Patent classifications
E02D29/073
SEMI-SUBMERSIBLE IMMERSED TUBE TRANSPORTATION AND INSTALLATION INTEGRATED SHIP AND CONSTRUCTION PROCESS
The present application provides a semi-submersible immersed tube transportation and installation integrated ship and a construction process; the integrated ship includes: a deck structure; two floating structures, ballast water being able to be injected therein; and upper portions or top surfaces of the two floating structures are connected by the deck structure; and two support mechanisms, disposed on opposite sides of the two floating structures respectively; and each support mechanism is disposed at a lower portion or a bottom of the floating structure. The integrated ship can reduce the draught of the integrated ship carrying an immersed tube and realize the transportation requirements of shallow waterway.
SEMI-SUBMERSIBLE IMMERSED TUBE TRANSPORTATION AND INSTALLATION INTEGRATED SHIP AND CONSTRUCTION PROCESS
The present application provides a semi-submersible immersed tube transportation and installation integrated ship and a construction process; the integrated ship includes: a deck structure; two floating structures, ballast water being able to be injected therein; and upper portions or top surfaces of the two floating structures are connected by the deck structure; and two support mechanisms, disposed on opposite sides of the two floating structures respectively; and each support mechanism is disposed at a lower portion or a bottom of the floating structure. The integrated ship can reduce the draught of the integrated ship carrying an immersed tube and realize the transportation requirements of shallow waterway.
Semi-submersible immersed tube transportation and installation integrated ship and construction process
The present application provides a semi-submersible immersed tube transportation and installation integrated ship and a construction process; the integrated ship includes: a deck structure; two floating structures, ballast water being able to be injected therein; and upper portions or top surfaces of the two floating structures are connected by the deck structure; and two support mechanisms, disposed on opposite sides of the two floating structures respectively; and each support mechanism is disposed at a lower portion or a bottom of the floating structure. The integrated ship can reduce the draught of the integrated ship carrying an immersed tube and realize the transportation requirements of shallow waterway.
Semi-submersible immersed tube transportation and installation integrated ship and construction process
The present application provides a semi-submersible immersed tube transportation and installation integrated ship and a construction process; the integrated ship includes: a deck structure; two floating structures, ballast water being able to be injected therein; and upper portions or top surfaces of the two floating structures are connected by the deck structure; and two support mechanisms, disposed on opposite sides of the two floating structures respectively; and each support mechanism is disposed at a lower portion or a bottom of the floating structure. The integrated ship can reduce the draught of the integrated ship carrying an immersed tube and realize the transportation requirements of shallow waterway.
UNDERWATER TUNNEL CONSTRUCTION METHOD USING TUNNEL MODULES, AND UNDERWATER TUNNEL CONSTRUCTED THEREBY
The present invention relates to: an underwater tunnel construction method for constructing an underwater tunnel by successively coupling new tunnel modules to the end of an already-constructed body part while moving a launching girder forward, wherein the new tunnel modules are sunk up to the opening of the launching girder and then introduced into the launching girder by using guide cables; and an underwater tunnel constructed by the construction method.
UNDERWATER TUNNEL CONSTRUCTION METHOD USING TUNNEL MODULES, AND UNDERWATER TUNNEL CONSTRUCTED THEREBY
The present invention relates to: an underwater tunnel construction method for constructing an underwater tunnel by successively coupling new tunnel modules to the end of an already-constructed body part while moving a launching girder forward, wherein the new tunnel modules are sunk up to the opening of the launching girder and then introduced into the launching girder by using guide cables; and an underwater tunnel constructed by the construction method.
Post-grouting method for immersed tube joint base
The present application relates to the field of immersed tube jointing, and more particularly relates to a post-grouting method for an immersed tube joint base. The post-grouting method includes the following steps: before locked backfilling of immersed tubes to be implanted, disposing a grouting tube capable of outputting solidifiable slurry in a furrow below immersed tubes; and after the locked backfilling, grouting the immersed tubes by using the grouting tube. For the purposes of adjusting postures and heights of the immersed tubes in case of abnormal settlement during installation, solving the problems on the stabilities and the service lives of immersed tube joints due to settlement of gravel mattresses or a geologic structure thereunder after installation, and enabling the immersed tubes to achieve a better bearing effect on a load during use, the present application provides the post-grouting method for the immersed tube joint base.
Post-grouting method for immersed tube joint base
The present application relates to the field of immersed tube jointing, and more particularly relates to a post-grouting method for an immersed tube joint base. The post-grouting method includes the following steps: before locked backfilling of immersed tubes to be implanted, disposing a grouting tube capable of outputting solidifiable slurry in a furrow below immersed tubes; and after the locked backfilling, grouting the immersed tubes by using the grouting tube. For the purposes of adjusting postures and heights of the immersed tubes in case of abnormal settlement during installation, solving the problems on the stabilities and the service lives of immersed tube joints due to settlement of gravel mattresses or a geologic structure thereunder after installation, and enabling the immersed tubes to achieve a better bearing effect on a load during use, the present application provides the post-grouting method for the immersed tube joint base.
Prestressed tube section structure and construction method thereof
The present application discloses a prestressed tube section structure and a construction method thereof. The prestressed tube section structure includes multiple successively connected segments. A shear-resistant structure and a water stop system are arranged between two segments; multiple prestressing tendons are arranged in the tube section along the circumferential direction of the tube section; and each prestressing tendon is communicated along the longitudinal direction of the tube section, and is partitioned into multiple sections at a position close to a segment joint. By the arrangement of the multiple successively connected segments of the present application, the shear-resistant structure and the water stop system are arranged between the two segments, so that a portion between two segments may bear a shear force and have watertightness; the arrangement of the multiple prestressing tendons in the tube section enables the multiple segments to be connected in series and spliced into a whole; in addition, each prestressing tendon is partitioned into multiple sections at the position close to each segment joint, so that the tube section has higher flexibility on the premise of not losing the overall rigidity, and the loading capacity and deformability of each segment are effectively improved; and a proper pressure is applied between two segments, so that the tube section has higher deformability to adapt to a subsea foundation bed.
Prestressed tube section structure and construction method thereof
The present application discloses a prestressed tube section structure and a construction method thereof. The prestressed tube section structure includes multiple successively connected segments. A shear-resistant structure and a water stop system are arranged between two segments; multiple prestressing tendons are arranged in the tube section along the circumferential direction of the tube section; and each prestressing tendon is communicated along the longitudinal direction of the tube section, and is partitioned into multiple sections at a position close to a segment joint. By the arrangement of the multiple successively connected segments of the present application, the shear-resistant structure and the water stop system are arranged between the two segments, so that a portion between two segments may bear a shear force and have watertightness; the arrangement of the multiple prestressing tendons in the tube section enables the multiple segments to be connected in series and spliced into a whole; in addition, each prestressing tendon is partitioned into multiple sections at the position close to each segment joint, so that the tube section has higher flexibility on the premise of not losing the overall rigidity, and the loading capacity and deformability of each segment are effectively improved; and a proper pressure is applied between two segments, so that the tube section has higher deformability to adapt to a subsea foundation bed.