Patent classifications
E02D15/08
Foundation construction device and its construction method
A foundation construction device includes a fixed guiding device and a combined device. The fixed guiding device includes a fixed rack and a guiding device. The combined device includes a chain cutter power transmission device, a spoil treatment device, and a rack.
Trenchless method of installing a monolithic manhole in a levee for pipe access
A monolithic manhole is formed in a levee without trenching, to provide access to drain pipes within the levee for maintenance and repair of the pipes. The manhole is formed by first forcing an outer tube downwardly into the earth and levee and removing soil from within the outer tube to expose the pipe. An inner tube is lowered into the outer tube, with an annular space maintained between the tubes. The annular space is filled with concrete, which hardens to form a monolithic vertical wall. A concrete floor may be poured at the bottom of the wall and a cover attached to the top of the wall. A hole is cut in the pipe inside the wall to provide internal access to the pipe.
Hollow Subsea Foundations
A method of installing an upright elongate hollow subsea foundation that is higher than it is wide, such as a suction pile. The foundation is at least partially embedded in seabed soil. A partition layer is placed within the foundation, for example by injecting a grout, supported by a plug of soil that is surrounded by the foundation. The partition layer is placed on the plug of soil at a level that is spaced from the top of the foundation by at least 20% of the height of the foundation. Above the partition layer, the interior of the foundation may be filled with water and/or a rigid body, such as a solid mass or a hollow liquid-filled tank.
Steel pipe cofferdam construction method using suction penetration and stacking of pipe members
A circular pipe member is penetrated into the seabed by a suction pressure, and a plurality of circular pipe members are vertically stacked thereon and integrated thereto to construct a cofferdam. When dismantling the cofferdam, the circular pipe members are disassembled and dismantled in order by using a lifting wire installed at a newly constructed structure installed in the inner space of the cofferdam.
Steel pipe cofferdam construction method using suction penetration and stacking of pipe members
A circular pipe member is penetrated into the seabed by a suction pressure, and a plurality of circular pipe members are vertically stacked thereon and integrated thereto to construct a cofferdam. When dismantling the cofferdam, the circular pipe members are disassembled and dismantled in order by using a lifting wire installed at a newly constructed structure installed in the inner space of the cofferdam.
TRENCHLESS METHOD OF INSTALLING A MONOLITHIC MANHOLE IN A LEVEE FOR PIPE ACCESS
A monolithic manhole is formed in a levee without trenching, to provide access to drain pipes within the levee for maintenance and repair of the pipes. The manhole is formed by first forcing an outer tube downwardly into the earth and levee and removing soil from within the outer tube to expose the pipe. An inner tube is lowered into the outer tube, with an annular space maintained between the tubes. The annular space is filled with concrete, which hardens to form a monolithic vertical wall. A concrete floor may be poured at the bottom of the wall and a cover attached to the top of the wall. A hole is cut in the pipe inside the wall to provide internal access to the pipe.
SECURING MEANS FOR SECURING A CIVIL ENGINEERING ELEMENT, AND CIVIL ENGINEERING METHOD
The invention relates to a securing means and a method for securing a civil engineering element to a construction machine by means of a flexible securing element, wherein a first end of the flexible securing element is attached to the construction machine and a second end is provided with a connecting link which can pass through a securing lug on the civil engineering element and can be releasably fastened to the construction machine by a connecting means. According to the invention, a detection unit is provided on the connecting means, which detection unit is designed for identifying fastening of the connecting link to the connecting means. The detection unit can generate and output a signal if fastening of the connecting link is identified.
STEEL PIPE COFFERDAM CONSTRUCTION METHOD USING SUCTION PENETRAION AND STACKING OF PIPE MEMBERS
A circular pipe member is penetrated into the seabed by a suction pressure, and a plurality of circular pipe members are vertically stacked thereon and integrated thereto to construct a cofferdam. When dismantling the cofferdam, the circular pipe members are disassembled and dismantled in order by using a lifting wire installed at a newly constructed structure installed in the inner space of the cofferdam.
STEEL PIPE COFFERDAM CONSTRUCTION METHOD USING SUCTION PENETRAION AND STACKING OF PIPE MEMBERS
A circular pipe member is penetrated into the seabed by a suction pressure, and a plurality of circular pipe members are vertically stacked thereon and integrated thereto to construct a cofferdam. When dismantling the cofferdam, the circular pipe members are disassembled and dismantled in order by using a lifting wire installed at a newly constructed structure installed in the inner space of the cofferdam.
TOP-TO-BOTTOM CONSTRUCTION SYSTEM
Disclosed is a nesting element for use in a hollow pile. The nesting element is configured to be retained at an opening defined in a wall of the pile. The nesting element comprises a surface that is configured such that, in use, the surface substantially conforms to an internal profile at a transverse cross-section of the pile. Also disclosed are a pile system that employs one or more nesting elements in one or more respective piles, and an installation system for installing the pile system into the ground. Additionally, a method of constructing a retaining wall using the pile system and installation system is disclosed.