E04B2/842

Floor Levelling Arrangement and Method Therefor
20180010348 · 2018-01-11 ·

The present invention relates to a settable material aligning arrangement that allows for settable material to be aligned to a desired level before the settable material sets. It can be used for ensuring that a poured concrete floor or shotcreted wall is levelled accurately. The settable material aligning arrangement is fixed to a support base and includes a base arrangement and an aligning formation that can be fixed at varying distances from each other by a coupling arrangement.

System and method for shotcrete construction

Systems and methods of shotcrete construction are contemplated whereby guide rails are placed in proximity and forward to a shotcrete receiving surface, with any guide rails disposed directly in front of the shotcrete receiving surface being configured to be offset from the receiving surface allowing shotcrete to be sprayed behind the offset guide rails. Following application of shotcrete, a screed configured to engage with and traverse along at least two of the guide rails may be used to rod the shotcrete via a protruding region of the screed extending beyond the guide rails, thereby removing excess shotcrete and imparting to the shotcrete surface a contour at least partially defined by the configuration of the guide rails and the configuration of the protruding region of the screed. Complex, precise, and even exotic architectural shotcrete installations may be created in this fashion by providing a suitable set of guide rails and screed.

SYSTEM AND METHOD FOR SHOTCRETE CONSTRUCTION
20230148127 · 2023-05-11 ·

Systems and methods of shotcrete construction are contemplated whereby guide rails are placed in proximity and forward to a shotcrete receiving surface, with any guide rails disposed directly in front of the shotcrete receiving surface being configured to be offset from the receiving surface allowing shotcrete to be sprayed behind the offset guide rails. Following application of shotcrete, a screed configured to engage with and traverse along at least two of the guide rails may be used to rod the shotcrete via a protruding region of the screed extending beyond the guide rails, thereby removing excess shotcrete and imparting to the shotcrete surface a contour at least partially defined by the configuration of the guide rails and the configuration of the protruding region of the screed. Complex, precise, and even exotic architectural shotcrete installations may be created in this fashion by providing a suitable set of guide rails and screed.

SYSTEM AND METHOD FOR SHOTCRETE CONSTRUCTION
20210324640 · 2021-10-21 ·

Systems and methods of shotcrete construction are contemplated whereby guide rails are placed in proximity and forward to a shotcrete receiving surface, with any guide rails disposed directly in front of the shotcrete receiving surface being configured to be offset from the receiving surface allowing shotcrete to be sprayed behind the offset guide rails. Following application of shotcrete, a screed configured to engage with and traverse along at least two of the guide rails may be used to rod the shotcrete via a protruding region of the screed extending beyond the guide rails, thereby removing excess shotcrete and imparting to the shotcrete surface a contour at least partially defined by the configuration of the guide rails and the configuration of the protruding region of the screed. Complex, precise, and even exotic architectural shotcrete installations may be created in this fashion by providing a suitable set of guide rails and screed.

System and method for shotcrete construction

Systems and methods of shotcrete construction are contemplated whereby guide rails are placed in proximity and forward to a shotcrete receiving surface, with any guide rails disposed directly in front of the shotcrete receiving surface being configured to be offset from the receiving surface allowing shotcrete to be sprayed behind the offset guide rails. Following application of shotcrete, a screed configured to engage with and traverse along at least two of the guide rails may be used to rod the shotcrete via a protruding region of the screed extending beyond the guide rails, thereby removing excess shotcrete and imparting to the shotcrete surface a contour at least partially defined by the configuration of the guide rails and the configuration of the protruding region of the screed. Complex, precise, and even exotic architectural shotcrete installations may be created in this fashion by providing a suitable set of guide rails and screed.

Solid Cement Construction Panel
20210115668 · 2021-04-22 ·

A solid cement construction panel includes an interior core filling sandwiched between two exterior faces to form a composite panel. The interior core filling is constructed to have a high strength cement, EPS (expanded polystyrene) foam, fly ash, sand particles and water, wherein the interior core filling has properties of heat preservation and soundproof. Each of the exterior faces is made of fiber reinforced material having properties of light weight, heat insulation, fireproof, and waterproof and moisture-proof.

A Building
20210032857 · 2021-02-04 · ·

A method for forming a building includes obtaining a mould, spraying a first spray material onto the outside of the mould so that it sets generally in the shape of the mould to provide a core. The core has side walls, and end wall integral with the side walls and a roof integral with both the side walls and end wall. A second spray material different to the first spray material is sprayed onto the inner and outer surfaces of the core to give it a rigid skin.

SYSTEM AND METHOD FOR SHOTCRETE CONSTRUCTION
20210207388 · 2021-07-08 ·

Systems and methods of shotcrete construction are contemplated whereby guide rails are placed in proximity and forward to a shotcrete receiving surface, with any guide rails disposed directly in front of the shotcrete receiving surface being configured to be offset from the receiving surface allowing shotcrete to be sprayed behind the offset guide rails. Following application of shotcrete, a screed configured to engage with and traverse along at least two of the guide rails may be used to rod the shotcrete via a protruding region of the screed extending beyond the guide rails, thereby removing excess shotcrete and imparting to the shotcrete surface a contour at least partially defined by the configuration of the guide rails and the configuration of the protruding region of the screed. Complex, precise, and even exotic architectural shotcrete installations may be created in this fashion by providing a suitable set of guide rails and screed.