E21B7/005

CONSTRUCTION MACHINE FOR SPECIAL CIVIL ENGINEERING

A construction machine for special civil engineering, includes a leader on which an advancing carriage is guided, which carriage has a holder for a work device, in particular a drilling implement or pile-driving implement, and which carriage is connected with a first drive, by way of which it can be moved along the leader. An additional auxiliary carriage is arranged on the leader, which carriage can be moved along the leader by way of a second drive, wherein at least one actuator and/or at least one sensor is/are arranged on the auxiliary carriage.

Ratcheting auger brace device
11624236 · 2023-04-11 ·

A ratcheting auger bracing device having a support frame with spaced-apart elongated side bars and first and second end bars connecting the side bars, and a pair of pivotable braces each having a proximal hinge end secured pivotally to and around the end bars of the support frame, a distal end bar, and a pair of opposed arms connecting the distal end bar to the proximal hinge end. The opposed arms are angled downwardly, acing the shaft of the auger section, to provide improved operation of the ratcheting auger bracing device in muddy operation conditions. An elevating frame provides an elevating base and legs that elevate the support frame and the hinged pair of pivotable braces at a distance above the ground level, and positions the hinged ends of the pivotable braces a distance above the ground level that avoids or prevents mud that may pool around the well hole.

Ram accelerator augmented drilling system

Systems for drilling or tunneling include an assembly for accelerating a projectile into a region of geologic material. An interaction between the projectile and the geologic material extends a borehole and forms debris. The debris may be reduced in size by moving the debris to a crushing device. The reduced-size debris is then moved toward the surface using fluid movement. Water jets or other types of devices may be used to cut or deform a perimeter of a region of geologic material before the projectile is accelerated to control the shape of the borehole and the manner in which debris is broken from the geologic material.

Post hole digger

A post hole digger couples to the power take-off (PTO) shaft of a tractor and uses rotation from the PTO shaft to rotate an auger. A top support arm rotatably coupled to the top pin of the tractor's three point hitch supports the gearbox that translates rotation to the auger. A support frame extends upwardly from the right and left lift arms of the three point hitch and inwardly to support the top support arm from beneath. The support frame is shaped generally as an inverted “U,” with space created between the right and left lift arms to prevent interference with the rotating shaft that translates rotation from the PTO shaft to the gearbox. A shield coupled to the gearbox covers the moving parts of the joint between the rotating shaft and the gearbox and protects users during use of the auger.

Earth auger and pole machine, and pole installation method

Described herein is an earth auger and pole machine for automated installation of poles in earth banks of access roads to open-pit mines. The earth auger and pole machine is fitted with a mechanic boom comprised of a first link and a second link. The first link has an end attached to a base fixed to a conveyor vehicle, and the other end coupled to the second link. The second link comprises a magazine for loading the poles, an auger system to drill the ground, and an installer to place the poles into the hole. This document also describes a method for installing poles in sequence by using the earth auger and pole machine.

RAM ACCELERATOR AUGMENTED DRILLING SYSTEM
20220056763 · 2022-02-24 ·

Systems for drilling or tunneling include an assembly for accelerating a projectile into a region of geologic material. An interaction between the projectile and the geologic material extends a borehole and forms debris. The debris may be reduced in size by moving the debris to a crushing device. The reduced-size debris is then moved toward the surface using fluid movement. Water jets or other types of devices may be used to cut or deform a perimeter of a region of geologic material before the projectile is accelerated to control the shape of the borehole and the manner in which debris is broken from the geologic material.

Steering head for an auger casing
09816321 · 2017-11-14 · ·

A steering head for use with a casing, the steering head having a body with a first body end with a lead edge, a second body end with a rear edge, and a body surface extending from the lead edge to the rear edge, an outer tube with an internal side generally facing the body surface, the outer tube extending from the first body end to the second body end, and a steering flap disposed on an external side of the outer tube having a first flap face facing radially inwardly and a second flap face facing radially outwardly. A fluid dispenser is disposed in a void defined between the outer tube and the body.

Construction Method and Device for Execution of a Cast In-Situ Pile with Multiple Diameters Decreasing with Depth
20220145567 · 2022-05-12 ·

This invention is detailing a construction method for a cast in-situ pile having an upper section with a larger diameter and at least one subsequent section with a smaller diameter, and a drilling device equipped with continuous flights which allows the construction of one pile having multiple diameters using the innovative construction method in a single continuous drilling phase while each drilling tool is penetrating through the soil in one pass.

The drilling tool according to the invention has a central hollow space that allows accommodation through it of at least one another smaller diameter drilling tool that can drill continuously and can be coupled by means of a coupling-decoupling device in a specific manner to the other drilling tool in order to act as a fixed assembly, at any given position in relation to the smaller drilling tool length and rotating position.

TUNNELING AND MINING METHOD USING PRE-CONDITIONED HOLE PATTERN
20220145759 · 2022-05-12 ·

Systems for forming or extending a tunnel or shaft within geologic material may include a ram accelerator assembly for accelerating one or more projectiles into geologic material to weaken a region of the geologic material. The projectile(s) pre-condition the geologic material, such as by forming one or more holes in a central region of the material or to define a perimeter of the region to be displaced. A cutting tool or subsequent projectile impacts may then be used to remove the weakened material. The voids formed by the first projectile(s) cause compressive forces from subsequent impacts or cutting operations to be converted to tension forces that more efficiently break geologic material, which may fall into the voids created by the first projectile(s). The voids created by the projectile impacts may also control the material that is removed and the shape of a resulting section of the tunnel or shaft.

Arrangement of a ground drilling device, method for operating a ground drilling device and use of an arrangement of a ground drilling device
20220243533 · 2022-08-04 ·

Arrangement of a ground drilling device for the pushing or pulling introduction of a drill string into the ground, wherein the arrangement has a frame and a carriage which can be moved back and forth relative to the frame with a translatory movement, wherein at least one rolling element is provided, which is configured to roll during the translatory movement of the carriage, and a conversion device is provided, which is connected to the rolling element and is configured to convert the rotary movement of the rolling element into a rotary movement of the drill string.