E21B3/06

Device for a pipe handling unit and method of inserting and withdrawing a pipe string in/from a borehole

A pipe-handling system includes at least two pipe-handling units arranged in a vertically displaceable manner along respective guide tracks of, respectively, first and second portions of a tower. The pipe-handling unit is provided with lower and upper rotary units spaced apart vertically on a chassis. Each of the rotary units is provided with a rotatable tong and a hanging-off device. A method is for inserting and withdrawing a pipe string in/from a borehole by the use of the pipe-handling system.

Device for a pipe handling unit and method of inserting and withdrawing a pipe string in/from a borehole

A pipe-handling system includes at least two pipe-handling units arranged in a vertically displaceable manner along respective guide tracks of, respectively, first and second portions of a tower. The pipe-handling unit is provided with lower and upper rotary units spaced apart vertically on a chassis. Each of the rotary units is provided with a rotatable tong and a hanging-off device. A method is for inserting and withdrawing a pipe string in/from a borehole by the use of the pipe-handling system.

Sequencing for pipe handling

A method sequence for handling tubulars into or out of a wellbore, the method comprising: moving a tubular string into or out of a wellbore via a top drive; moving tubular stands to and from a setback position and a stand handoff position via a transfer bridge racker and a setback guide arm; moving tubular stands to and from the stand handoff position and a well center position via a tubular delivery arm and a lower stabilizing arm; building stands and breaking down stands offline via a mousehole and operating a roughneck on joints between the tubular stands and the tubular string.

Sequencing for pipe handling

A method sequence for handling tubulars into or out of a wellbore, the method comprising: moving a tubular string into or out of a wellbore via a top drive; moving tubular stands to and from a setback position and a stand handoff position via a transfer bridge racker and a setback guide arm; moving tubular stands to and from the stand handoff position and a well center position via a tubular delivery arm and a lower stabilizing arm; building stands and breaking down stands offline via a mousehole and operating a roughneck on joints between the tubular stands and the tubular string.

SYSTEM AND METHOD FOR HANDLING A KELLY USING A TOP DRIVE
20210079761 · 2021-03-18 ·

A system for performing a drilling operation includes a top drive, an adapter configured to be connected to the top drive, and a kelly configured to be connected to the adapter. The top drive is configured to lift the kelly, move the kelly laterally with respect to a well center, and position the kelly in a rotary device.

SEQUENCING FOR PIPE HANDLING

A method sequence for handling tubulars into or out of a wellbore, the method comprising: moving a tubular string into or out of a wellbore via a top drive; moving tubular stands to and from a setback position and a stand handoff position via a transfer bridge racker and a setback guide arm; moving tubular stands to and from the stand handoff position and a well center position via a tubular delivery arm and a lower stabilizing arm; building stands and breaking down stands offline via a mousehole and operating a roughneck on joints between the tubular stands and the tubular string.

SEQUENCING FOR PIPE HANDLING

A method sequence for handling tubulars into or out of a wellbore, the method comprising: moving a tubular string into or out of a wellbore via a top drive; moving tubular stands to and from a setback position and a stand handoff position via a transfer bridge racker and a setback guide arm; moving tubular stands to and from the stand handoff position and a well center position via a tubular delivery arm and a lower stabilizing arm; building stands and breaking down stands offline via a mousehole and operating a roughneck on joints between the tubular stands and the tubular string.

Sequencing for pipe handling

A method sequence for handling tubulars into or out of a wellbore, the method comprising: moving a tubular string into or out of a wellbore via a top drive; moving tubular stands to and from a setback position and a stand handoff position via a transfer bridge racker and a setback guide arm; moving tubular stands to and from the stand handoff position and a well center position via a tubular delivery arm and a lower stabilizing arm; building stands and breaking down stands offline via a mousehole and operating a roughneck on joints between the tubular stands and the tubular string.

Sequencing for pipe handling

A method sequence for handling tubulars into or out of a wellbore, the method comprising: moving a tubular string into or out of a wellbore via a top drive; moving tubular stands to and from a setback position and a stand handoff position via a transfer bridge racker and a setback guide arm; moving tubular stands to and from the stand handoff position and a well center position via a tubular delivery arm and a lower stabilizing arm; building stands and breaking down stands offline via a mousehole and operating a roughneck on joints between the tubular stands and the tubular string.

SEQUENCING FOR PIPE HANDLING

A method sequence for handling tubulars into or out of a wellbore, the method comprising: moving a tubular string into or out of a wellbore via a top drive; moving tubular stands to and from a setback position and a stand handoff position via a transfer bridge racker and a setback guide arm; moving tubular stands to and from the stand handoff position and a well center position via a tubular delivery arm and a lower stabilizing arm; building stands and breaking down stands offline via a mousehole and operating a roughneck on joints between the tubular stands and the tubular string.