E02D29/07

Prestressed tube section structure and construction method thereof

The present application discloses a prestressed tube section structure and a construction method thereof. The prestressed tube section structure includes multiple successively connected segments. A shear-resistant structure and a water stop system are arranged between two segments; multiple prestressing tendons are arranged in the tube section along the circumferential direction of the tube section; and each prestressing tendon is communicated along the longitudinal direction of the tube section, and is partitioned into multiple sections at a position close to a segment joint. By the arrangement of the multiple successively connected segments of the present application, the shear-resistant structure and the water stop system are arranged between the two segments, so that a portion between two segments may bear a shear force and have watertightness; the arrangement of the multiple prestressing tendons in the tube section enables the multiple segments to be connected in series and spliced into a whole; in addition, each prestressing tendon is partitioned into multiple sections at the position close to each segment joint, so that the tube section has higher flexibility on the premise of not losing the overall rigidity, and the loading capacity and deformability of each segment are effectively improved; and a proper pressure is applied between two segments, so that the tube section has higher deformability to adapt to a subsea foundation bed.

Final joint of immersed tunnel as well as prefabrication method and installation method

The present application discloses a final joint of an immersed tunnel, a prefabrication method and an installation method, wherein the final joint includes two end surfaces connected with installed adjacent tube sections; the two end surfaces are both tilted surfaces, so that the longitudinal profile of the final joint along an installation direction is of an inverted trapezoid structure; and the final joint further may be of a structure with a tube section I and a tube section II which are connected with each other. The final joint of the immersed tunnel is simple in structure, convenient to control and relatively high in precision, thereby reducing lots of open sea diving work and lowering a risk of installation quality defects; as prefabrication procedures are simple, the final joint may be prefabricated in a land factory and then transported to the site, thereby reducing influence of weather conditions on construction; a body structure of the final joint is prefabricated in the factory, and then the overall final joint is transported to the site for installation; water stop systems realize quick water stop, thus forming a dry construction environment; and therefore, the influence of weather and tidal current conditions on a project may be reduced, and a quality risk may be lowered.

Final joint of immersed tunnel as well as prefabrication method and installation method

The present application discloses a final joint of an immersed tunnel, a prefabrication method and an installation method, wherein the final joint includes two end surfaces connected with installed adjacent tube sections; the two end surfaces are both tilted surfaces, so that the longitudinal profile of the final joint along an installation direction is of an inverted trapezoid structure; and the final joint further may be of a structure with a tube section I and a tube section II which are connected with each other. The final joint of the immersed tunnel is simple in structure, convenient to control and relatively high in precision, thereby reducing lots of open sea diving work and lowering a risk of installation quality defects; as prefabrication procedures are simple, the final joint may be prefabricated in a land factory and then transported to the site, thereby reducing influence of weather conditions on construction; a body structure of the final joint is prefabricated in the factory, and then the overall final joint is transported to the site for installation; water stop systems realize quick water stop, thus forming a dry construction environment; and therefore, the influence of weather and tidal current conditions on a project may be reduced, and a quality risk may be lowered.

Prestressed Tube Section Structure and Construction Method thereof
20190063062 · 2019-02-28 ·

The present application discloses a prestressed tube section structure and a construction method thereof. The prestressed tube section structure includes multiple successively connected segments. A shear-resistant structure and a water stop system are arranged between two segments; multiple prestressing tendons are arranged in the tube section along the circumferential direction of the tube section; and each prestressing tendon is communicated along the longitudinal direction of the tube section, and is partitioned into multiple sections at a position close to a segment joint. By the arrangement of the multiple successively connected segments of the present application, the shear-resistant structure and the water stop system are arranged between the two segments, so that a portion between two segments may bear a shear force and have watertightness; the arrangement of the multiple prestressing tendons in the tube section enables the multiple segments to be connected in series and spliced into a whole; in addition, each prestressing tendon is partitioned into multiple sections at the position close to each segment joint, so that the tube section has higher flexibility on the premise of not losing the overall rigidity, and the loading capacity and deformability of each segment are effectively improved; and a proper pressure is applied between two segments, so that the tube section has higher deformability to adapt to a subsea foundation bed.

Final Joint of Immersed Tunnel as well as Prefabrication Method and Installation Method

The present application discloses a final joint of an immersed tunnel, a prefabrication method and an installation method, wherein the final joint includes two end surfaces connected with installed adjacent tube sections; the two end surfaces are both tilted surfaces, so that the longitudinal profile of the final joint along an installation direction is of an inverted trapezoid structure; and the final joint further may be of a structure with a tube section I and a tube section II which are connected with each other. The final joint of the immersed tunnel is simple in structure, convenient to control and relatively high in precision, thereby reducing lots of open sea diving work and lowering a risk of installation quality defects; as prefabrication procedures are simple, the final joint may be prefabricated in a land factory and then transported to the site, thereby reducing influence of weather conditions on construction; a body structure of the final joint is prefabricated in the factory, and then the overall final joint is transported to the site for installation; water stop systems realize quick water stop, thus forming a dry construction environment; and therefore, the influence of weather and tidal current conditions on a project may be reduced, and a quality risk may be lowered.

Final Joint of Immersed Tunnel as well as Prefabrication Method and Installation Method

The present application discloses a final joint of an immersed tunnel, a prefabrication method and an installation method, wherein the final joint includes two end surfaces connected with installed adjacent tube sections; the two end surfaces are both tilted surfaces, so that the longitudinal profile of the final joint along an installation direction is of an inverted trapezoid structure; and the final joint further may be of a structure with a tube section I and a tube section II which are connected with each other. The final joint of the immersed tunnel is simple in structure, convenient to control and relatively high in precision, thereby reducing lots of open sea diving work and lowering a risk of installation quality defects; as prefabrication procedures are simple, the final joint may be prefabricated in a land factory and then transported to the site, thereby reducing influence of weather conditions on construction; a body structure of the final joint is prefabricated in the factory, and then the overall final joint is transported to the site for installation; water stop systems realize quick water stop, thus forming a dry construction environment; and therefore, the influence of weather and tidal current conditions on a project may be reduced, and a quality risk may be lowered.