Patent classifications
C04B22/144
Work method to design for thickening time by tailoring additives
A method of designing a cement slurry may include: (a) selecting at least a cement and concentration thereof, a water and concentration thereof, and one or more chemical additives and a concentration thereof such that a cement slurry formed from the cement, water, and the one or more chemical additives meet a density requirement; (b) calculating a thickening time of the cement slurry using a thickening time model; (c) comparing the thickening time of the cement slurry to a thickening time requirement, wherein steps (a)-(c) are repeated if the thickening time of the cement slurry does not meet or exceed the thickening time requirement, wherein the step of selecting comprises selecting concentrations and/or different chemical identities for the one or more chemical additives, cement, or water, or step (d) is performed if the thickening time of the cement slurry meets or exceeds the thickening time requirement; and (d) preparing the cement slurry.
Work method to design for thickening time by tailoring additives
A method of designing a cement slurry may include: (a) selecting at least a cement and concentration thereof, a water and concentration thereof, and one or more chemical additives and a concentration thereof such that a cement slurry formed from the cement, water, and the one or more chemical additives meet a density requirement; (b) calculating a thickening time of the cement slurry using a thickening time model; (c) comparing the thickening time of the cement slurry to a thickening time requirement, wherein steps (a)-(c) are repeated if the thickening time of the cement slurry does not meet or exceed the thickening time requirement, wherein the step of selecting comprises selecting concentrations and/or different chemical identities for the one or more chemical additives, cement, or water, or step (d) is performed if the thickening time of the cement slurry meets or exceeds the thickening time requirement; and (d) preparing the cement slurry.
Method to design for thickening time using cementitious blend composition
A method of designing a cement slurry may include: (a) selecting at least a cement and concentration thereof, water and concentration thereof, and, optionally, at least one supplementary cementitious material and a concentration thereof, such that a cement slurry comprising the cement, the water, and, if present, the at least one supplementary cementitious material, meet a density requirement; (b) calculating a thickening time of the cement slurry using a thickening time model; (c) comparing the thickening time of the cement slurry to a thickening time requirement, wherein steps (a)-(c) are repeated if the thickening time of the cement slurry does not meet or exceed the thickening time requirement, wherein the selecting comprises selecting different concentrations and/or different chemical identities for the cement and/or the supplementary cementitious material than previously selected, or step (d) is performed if the thickening time of the cement slurry meets or exceeds the thickening time requirement; and preparing the cement slurry.
Method to design for thickening time using cementitious blend composition
A method of designing a cement slurry may include: (a) selecting at least a cement and concentration thereof, water and concentration thereof, and, optionally, at least one supplementary cementitious material and a concentration thereof, such that a cement slurry comprising the cement, the water, and, if present, the at least one supplementary cementitious material, meet a density requirement; (b) calculating a thickening time of the cement slurry using a thickening time model; (c) comparing the thickening time of the cement slurry to a thickening time requirement, wherein steps (a)-(c) are repeated if the thickening time of the cement slurry does not meet or exceed the thickening time requirement, wherein the selecting comprises selecting different concentrations and/or different chemical identities for the cement and/or the supplementary cementitious material than previously selected, or step (d) is performed if the thickening time of the cement slurry meets or exceeds the thickening time requirement; and preparing the cement slurry.
Construction method for using phosphogypsum in embankment improvement
A construction and/or installation method for using phosphogypsum in embankment improvement includes preparing a phosphogypsum-containing embankment mixture, setting moisture content of an embankment mixture, paving a modified phosphogypsum-containing embankment, and reversely layering anti-seepage cushion layers from two sides of the embankment to the center of the embankment. The preparation of a phosphogypsum-containing embankment mixture can include the following: 90 parts by weight of phosphogypsum and 10 parts by weight of cement are weighted, uniformly mixed and stirred to obtain a base material mixture; and 2-4 parts by weight of sodium silicate is weighted and dissolved in water, and an obtained solution is added to the base material mixture to obtain the phosphogypsum-containing embankment mixture. The construction and/or installation method for using phosphogypsum in an embankment improvement can satisfy embankment strength and rebound modulus requirements, and can be widely applied to a filling-deficient area and an area with a relatively high yield of phosphogypsum solid wastes.
