E02D17/02

Building foundation and soil stabilization method and system
11585066 · 2023-02-21 · ·

System and means soil stabilization and moisture control for building foundations including methods and systems for stabilization moisture in a site for building foundation by applying soil moisture stabilization material in various forms, a preferred stabilization material being a mixture of aluninosilicate Pozzolan mineral and granular material such as sand.

Building foundation and soil stabilization method and system
11585066 · 2023-02-21 · ·

System and means soil stabilization and moisture control for building foundations including methods and systems for stabilization moisture in a site for building foundation by applying soil moisture stabilization material in various forms, a preferred stabilization material being a mixture of aluninosilicate Pozzolan mineral and granular material such as sand.

CATENARY PANEL RETAINING WALL
20220325494 · 2022-10-13 · ·

A retaining wall system, retaining wall panel, and method of constructing a retaining wall, wherein panels of the retaining wall define an arched or curved profile in plan view, for example following a catenary curvature, with the wall panel curvature being concave in a direction extending into the backfill area behind the retaining wall. The curvature resists backfill loading on the panel and evenly distributes the load across the panel without significant stress concentrations and transfers the load to posts or columns to which the panels are mounted.

INTELLIGENT ANTI-SEISMIC DEVICE FOR SHALLOW FOUNDATION ANCIENT BUILDINGS, AND CONSTRUCTION METHOD THEREFOR
20230145593 · 2023-05-11 ·

Disclosed is an intelligent anti-seismic device for a shallow foundation ancient building, which may include a land, a foundation base and an ancient building body, foundation pit is excavated on a surface of the land, a plurality of piles are arranged on an inner wall of the foundation pit, a foundation side beam is integrally formed by pouring on tops of the plurality of piles, a first earthquake proof mechanism capable of being lifted and lowered is fixed on a top of the foundation side beam, a well-shaped base is integrally formed on the inner wall of the foundation pit, a second earthquake proof mechanism is fixed on a surface of the well-shaped base, a frame is fixed on both tops of the first earthquake proof mechanism and the second earthquake proof mechanism, a grillage beam is integrally formed on an inner wall of the frame.

INTELLIGENT ANTI-SEISMIC DEVICE FOR SHALLOW FOUNDATION ANCIENT BUILDINGS, AND CONSTRUCTION METHOD THEREFOR
20230145593 · 2023-05-11 ·

Disclosed is an intelligent anti-seismic device for a shallow foundation ancient building, which may include a land, a foundation base and an ancient building body, foundation pit is excavated on a surface of the land, a plurality of piles are arranged on an inner wall of the foundation pit, a foundation side beam is integrally formed by pouring on tops of the plurality of piles, a first earthquake proof mechanism capable of being lifted and lowered is fixed on a top of the foundation side beam, a well-shaped base is integrally formed on the inner wall of the foundation pit, a second earthquake proof mechanism is fixed on a surface of the well-shaped base, a frame is fixed on both tops of the first earthquake proof mechanism and the second earthquake proof mechanism, a grillage beam is integrally formed on an inner wall of the frame.

Construction method

The invention relates to a construction method, in which an excavation pit is produced in the ground and in the excavation pit foundation elements are produced at predetermined working points with at least one working apparatus. According to the invention provision is made in that in a computer unit the dimensions of the excavation pit, the working points and the dimensions of the at least one working apparatus are entered and in that in the computer unit a required workspace for the at least one working apparatus and an open space in the excavation pit are determined automatically.

Construction method

The invention relates to a construction method, in which an excavation pit is produced in the ground and in the excavation pit foundation elements are produced at predetermined working points with at least one working apparatus. According to the invention provision is made in that in a computer unit the dimensions of the excavation pit, the working points and the dimensions of the at least one working apparatus are entered and in that in the computer unit a required workspace for the at least one working apparatus and an open space in the excavation pit are determined automatically.

Building Foundation and Soil Stabilization Method and System
20230203776 · 2023-06-29 · ·

System and means soil stabilization and moisture control for building foundations including methods and systems for stabilization moisture in a site for building foundation by applying soil moisture stabilization material in various forms, a preferred stabilization material being a mixture of aluninosilicate Pozzolan mineral and granular material such as sand.

Building Foundation and Soil Stabilization Method and System
20230203776 · 2023-06-29 · ·

System and means soil stabilization and moisture control for building foundations including methods and systems for stabilization moisture in a site for building foundation by applying soil moisture stabilization material in various forms, a preferred stabilization material being a mixture of aluninosilicate Pozzolan mineral and granular material such as sand.

HYBRID FOUNDATION STRUCTURE, AND METHOD FOR BUILDING SAME
20170370065 · 2017-12-28 ·

A hybrid foundation structure includes a first perforation hole formed in the ground, at least one second perforation hole formed adjacent to the first perforation hole on a side surface of the first perforation hole, and a first pile and a second pile formed by mixing and injecting soil and soil solidifying agent into the first perforation hole and the second perforation hole.