Patent classifications
E02D2300/0029
High strength grouting method for single pile rock-socketed foundation of weakly weathered bed rock for offshore wind power
The present invention is a grouting method for single pile rock-socketed foundation for offshore wind power, comprising: driving a steel casing into an overburden layer to dig the overburden layer and a rock stratum so as to dig a pile hole; hoisting a steel pipe pile into the steel casing and positioning the steel pipe pile in the pile hole, wherein an annular cavity is formed between the inner walls of the steel pipe pile and the pile hole and the bottom of the steel casing; grouting a first grouting layer to the bottom of a pipe hole of the steel pipe pile; grouting a plurality of grouting layers into the upper end of the first grouting layer in the annular cavity; and pulling out the steel casing, wherein after a grouting solution is aged, the steel pipe pile is stably connected to the overburden layer and the rock stratum.
Polymer Composite Timber Pile and Methods
A support having a timber pile. The support has a sheath positioned about the pile and in spaced relation to the pile to define a gap between the sheath and the pile. The support has a cured polymer disposed between the sheath and the pile and permeated into the pile. A method for reinforcing a structure. A method for building a support for a structure.
Methods for constructing tensionless concrete pier foundations and foundations constructed thereby
A tensionless concrete pier foundation for supporting a tower and a method of constructing the same is provided, the foundation having an outer CMP and an inner CMP with an annular space therebetween in which a plurality of sleeved tower anchor bolts are embedded, at least the outer CMP having an upper edge that is flush with the top of the foundation after the tower has been installed. A method of plumbing a tower anchor bolt cage using a bolt alignment ring is also provided that includes coupling the upper ends of the CMPs together with lateral spacing bolts that extend across the annular space. The tower anchor bolt cage is suspended from the lateral spacing bolts by the bolt alignment ring, and the lateral spacing bolts are shimmed on a low side as necessary for leveling the alignment ring and plumbing the bolt cage, before concrete pour.
SYSTEM AND METHOD FOR MONITORING EARTH PRESSURE AND DISPLACEMENT OF MINIATURE STEEL PIPE PILE BODY
A system and method for monitoring an earth pressure and displacement of a miniature steel pipe pile body. Sensor installation holes are drilled at predetermined positions outside the steel pipe pile body and sensor metal protective shell with a thickness slightly lower than that of the XY-TY02A resistance-type miniature earth pressure gauge is welded on the steel pipe pile body. The XY-TY02A resistance-type miniature earth pressure gauges are stuck on the steel pipe pile body. The transmission line of the XY-TY02A resistance-type miniature earth pressure gauges passes through the sensor installation holes and are connected to data acquisition system. The reflective sheet base is welded at the preset position of the miniature steel pipe pile and the reflective sheet is attached to the reflective sheet base to realize displacement monitoring.
OFFSHORE WIND ENERGY SYSTEM
An offshore wind energy system comprising a foundation having a first hollow structural element with a longitudinally extending, circumferential first wall. A cable bushing penetrates through the first wall and is arranged in the first wall. At least one cable guide arrangement extends in a radial direction and is arranged at an outer shell surface of the first wall of the first hollow structural element. The cable guide arrangement is configured to guide a submarine cable exiting the cable bushing from the cable bushing to a submarine bottom surface.
Method and device for producing a foundation element in the ground
The invention relates to a method and a device for producing a foundation element in the ground, wherein a hole is formed in the ground which is filled with a hardenable filling mass in order to form the foundation element. According to the invention provision is made in that prior to the hardening of the filling mass a data carrier is introduced into the hole, on which information on the produced foundation element is stored .
Assembled recyclable rectangular working well with preset detachable door opening and construction method thereof
A method for constructing an assembled recyclable rectangular working well with preset detachable door openings comprises steps of: (I) designing according to functional requirements for a rectangular working well; (II) constructing by supporting piles; (III) installing prefabricated top beam; (IV) edge protection construction; (V) alternate construction of earthwork excavation, retaining slabs and internal support breast beams; (VI) installing the ladder entering the rectangular working well; (VII) rectangular working well back cover; (VIII) demolition of the detachable subsection support piles in the door part and completing the construction of the assembled recyclable rectangular working well in the preset detachable door hole; (IX) after the operation in the well is completed, during the backfilling process of the rectangular working well, gradually recovering the working well components such as the retaining slab, the internal support girder, the prefabricated crown beam and the supporting piles.
SOIL-DISPLACEMENT DRILL, METHOD FOR CONVERTING A SOIL-DISPLACEMENT DRILL AND METHOD FOR FORMING A FOUNDATION PILE
Disclosed herein is a soil-displacement drill for soil-displacing drilling in a surface in order to form a foundation pile, comprising a drill pipe, a drill head at an end of the drill pipe with several flap leaves which are pivotable between a closed position for closing off the end of the drill pipe and an open position for making this end freely accessible, and one or several closing elements to keep these flap leaves in their closed position and prevent pivoting of the flap leaves which are configured to fail during drilling into the surface in such a way that these closing elements do not impede pivoting of the flap leaves. Additionally, disclosed herein is an assembly of a drill head and one or several closing elements for such a soil-displacement drill, a method for soil-displacing drilling, and a method for converting a soil-displacement drill to form such a soil-displacement drill.
POST-TENSIONED WIND TURBINE FOUNDATION
A post-tensioning system that is configured for use with concrete wind turbine foundation designs to post-tension the foundations and reduce the amount of reinforcement steel that is needed compared to conventional non-post-tensioned, steel reinforced concrete foundation designs. In the case of an inverted T gravity foundation, the post-tensioning system described herein reduces the amount of reinforcement steel that is required by 30-40 tons.
HIGH STRENGTH GROUTING METHOD FOR SINGLE PILE ROCK-SOCKETED FOUNDATION OF WEAKLY WEATHERED BED ROCK FOR OFFSHARE WIND POWER
The present invention is a grouting method for single pile rock-socketed foundation for offshore wind power, comprising: driving a steel casing into an overburden layer to dig the overburden layer and a rock stratum so as to dig a pile hole; hoisting a steel pipe pile into the steel casing and positioning the steel pipe pile in the pile hole, wherein an annular cavity is formed between the inner walls of the steel pipe pile and the pile hole and the bottom of the steel casing; grouting a first grouting layer to the bottom of a pipe hole of the steel pipe pile; grouting a plurality of grouting layers into the upper end of the first grouting layer in the annular cavity; and pulling out the steel casing, wherein after a grouting solution is aged, the steel pipe pile is stably connected to the overburden layer and the rock stratum.