G06Q10/063114

Phase-Based Access Permissions for Multi-Phase Projects
20230025544 · 2023-01-26 ·

An example computing system is configured to: (i) apply a first access permission setting that defines whether a party can access a data object associated with a multi-phase construction project during a first phase of the multi-phase construction project; (ii) determine that the multi-phase construction project has transitioned from the first phase to a second phase; and (iii) based at least on the determination that the multi-phase construction project has transitioned from the first phase to the second phase, apply a second access permission setting that defines whether the party can access the data object associated with the multi-phase construction project during the second phase of the multi-phase construction project, where the second access permission setting differs from the first access permission setting.

MACHINE COORDINATION AND MANAGEMENT OF UNITING A MINOR WITH A GUARDIAN
20230022006 · 2023-01-26 ·

Technologies and implementations for machine coordination and management of pickup of a minor with a guardian. The machine coordination and management may be facilitated by a child pickup module (CPM).

REMOTE WORKING EXPERIENCE OPTIMIZATION SYSTEMS

Disclosed are various approaches for remote working experience optimization. In some examples, a management service receives task execution data and corresponding user data for multiple client devices. The management service inputs target user context data along with the task execution data and the corresponding user data into a prediction model to identify a task and a task schedule that indicates a time to download and cache task content. Instructions are transmitted for a management agent to download and cache the task content according to the task schedule.

INCIDENT RESPONSE SYSTEMS AND METHODS
20230230188 · 2023-07-20 ·

The present disclosure relates to a networked environment for incident response. In accordance with one aspect, a central system for incident response includes an electronic storage that stores an incident response template having time-relative tasks and contact information for an incident response team, a communication device configured to communicate with a plurality of devices corresponding to at least some of the contact information, one or more processors, and at least one memory storing instructions. The devices include a lead device and mobile devices. The instructions, when executed by the processor(s), cause the central system to receive via the communication device an activation of the incident response template from the lead device at an activation time, schedule an activated incident response based on the activation including scheduling the time-relative tasks based on the activation time, and communicate via the communication device with the mobile devices regarding the activated incident response.

Machine Learning Based Construction Methods, Techniques, and Algorithms
20230229986 · 2023-07-20 · ·

Techniques to automate various aspects related to construction projects, including but not limited to, creation of schedules, verification of construction progress, estimation of costs, updating of schedules, creation and estimation of construction status, use of information generated by construction equipment, and the use of granular information to continually update the same. Data analysis can be used to refine the cost per task and calculate a cost to complete for a construction project. The cost to complete can be viewed at any time and it will be made more accurate by having the cost per task refined from historical data. Additionally, a rate of production statistic can be generated to compare workers across tasks and see if the implicit task durations used to today can be refined. A learning algorithm can be created by using reinforced learning to figure out the next best step if a project task is delayed or put on hold. This action can normalize projects in an effort for them to complete as scheduled and priced.

System, method, and non-transitory computer readable medium for process engineering assistance

An engineering assistant system 1 includes: an engineering server 10 that issues a work list including information related to work necessary for performing the engineering of a process control system 100; and an at least one engineering client 20 that grants work authority for each worker based on the work list issued by the engineering server 10 and makes it possible to perform work on a constituent apparatus that constitutes the process control system 100 within a range of granted work authority.

SYSTEMS AND METHODS FOR LINKING DATA ENTRIES IN DATABASE SYSTEMS

Systems, methods, and devices for data ingestion, database management, and data security. A method includes storing a plurality of data entries in a project bucket on a database, wherein the plurality of data entries represents information applicable to a plurality of data units associated with a project. The method includes organizing at least a portion of the plurality of data units according to a polymorphous data schema. The method includes linking two or more data units of the plurality of data units to generate a project linkage. The method further includes restricting a user from removing only a portion of the project linkage from the project without first manually breaking the project linkage.

PUNCH ITEM WORKER INTERFACE
20230229989 · 2023-07-20 · ·

A method implements a punch item worker interface. The method includes receiving a task image from a worker interface. The task image depicts a worksite corresponding to a task of a checklist item presented in a checklist view. The method further includes updating the checklist item with a task thumbnail corresponding to the task image. The method further includes presenting the checklist view with a notification and with the checklist item updated to include a punch thumbnail of a punch image from a builder interface. The method further includes receiving a punch task image from the worker interface. The method further includes updating the checklist item with a punch task thumbnail corresponding to the punch task image.

PUNCH ITEM BUILDER INTERFACE
20230229990 · 2023-07-20 · ·

A method implements a punch item builder interface. The method includes receiving a punch image from a builder interface. The punch image depicts a worksite corresponding to a task of a checklist item presented in a checklist view. The method further includes updating the checklist item with a punch thumbnail corresponding to the punch image. The method further includes presenting the checklist view with a notification and with the checklist item updated to include a punch review thumbnail of a punch review image from a trade interface. The method further includes presenting the punch review image from the trade interface responsive to the punch review thumbnail. The method further includes updating the checklist item with a punch review thumbnail corresponding to the punch review image.

METHODS FOR VALIDATING THE VERACITY OF A COMPLETED TASK
20230229987 · 2023-07-20 ·

A computer implemented method for validating the veracity of a completed task is disclosed. The method includes receiving and storing registration data from a user, supervisor, and institution. The method receives case information from the user. The method determines if the second device stamp is within a predetermined threshold. If the predetermined threshold is satisfied, then the method sends to the supervisor, a message for approval of the case data. If an approval is received, then the method sends a second message to the user. The method receives a third message from the user. The third message comprises the second message and a request for a token for the approved case. The method sends the third message to a blockchain to receive the token associated with the approved case. The method sends to least one of the user, supervisor, and institution the token associated with the approved case.