Patent classifications
E02B2017/0043
Offshore column tension leg platform
An apparatus and methods for installation of an offshore platform for supporting equipment installations is provided. The apparatus includes a vertical compression assembly and a counteracting tensioning tendon system. The vertical compression assembly may comprise multiple compression members, a column truss, or other configurations.
PILE HOLDING SYSTEM
The invention relates to a pile holding system configured to support the pile in an upright position at a pile installation location next to the vessel. The pile holding system comprises a pile holder and a pile holder support system. The pile holder support system is configured to be mounted on the deck of the vessel, to moveably support the pile holder, and to move the pile holder in a first direction between an inboard position and an outboard position. The pile holder, when in the outboard position, is located outside the contour of the vessel, for holding the pile in the upright position at the installation location. The pile holder, when in the inboard position with the first and second jaw in the open position, is located within the contour of the vessel.
Method for constructing building on water-body
A method for constructing a building on a water-body. The method includes piling a plurality of piles on a bed of the water-body for laying a foundation for the building. The method further includes marking a reference-mark on each of the plurality of piles at a predefined-distance from a surface of the water-body. The method also includes cutting each of the plurality of piles along the reference-mark. The method further comprises installing a first pile-cap, having a plurality of guiding elements extending therefrom, over a first set of piles of the plurality of piles. The method also comprises installing a second pile-cap over a second set of piles of the plurality of piles.
A METHOD FOR INSTALLATION OF A PILE ADAPTED TO SUPPORT AN OFFSHORE WIND TURBINE, WAVE-INDUCED MOTION COMPENSATED PILE HOLDING SYSTEM, VESSEL, AND PILE HOLDER
A method for installation of a pile adapted to support an offshore wind turbine in which the piles are transported horizontally, positioned in a pile holder, rotated to a vertical orientation while being held by the pile holder, and subsequently lowered into the water while being held by the pile holder. The installation vessel is in a floating condition, and the pile holder is compensated for wave-induced motion of the vessel to maintain a predetermined X-Y location independent of the wave-induced motion of the vessel. A pile holding system, a pile holder, and a vessel comprising a pile holding system are also disclosed.
HABITABLE STRUCTURE FOR MARINE ENVIRONMENTS
Scale habitable units are disclosed for use in marine environments, such as the open sea, which are inexpensive to assemble and maintain, while providing habitable space.
Transition piece for a wind turbine
Provided is a transition piece for a wind turbine, to connect a wind turbine to a foundation, wherein the transition piece includes a connection area to be connected to a foundation.
Connection structure for a marine installation, marine installation and method of erecting a marine installation
A connection structure for connecting a seabed anchor to a superstructure for electrical power engineering has a horizontally encircling, vertically extending wall, which bounds a spatial region inside the connection structure. A first connecting section is configured for connection to the superstructure. A second connecting section is configured for connection to the seabed anchor.
OFFSHORE STRUCTURE
An offshore structure having a foundation structure, wherein the foundation structure has at least a first and a second profile, the first profile is designed as a pile and the second profile is designed as a pile sleeve, the second profile encloses the first profile over a penetration length, wherein an interspace is formed between the first and the second profile, the interspace has a casting compound filling over the total penetration length, shear elements are provided on the first and/or the second profile, the shear elements extend into the interspace and effect an axial load dissipation into the casting compound filling, the shear elements are provided only over a first partial length of the penetration length, the first partial length is between 65 and 90% of the total penetration length and a second partial length is free of shear elements, wherein the second partial length forms the upper length of the penetration length in the installed position.
OFFSHORE WIND TURBINE INSTALLATION ARRANGEMENT
Provided is an offshore wind turbine installation arrangement, including a lifting assembly realized to hoist a suspended load between a floating installation vessel and a wind turbine assembly, the lifting assembly including a crane supported by the floating installation vessel; a sensor arrangement realized to sense at least a motion of the floating installation vessel; and a controller realized to control elements of the lifting assembly on the basis of the sensed installation vessel motion to adjust the position of the suspended load relative to the wind turbine assembly. Also provided is a method of hoisting a load between a floating installation vessel and an offshore wind turbine assembly.
METHOD FOR CONSTRUCTING BUILDING ON WATER-BODY
A method for constructing a building on a water-body. The method includes piling a plurality of piles on a bed of the water-body for laying a foundation for the building. The method further includes marking a reference-mark on each of the plurality of piles at a predefined-distance from a surface of the water-body. The method also includes cutting each of the plurality of piles along the reference-mark. The method further comprises installing a first pile-cap, having a plurality of guiding elements extending therefrom, over a first set of piles of the plurality of piles. The method also comprises installing a second pile-cap over a second set of piles of the plurality of piles.