trough plate into ground, wherein N is a natural number larger than and equal to 1; engaging an (N+1).sup.th trough plate with the N.sup.th trough plate, and then pressing the (N+1).sup.th trough plate into the ground; connecting a grouting pipe of the N.sup.th trough plate with a grouting machine, pulling out the N.sup.th trough plate, and simultaneously grouting through the grouting pipe of the N.sup.th trough plate by the grouting machine; and repeating the steps (B) and (C) till the locked polymer anti-seepage wall is completed, wherein the steps (B) and (C) are repeated every time, N is automatically increased by 1.

Trough plate for constructing locked polymer anti-seepage wall and construction method of locked polymer anti-seepage wall

A trough plate for constructing a locked polymer anti-seepage wall includes a plate body, a guide tube, a grouting pipe and an anti-blocking head. A construction method of the locked polymer anti-seepage wall includes the steps of positioning an N.sup.th trough plate and then pressing the N.sup.th trough plate into ground, wherein N is a natural number larger than and equal to 1; engaging an (N+1).sup.th trough plate with the N.sup.th trough plate, and then pressing the (N+1).sup.th trough plate into the ground; connecting a grouting pipe of the N.sup.th trough plate with a grouting machine, pulling out the N.sup.th trough plate, and simultaneously grouting through the grouting pipe of the N.sup.th trough plate by the grouting machine; and repeating the steps (B) and (C) till the locked polymer anti-seepage wall is completed, wherein the steps (B) and (C) are repeated every time, N is automatically increased by 1.

BEARING COOLING SYSTEMS AND METHODS FOR VIBRATORY PILE DRIVERS
20210277953 · 2021-09-09 ·

A bearing cooling system for a vibratory pile driving system comprising at least one housing wall defining at least one bearing opening and at least one bearing assembly supported by the at least one housing wall in the at least one bearing opening. The bearing cooling system comprises a bearing cover plate, a bearing cover seal member, and at least one bearing bolt. The bearing cover plate defines an inner surface having a bearing cover plate seal recess. The bearing cover seal member adapted to be received at least partly within the bearing cover plate seal recess. The at least one bearing bolt is configured to secure the bearing cover plate relative to the at least one housing wall to form at least one contact location at which the bearing cover plate is in contact with at least a portion of the at least one bearing assembly.

Systems, Devices, and/or Methods for Driving Posts
20210156168 · 2021-05-27 ·

Certain exemplary embodiments can provide a system comprising a frame, which comprises an outer mast and an inner mast. The outer mast slides along the inner mast. A motor is coupled to the frame. A hydraulic system is coupled to the motor. A jackhammer head is coupled to the outer mast, which outer mast allows the jackhammer head to float up and down on the inner mast as the jackhammer head reciprocates. Thereby vibrations from jackhammer motion substantially do not get transferred to the frame.

Systems, Devices, and/or Methods for Driving Posts
20210156168 · 2021-05-27 ·

Certain exemplary embodiments can provide a system comprising a frame, which comprises an outer mast and an inner mast. The outer mast slides along the inner mast. A motor is coupled to the frame. A hydraulic system is coupled to the motor. A jackhammer head is coupled to the outer mast, which outer mast allows the jackhammer head to float up and down on the inner mast as the jackhammer head reciprocates. Thereby vibrations from jackhammer motion substantially do not get transferred to the frame.

PUMPING UNIT BASES WITH DRIVEN PILES

Embodiments of the present disclosure generally relate to a pumping unit base and methods for operating with the pumping unit base. The pumping unit base may include a plurality of driven piles installed in the ground, and a metal platform fixedly attached to the plurality of driven piles, wherein the metal platform is positioned above the ground. The metal platform may be removed from the driven piles and reinstalled to the driven piles.

Underground construction device

An underground construction device includes a hydraulic assembly having an internal combustion engine and a hydraulic pump driven by the internal combustion engine, a work device connected with the hydraulic assembly in a hydraulic circuit for introducing material to be pile-driven into the ground, a clamping apparatus connected with the work device for holding a material to be pile-driven, in clamped manner, which device has a hydraulic clamping cylinder, as well as a controller for opening and closing the hydraulic clamping apparatus. A further hydraulic pump for building up the clamping pressure of the clamping cylinder of the clamping apparatus is provided, which pump is operated by an electric motor. A method operates such an underground construction device.