E04B1/164

System and method for modular construction
11732465 · 2023-08-22 ·

A building module for use in construction of a building comprising a deck oriented in a horizontal plane and a plurality of hollow structural members extending downwardly from around a periphery of the deck. A method of constructing a building comprising placing a plurality of prefabricated modules according to a floor plan to form a story of the building, pouring concrete into the hollow structural members of the plurality of modules to form structural columns, pouring concrete onto the decks of the plurality of prefabricated modules for form structural slabs, and allowing the structural columns and structural slabs to set to complete the story of the building. Embodiments include a plurality of techniques for sealing adjacent prefabricated modules and for installing a balcony on the prefabricated modules.

SYSTEM AND METHOD FOR MODULAR CONSTRUCTION
20220002991 · 2022-01-06 ·

A building module for use in construction of a building comprising a deck oriented in a horizontal plane and a plurality of hollow structural members extending downwardly from around a periphery of the deck. A method of constructing a building comprising placing a plurality of prefabricated modules according to a floor plan to form a story of the building, pouring concrete into the hollow structural members of the plurality of modules to form structural columns, pouring concrete onto the decks of the plurality of prefabricated modules for form structural slabs, and allowing the structural columns and structural slabs to set to complete the story of the building. Embodiments include a plurality of techniques for sealing adjacent prefabricated modules and for installing a balcony on the prefabricated modules.

Building construction method
11377838 · 2022-07-05 · ·

A building construction method uses wall frames having a moveable top track. The track is fixed in a raised position so as to be load-bearing during construction, allowing construction work to progress quickly. When supporting concrete columns have cured, the fixing can be released allowing the track to move into a lowered position and for the building load to transfer to the columns.

Prefabricated wall and assembly structure for prefabricated building, and construction method therefor
11401707 · 2022-08-02 ·

A prefabricated wall for a prefabricated building includes a concrete body and a rigid framework arranged inside the poured concrete body, the rigid framework comprises n longitudinally extending vertical rebars, with n being an integer greater than or equal to three; an upper end face and a lower end face of the prefabricated wall are formed with m mechanical connection portions at positions sharing the same axes as the vertical rebars, with m being an integer less than or equal to 2n; and the mechanical connection portions are all formed at end portions of the vertical rebars. An assembly structure for a prefabricated building is further provided. The assembly structure is formed by filling an assembly gap with an on-site poured layer after rebars are firmly connected at an overhead region between an upper-layer wall, a lower-layer wall and a floor slab by means of fastening components.

PREFABRICATED WALL AND ASSEMBLY STRUCTURE FOR PREFABRICATED BUILDING, AND CONSTRUCTION METHOD THEREOR
20210277651 · 2021-09-09 ·

A prefabricated wall for a prefabricated building includes a concrete body and a rigid framework arranged inside the poured concrete body, the rigid framework comprises n longitudinally extending vertical rebars, with n being an integer greater than or equal to three; an upper end face and a lower end face of the prefabricated wall are formed with m mechanical connection portions at positions sharing the same axes as the vertical rebars, with m being an integer less than or equal to 2n; and the mechanical connection portions are all formed at end portions of the vertical rebars. An assembly structure for a prefabricated building is further provided. The assembly structure is formed by filling an assembly gap with an on-site poured layer after rebars are firmly connected at an overhead region between an upper-layer wall, a lower-layer wall and a floor slab by means of fastening components.

Building construction system with split precast horizontal floor supports
20210180310 · 2021-06-17 ·

The disclosed building construction system with split precast horizontal floor supports combines the strength and ease of construction of pre-cast concrete, with ease of transportation of cast-in-place concrete. The system avoids the requirement of casting difficult shapes by breaking the complex T-shape sections of prior patents into separate flat pieces. The formwork for flat pieces is simpler than that of complex items that include both long and wide components. For examine, T-shapes and cross-shapes are hard to cast and difficult to transport because these shapes do not sit flat, and thus must be supported at their ends. Instead of this complex casting and transport, the slabs are separated into shapes that can later be placed around the columns. This simulates the strength of a fully-precast system, while reducing the precast costs and transportation costs.

CONSTRUCTION SYSTEM USING PREFABRICATED CONCRETE ELEMENTS
20210071419 · 2021-03-11 ·

The invention relates to a construction system using multi-layer precast concrete elements, combining vertical elements (FIG. 1) and horizontal elements. The vertical elements are formed by precast panels containing the following layers: outer or facade layer (1), an insulating layer (2), a structural concrete layer (3) and internal finishing layer (6). Horizontal elements include a layer of structural concrete.

BUILDING CONSTRUCTION METHOD
20200399886 · 2020-12-24 · ·

A building construction method uses wall frames having a moveable top track. The track is fixed in a raised position so as to be load-bearing during construction, allowing construction work to progress quickly. When supporting concrete columns have cured, the fixing can be released allowing the track to move into a lowered position and for the building load to transfer to the columns.

Building construction method
10822786 · 2020-11-03 · ·

A building construction method uses wall frames having a moveable top track. The track is fixed in a raised position so as to be load-bearing during construction, allowing construction work to progress quickly. When supporting concrete columns have cured, the fixing can be released allowing the track to move into a lowered position and for the building load to transfer to the columns.

Method for forming a plurality of beams connected in series

A method for forming a plurality of beams connected in series is provided. The method comprises the following steps: providing a plurality of columns; providing a plurality of pre-assembled bar combinations, wherein each of the plurality of pre-assembled bar combinations comprises a plurality of lower main bars and a plurality of lower stirrups, and at least one end of the plurality of the lower main bars has connection sections extending beyond the plurality of lower stirrups; hoisting each of the bar combinations so that the two ends thereof are placed on top of two adjacent columns of the plurality of columns and the connection sections of the plurality of lower main bars of adjacent plurality of bar combinations overlap; and connecting the plurality of connection sections of the plurality of lower main bars of the adjacent plurality of bar combinations.