Construction method for using phosphogypsum in embankment improvement
A construction and/or installation method for using phosphogypsum in embankment improvement includes preparing a phosphogypsum-containing embankment mixture, setting moisture content of an embankment mixture, paving a modified phosphogypsum-containing embankment, and reversely layering anti-seepage cushion layers from two sides of the embankment to the center of the embankment. The preparation of a phosphogypsum-containing embankment mixture can include the following: 90 parts by weight of phosphogypsum and 10 parts by weight of cement are weighted, uniformly mixed and stirred to obtain a base material mixture; and 2-4 parts by weight of sodium silicate is weighted and dissolved in water, and an obtained solution is added to the base material mixture to obtain the phosphogypsum-containing embankment mixture. The construction and/or installation method for using phosphogypsum in an embankment improvement can satisfy embankment strength and rebound modulus requirements, and can be widely applied to a filling-deficient area and an area with a relatively high yield of phosphogypsum solid wastes.
Method To Design For Thickening Time Using Cementitious Blend Composition
A method of designing a cement slurry may include: (a) selecting at least a cement and concentration thereof, water and concentration thereof, and, optionally, at least one supplementary cementitious material and a concentration thereof, such that a cement slurry comprising the cement, the water, and, if present, the at least one supplementary cementitious material, meet a density requirement; (b) calculating a thickening time of the cement slurry using a thickening time model; (c) comparing the thickening time of the cement slurry to a thickening time requirement, wherein steps (a)-(c) are repeated if the thickening time of the cement slurry does not meet or exceed the thickening time requirement, wherein the selecting comprises selecting different concentrations and/or different chemical identities for the cement and/or the supplementary cementitious material than previously selected, or step (d) is performed if the thickening time of the cement slurry meets or exceeds the thickening time requirement; and preparing the cement slurry.
Method To Design For Thickening Time Using Cementitious Blend Composition
A method of designing a cement slurry may include: (a) selecting at least a cement and concentration thereof, water and concentration thereof, and, optionally, at least one supplementary cementitious material and a concentration thereof, such that a cement slurry comprising the cement, the water, and, if present, the at least one supplementary cementitious material, meet a density requirement; (b) calculating a thickening time of the cement slurry using a thickening time model; (c) comparing the thickening time of the cement slurry to a thickening time requirement, wherein steps (a)-(c) are repeated if the thickening time of the cement slurry does not meet or exceed the thickening time requirement, wherein the selecting comprises selecting different concentrations and/or different chemical identities for the cement and/or the supplementary cementitious material than previously selected, or step (d) is performed if the thickening time of the cement slurry meets or exceeds the thickening time requirement; and preparing the cement slurry.
Work Method To Design For Thickening Time By Tailoring Additives
A method of designing a cement slurry may include: (a) selecting at least a cement and concentration thereof, a water and concentration thereof, and one or more chemical additives and a concentration thereof such that a cement slurry formed from the cement, water, and the one or more chemical additives meet a density requirement; (b) calculating a thickening time of the cement slurry using a thickening time model; (c) comparing the thickening time of the cement slurry to a thickening time requirement, wherein steps (a)-(c) are repeated if the thickening time of the cement slurry does not meet or exceed the thickening time requirement, wherein the step of selecting comprises selecting concentrations and/or different chemical identities for the one or more chemical additives, cement, or water, or step (d) is performed if the thickening time of the cement slurry meets or exceeds the thickening time requirement; and (d) preparing the cement slurry.
Work Method To Design For Thickening Time By Tailoring Additives
A method of designing a cement slurry may include: (a) selecting at least a cement and concentration thereof, a water and concentration thereof, and one or more chemical additives and a concentration thereof such that a cement slurry formed from the cement, water, and the one or more chemical additives meet a density requirement; (b) calculating a thickening time of the cement slurry using a thickening time model; (c) comparing the thickening time of the cement slurry to a thickening time requirement, wherein steps (a)-(c) are repeated if the thickening time of the cement slurry does not meet or exceed the thickening time requirement, wherein the step of selecting comprises selecting concentrations and/or different chemical identities for the one or more chemical additives, cement, or water, or step (d) is performed if the thickening time of the cement slurry meets or exceeds the thickening time requirement; and (d) preparing the cement slurry.