E21D9/06

Directional Drilling-Exploring-Monitoring Integrated Method for Guaranteeing Safety of Underwater Shield Tunnel

A directional drilling-exploring-monitoring integrated method for guaranteeing safety of an underwater shield tunnel includes: drilling a small-diameter borehole below a water area, and establishing an initial geological model; reaming the small-diameter borehole into a large-diameter borehole, placing a parallel electrical method (PEM) power cable and a monitoring optical fiber cable into the large-diameter borehole, acquiring zero field data, primary field data and secondary field data through carbon rod measurement electrodes before tunnel excavation, and processing the data with an existing inversion method to form an inversion image, thereby obtaining a refined geological model of a stratum; starting the tunnel excavation, and respectively acquiring a disturbance condition of rock and soil and a sedimentation and deformation condition of rock and soil around the tunnel during the excavation, thereby implementing safety excavation of the tunnel; and continuously monitoring the tunnel and the surrounding rock and soil in later use of the tunnel.

Directional Drilling-Exploring-Monitoring Integrated Method for Guaranteeing Safety of Underwater Shield Tunnel

A directional drilling-exploring-monitoring integrated method for guaranteeing safety of an underwater shield tunnel includes: drilling a small-diameter borehole below a water area, and establishing an initial geological model; reaming the small-diameter borehole into a large-diameter borehole, placing a parallel electrical method (PEM) power cable and a monitoring optical fiber cable into the large-diameter borehole, acquiring zero field data, primary field data and secondary field data through carbon rod measurement electrodes before tunnel excavation, and processing the data with an existing inversion method to form an inversion image, thereby obtaining a refined geological model of a stratum; starting the tunnel excavation, and respectively acquiring a disturbance condition of rock and soil and a sedimentation and deformation condition of rock and soil around the tunnel during the excavation, thereby implementing safety excavation of the tunnel; and continuously monitoring the tunnel and the surrounding rock and soil in later use of the tunnel.

Shield Sealing Device and Shield Sealing Method
20230037876 · 2023-02-09 ·

The present disclosure provides a shield sealing device and a shield sealing method, a fender post is arranged at a shield receiving opening, the shield sealing device is mounted on the fender post, and the shield sealing device comprises: an elastic inner ring, an inner wall of the elastic inner ring adapting to an outer wall of a cutter head of a shield tunneling machine; and a plurality of control units, the plurality of control units being mounted on the fender post, the plurality of control units being arranged in a circumferential direction of the elastic inner ring at intervals, and a driving end of the control part pressing against an outer side of the elastic inner ring so as to extrude or release the elastic inner ring.

Device and method for continuously driving a tunnel

In a device and a method for continuously driving a tunnel along a desired setpoint trajectory there is provision to influence pressing forces which are applied to installed tubbing segments by compactors using a control circuit, wherein, during the driving and during the installation of tubbing rings, an actual trajectory of the device remains in a region which is permissible for maintaining the desired set point trajectory.

Test method based on test system for five-dimensional space effects of ground surface settlement caused by dual-mode shield construction

A test method based on a test system for five-dimensional space effects of ground surface settlement caused by dual-mode shield construction is provided. First, manufacturing a formation similarity material model; then, laying ground surface monitoring points in longitudinal and transverse direction; installing a shield machine model, and performing shield construction, the shield machine model adopts a double-shield body mode; performing five-dimensional monitoring during shield construction; designing an observation method for ground surface settlement data in step length and time dimension, and acquiring five-dimensional data in combination with three-dimensional scanning; and finally, performing deformation information processing according to the monitored data, so as to realize an acquisition of the five-dimensional data.

TUNNEL EXCAVATION DEVICE
20230212948 · 2023-07-06 ·

A tunnel excavation device includes a first body portion and an erector device. The first body portion includes a cutter head and a support portion rotatably supporting the cutter head. The erector device is configured to transport a supporting member toward an excavated wall surface. The erector device is provided on the support portion. The erector device includes a ring portion holding the supporting member, and a posture changing device configured to change an angle formed by a center axis of the ring portion and a rotation axis of the cutter head in a plan view.

Method and Apparatus for Controlling Stratum Deformation in Shield Construction Process, and Non-volatile Storage Medium

A method and apparatus for controlling stratum deformation in a shield construction process, a non-volatile storage medium, and a processor are disclosed. The method includes: monitoring settlement characteristic parameters in a shield construction process; predicting a settlement proportion according to the settlement characteristic parameters, the settlement proportion being a ratio between a predicted settlement value and a corresponding settlement threshold; and determining construction parameters in the shield construction process according to the settlement proportion. In the method, a settlement proportion is predicted through settlement characteristic parameters monitored in a shield construction process, and then appropriate construction parameters are determined according to the settlement proportion, so that the construction parameters in the shield construction process can be corrected in real time, and the safety and scientificity of stratum deformation control in shield construction can be ensured.

Method and Apparatus for Controlling Stratum Deformation in Shield Construction Process, and Non-volatile Storage Medium

A method and apparatus for controlling stratum deformation in a shield construction process, a non-volatile storage medium, and a processor are disclosed. The method includes: monitoring settlement characteristic parameters in a shield construction process; predicting a settlement proportion according to the settlement characteristic parameters, the settlement proportion being a ratio between a predicted settlement value and a corresponding settlement threshold; and determining construction parameters in the shield construction process according to the settlement proportion. In the method, a settlement proportion is predicted through settlement characteristic parameters monitored in a shield construction process, and then appropriate construction parameters are determined according to the settlement proportion, so that the construction parameters in the shield construction process can be corrected in real time, and the safety and scientificity of stratum deformation control in shield construction can be ensured.

SYSTEM AND METHOD FOR PHASED ARRAY SOUND WAVE ADVANCED GEOLOGICAL EXPLORATION FOR SHIELD TUNNELING MACHINE
20220390635 · 2022-12-08 · ·

The present invention discloses a system and method for phased array sound wave advanced geological exploration for a shield tunneling machine. The system includes a phased array sound wave emitting and receiving apparatus, a probe automatic telescopic apparatus, an automatic protection and cleaning apparatus, and a signal processing and imaging system. Sonic probes are installed on a side wall of a main spoke, opposite to a rotation direction, of a cutterhead of the shield tunneling machine, on the basis of automatic detection of a telescopic state and a contact state, sonic array probes are enabled to make contact with a tunnel face by a hydraulic push rod, a focus sound wave is emitted by using a phased array emitting technology, and a reflected wave signal with front geological information reflected from the front of the tunnel face is received. A scanning direction of a sound wave beam is controlled and changed continuously through a host system, on the premise of obtaining a suspected abnormal body position, the suspected position is imaged in detail by using a focusing image till scanning of a whole two-dimensional section is completed, then the cutterhead is rotated to change an arrangement direction of an array to continue scanning of a next two-dimensional section, and finally three-dimensional geological exploration in front of the tunnel face is realized.

Method and system of constructing an underground tunnel
11591908 · 2023-02-28 · ·

Long tunnels of many kilometres are likely to pass through a range of geologies which may cause problems. The present invention seeks to overcome the disadvantages of the prior art by: drilling a first bore 10 along a first predetermined path, the first bore having a length of at least 25 m; drilling a plurality of second bores 20 along respective second predetermined paths, each substantially parallel to the first predetermined path in order to define a substantially prism-shape region therebetween; and excavating material within the substantially prism-shape region to form a tunnel. In this way, data from drilling the first bore 10 and the plurality of second bores 20 can be recorded and used to inform operators as to the types of material through which they will be excavating. Thus, a more complete view of the underlying geology can be achieved before beginning excavations.