Patent classifications
E21B7/136
Drilling platform for amphibious operations
A drilling platform for amphibious operations includes: a base, wherein drive tracks are arranged on both sides of the base, a propeller is disposed at a rear end of the base, and a driving assembly is disposed inside the base; two support cylinders are respectively disposed at two ends of the base; each of the support cylinders contains a sub-cylinder; a pushing cylinder is arranged on a bottom surface of the partition plate; a buoyancy adjustment assembly is provided at a bottom of the base, so as to provide buoyancy support for the base when the base is transferred from land to water. The present invention is suitable for drilling construction of pile foundations of water and land buildings, bridge piers, and transmission line electric tower pile foundations, as well as drilling of oil wells, wherein the drilling platform construction process at different drilling points is omitted.
Drilling platform for amphibious operations
A drilling platform for amphibious operations includes: a base, wherein drive tracks are arranged on both sides of the base, a propeller is disposed at a rear end of the base, and a driving assembly is disposed inside the base; two support cylinders are respectively disposed at two ends of the base; each of the support cylinders contains a sub-cylinder; a pushing cylinder is arranged on a bottom surface of the partition plate; a buoyancy adjustment assembly is provided at a bottom of the base, so as to provide buoyancy support for the base when the base is transferred from land to water. The present invention is suitable for drilling construction of pile foundations of water and land buildings, bridge piers, and transmission line electric tower pile foundations, as well as drilling of oil wells, wherein the drilling platform construction process at different drilling points is omitted.
Buoy For The Processing Of Production Fluids
A buoy comprising a hydrocarbon processing facility for processing production fluids received from an offshore well, the facility being disposed in a portion of the buoy that is submerged below the waterline, has a pressure relief channel for venting gas above the waterline. The pressure relief channel is in fluid communication with a chamber in the buoy which may contain the processing facility, or other equipment presenting an explosive hazard, and is the only conduit through which high pressure is exhausted. In particular, the pressure relief channel can contain the effects of an over-pressurisation event within the chamber such as ignition of flammable gas, and mitigate structural damage to the buoy.
Seabed supported unit and method to provide a shallow water drilling terminal
Various embodiments relate to a method and a seabed supported base structure for providing a shallow water drilling terminal, where a prefabricated floating seabed substructure is towed to site, ballasted to rest on the seabed and/or piled to the seabed forming a seabed foundation. The seabed supported base structure is provided with at least one cantilevered unit with openings for drilling of wells, projecting sideways out from the exterior side of a vertical wall, terminated above sea level. A prefabricated floating drilling module provided with an outrigger with sidewise movable drilling device is towed to the site, guided into the seabed substructure through an opening in the wall structure at the periphery of the base structure, ballasted and mated onto the base structure, whereupon wells are drilled from a drilling gear. Upon completed drilling and operation of the wells, the drilling unit is removed and substituted by a production unit.
Seabed supported unit and method to provide a shallow water drilling terminal
Various embodiments relate to a method and a seabed supported base structure for providing a shallow water drilling terminal, where a prefabricated floating seabed substructure is towed to site, ballasted to rest on the seabed and/or piled to the seabed forming a seabed foundation. The seabed supported base structure is provided with at least one cantilevered unit with openings for drilling of wells, projecting sideways out from the exterior side of a vertical wall, terminated above sea level. A prefabricated floating drilling module provided with an outrigger with sidewise movable drilling device is towed to the site, guided into the seabed substructure through an opening in the wall structure at the periphery of the base structure, ballasted and mated onto the base structure, whereupon wells are drilled from a drilling gear. Upon completed drilling and operation of the wells, the drilling unit is removed and substituted by a production unit.
Drilling platform for amphibious operations
A drilling platform for amphibious operations includes: a base, wherein drive tracks are arranged on both sides of the base, a propeller is disposed at a rear end of the base, and a driving assembly is disposed inside the base; two support cylinders are respectively disposed at two ends of the base; each of the support cylinders contains a sub-cylinder; a pushing cylinder is arranged on a bottom surface of the partition plate; a buoyancy adjustment assembly is provided at a bottom of the base, so as to provide buoyancy support for the base when the base is transferred from land to water. The present invention is suitable for drilling construction of pile foundations of water and land buildings, bridge piers, and transmission line electric tower pile foundations, as well as drilling of oil wells, wherein the drilling platform construction process at different drilling points is omitted.
Drilling platform for amphibious operations
A drilling platform for amphibious operations includes: a base, wherein drive tracks are arranged on both sides of the base, a propeller is disposed at a rear end of the base, and a driving assembly is disposed inside the base; two support cylinders are respectively disposed at two ends of the base; each of the support cylinders contains a sub-cylinder; a pushing cylinder is arranged on a bottom surface of the partition plate; a buoyancy adjustment assembly is provided at a bottom of the base, so as to provide buoyancy support for the base when the base is transferred from land to water. The present invention is suitable for drilling construction of pile foundations of water and land buildings, bridge piers, and transmission line electric tower pile foundations, as well as drilling of oil wells, wherein the drilling platform construction process at different drilling points is omitted.
Method for excavating mud line cellar for subsea well drilling
A method for excavating a well cellar includes lowering an excavating apparatus having a cellar liner therein to a bottom of a body of water. The well cellar is excavated while contemporaneously lowering the cellar liner into the well cellar until a top of the cellar liner is substantially level with the bottom of the body of water. A pilot well is excavated below a bottom of the cellar. A well head support pipe is inserted into the pilot well. The bottom of the well cellar and a top of the cellar liner are covered.
Method for excavating mud line cellar for subsea well drilling
A method for excavating a well cellar includes lowering an excavating apparatus having a cellar liner therein to a bottom of a body of water. The well cellar is excavated while contemporaneously lowering the cellar liner into the well cellar until a top of the cellar liner is substantially level with the bottom of the body of water. A pilot well is excavated below a bottom of the cellar. A well head support pipe is inserted into the pilot well. The bottom of the well cellar and a top of the cellar liner are covered.
A SEABED SUPPORTED UNIT AND METHOD TO PROVIDE A SHALLOW WATER DRILLING TERMINAL
Various embodiments relate to a method and a seabed supported base structure for providing a shallow water drilling terminal, where a prefabricated floating seabed substructure is towed to site, ballasted to rest on the seabed and/or piled to the seabed forming a seabed foundation. The seabed supported base structure is provided with at least one cantilevered unit with openings for drilling of wells, projecting sideways out from the exterior side of a vertical wall, terminated above sea level. A prefabricated floating drilling module provided with an outrigger with sidewise movable drilling device is towed to the site, guided into the seabed substructure through an opening in the wall structure at the periphery of the base structure, ballasted and mated onto the base structure, whereupon wells are drilled from a drilling gear. Upon completed drilling and operation of the wells, the drilling unit is removed and substituted by a production unit.