E04G17/065

Tool for the in situ construction of a sandwich wall, and method applying same
11555315 · 2023-01-17 · ·

A tooling for manufacturing a wall with two concrete walls, between which at least one insulation panel is trapped includes at least one system for positioning the insulation panel composed, on one hand of a dagger having a rod provided with a bearing stop and, on the other hand, of a lock provided with a counter-stop. The lock has at least two notches for receiving a first reinforcement, arranged locally on the circumference of the positioning system, extending set back from a first end of the rod, delimited on either side by retaining stops spaced apart so as to maintain in position the first reinforcement, and defines a housing with a profile converging in the opposite direction to their opening, and arranged according to the length of the positioning system to be able to adjust the position of the first reinforcement according to the length of the positioning system.

CONSTRUCTION METHOD FOR RADIATION-PROOF CONCRETE HOLE RESERVED SPLIT BOLT

A construction method for a radiation-proof concrete hole reserved split bolt includes: 1) mounting a hole reserved sleeve; 2) mounting an inclined recoverable split bolt; 3) mounting an inclined split bolt; 4) fixing the inclined recoverable split bolt and an inclined split bolt main body; 5) pouring concrete, and dismantling related components; 6) plugging the inclined split bolt main body; and 7) plugging the hole reserved sleeve. According to the construction method, the hole reserved sleeve is obliquely arranged, the inner side of the hole reserved sleeve is sprayed with a radiation-proof coating with the functions of reducing radiation ray reflection and absorbing certain radiation rays, and in addition, after the construction of a pipeline or a line in the hole reserved sleeve is finished, the openings at both ends of the hole reserved sleeve are plugged with a radiation-proof mortar incorporated with a micro-expanding agent and a waterproof agent.

Formwork tie
11697943 · 2023-07-11 · ·

A tie nut of a formwork tie for connecting two formwork elements is secured on a tie rod to prevent inadvertent rotation by way of a form fit coupling that can be axially made to engage therewith.

Formwork tie
11697943 · 2023-07-11 · ·

A tie nut of a formwork tie for connecting two formwork elements is secured on a tie rod to prevent inadvertent rotation by way of a form fit coupling that can be axially made to engage therewith.

Self-annealing concrete, self-annealing concrete forms, temperature monitoring system for self-annealing concrete forms and method of making and using same
11536040 · 2022-12-27 ·

The invention comprises a product. The product comprises a first removable concrete form having a concrete forming face and a first insulating panel insert having a first primary surface and an opposite second primary surface, wherein the second primary surface of the first insulating panel insert contacts the concrete forming face of the first removable concrete form. The product also comprises an elongate anchor member having an enlarged portion and an elongate portion, the elongate portion having a first end and an opposite second end, wherein the enlarged portion is disposed adjacent the first end and contacts the second primary surface of the first insulating panel insert and wherein the elongate portion extends through the first insulating panel insert and extends outwardly from the first primary surface of the first insulating panel insert. A method of using a removable insulated concrete form system is also disclosed.

METHOD FOR USING AERATED AUTOCLAVED CONCRETE IN RESIDENTIAL AND COMMERCIAL CONSTRUCTION
20220403641 · 2022-12-22 ·

A method for construction using a panel and plank system that may optionally be made of Aerated Autoclaved Concrete (AAC), wherein wall panels are delivered, erected and attached to structural forms and braced with properly designed shoring/struts with form ties and specifically designed “panel ties”. Intermediate bracing is installed at midspan locations where spans are short and there is a possibility of wall buckling. Floor/roof planks are set on top of the walls being cognizant of bearing surface requirements. The deformed and post-tension reinforcing steel is set/installed and any miscellaneous detailing is completed. Thin AAC panels can be installed as form liners for added insulation where dimensions accommodate them. Structural grout or small aggregate concrete is placed, consolidated/vibrated, and finished and allowed to cure to minimum required strengths. Roof pours are given a “crown” to allow proper drainage.

Concrete form with removable sidewall
11591813 · 2023-02-28 · ·

A concrete form includes a first sidewall and a second sidewall positioned in parallel and spaced relation to each other and a cross tie having opposed first and second ends, where at least the first sidewall is a removable sidewall removably secured to the first end of the cross tie. The second sidewall is removably secured to the second end of the cross tie and may be a removable sidewall or a non-removable sidewall. The concrete form also includes a spacer positioned between the first sidewall and the first end of the cross tie. The spacer may be removable along with the first sidewall. Concrete forming assemblies and methods may incorporate concrete forms as described herein.

Cladded Wall System
20230058151 · 2023-02-23 ·

A cladded wall system for constructing cladded cast-in-place concrete walls that are each integrated with lost forms comprising a self-supporting structure made of a plurality of prefabricated cladded panels (PCPs) constituting an exterior lost form, at least one architectural element constituting an interior lost form, and a plurality of concrete integratable connecting units by which each of said PCPs is connected to said interior lost form.

Cladded Wall System
20230058151 · 2023-02-23 ·

A cladded wall system for constructing cladded cast-in-place concrete walls that are each integrated with lost forms comprising a self-supporting structure made of a plurality of prefabricated cladded panels (PCPs) constituting an exterior lost form, at least one architectural element constituting an interior lost form, and a plurality of concrete integratable connecting units by which each of said PCPs is connected to said interior lost form.

Concrete Wall Form Removable Bolt Tie Sleeve
20220364377 · 2022-11-17 ·

The Concrete Wall Form Removable Bolt Tie Sleeve is a process developed that utilizes a flexible polyolefin plastic sleeve to improve the efficiency of the current concrete wall forming process. The bolt tie is placed inside the flexible polyolefin plastic sleeve before inserted into the wall form. The sleeve saves the installer time by no prior greasing of the bolt tie, no returning on site to “turn” the bolt tie, and no cleaning of the bolt tie after it has been removed. The flexible polyolefin plastic allows the sleeve to not adhere to the concrete, allowing the bolt tie and the flexible polyolefin plastic sleeve to be easily removed after the concrete has dried.