F16L1/205

System and method for deploying coils of spoolable pipe

A system for deploying a coil of spoolable pipe from a vessel includes a first tower configured to move longitudinally and transversely along a first track coupled to the vessel, a second tower configured to move longitudinally along a second track coupled to the vessel, and a coil drum assembly coupled to the first tower. The first tower is configured to insert the coil drum assembly transversely into an interior channel of the coil when the coil drum assembly is in a retracted position, the coil drum assembly is configured to support the coil when the coil drum assembly is in an extended position and rotate during deployment of the spoolable pipe, and the first tower and the second tower are configured to move the coil drum assembly vertically.

SYSTEM AND METHOD FOR DEPLOYING COILS OF SPOOLABLE PIPE
20230081347 · 2023-03-16 ·

A system for deploying a coil of spoolable pipe from a vessel includes a first tower configured to move longitudinally and transversely along a first track coupled to the vessel, a second tower configured to move longitudinally along a second track coupled to the vessel, and a coil drum assembly coupled to the first tower. The first tower is configured to insert the coil drum assembly transversely into an interior channel of the coil when the coil drum assembly is in a retracted position, the coil drum assembly is configured to support the coil when the coil drum assembly is in an extended position and rotate during deployment of the spoolable pipe, and the first tower and the second tower are configured to move the coil drum assembly vertically.

MARINE PIPELINE INSTALLATIONS

A reel support apparatus (100) for supporting a pipeline storage reel (102) on a vessel (104) is disclosed. A method for supporting a pipeline storage reel (102) on a vessel (104) using the reel support apparatus (100) is also disclosed. The reel support apparatus (100) comprises a hub body (112) for locating within a hollow central bore (140) of a pipeline storage reel (102) and a plurality of discrete roller elements (114), spaced apart at locations on an outer surface of the hub body (112). In use, a pipeline storage reel (102) is supported by the plurality of discrete and spaced apart roller elements (114).

Marine pipeline installation system and method

A marine pipeline installation system for laying an offshore pipeline and/or installing a subsea riser includes a pipeline launch tower, a pipeline guide provided at an elevated position for guiding said pipeline to the pipeline launch trajectory along said tower, one or more tensioners, an abandonment and recovery (A&R) system including at least one A&R cable and associated A&R winch and a sheave arrangement with one or more sheaves supported by the pipeline launch tower at an upper position thereof. An auxiliary trolley is provided which is adapted to support the weight of the launched pipeline and which is movable along a rail in the pipeline launch trajectory when the one or more tensioner frames are in the retracted non-operable position, from a position above the uppermost tensioner to a position below the lowermost tensioner, the rail being supported by the pipeline launch tower.

Spoolable swivel

A spoolable swivel, methods, and systems for coupling a first and second length of coiled tubing. The spoolable swivel can include an inner tubular element and an outer tubular element. The inner tubular element and the outer tubular element can both have dimpled distal ends and races on their proximal ends, defining one or more annular voids for swivel bearings.

Marine pipelaying and method for abandonment of a pipeline

A method is provided for installing a pipeline on the seabed from a marine pipelaying vessel, including initiation, pipelaying, and abandonment of the pipeline. An embodiment of the abandonment of the pipeline includes halting pipelaying and engaging a hang-off clamp with the pipeline at a position below one or more tensioners, transferring the weight onto the hang-off clamp and holding the seagoing pipeline in the firing line, severing the pipeline, connecting the initiation cable to the lower end of the pipeline held by the one or more tensioners, transferring pipeline tension onto the initiation cable, releasing the one or more tensioners, so that a section of the pipeline is held in the firing line between the pipeline diverter and the initiation cable, vacating the firing line by at least displacing both the pipeline diverter and the initiation cable sheave and thereby displacing said section of the pipeline from the firing line, arranging the A&R cable in the firing line, connecting the A&R cable to the upper end of the seagoing pipeline held in the firing line, releasing the hang-off clamp, and operating the A&R winch and thereby lowering the pipeline onto the seabed.

PIPE HANDLING SYSTEM AND METHOD OF JOINING PIPE SECTIONS
20170276260 · 2017-09-28 · ·

A method of joining a first pipe section to a second pipe section includes positioning the two pipe sections in an end-to-end configuration to define therebetween a joint to be welded, measuring the degree of alignment of the pipe sections when they are in the end-to-end configuration in a position ready for welding, ascertaining the relative movement required of the pipe sections in order to improve their alignment, effecting the relative movement so ascertained, and welding together the two pipe sections. The method may include the use of geometric data of the end of the pipes in order to ascertain the relative movement required of the pipe sections. A control unit may be used to calculate, using such data, a target orientation that lines up the pipe sections. The measuring step may be performed using, for example, a laser or a camera and backlight.

MARINE PIPELINE INSTALLATION VESSEL AND METHOD FOR LAYING AN OFFSHORE RIGID PIPELINE IN THE SEA

A marine pipeline installation vessel and a method are provided for laying an offshore rigid pipeline in the sea, the vessel at least being adapted to carry out the rigid reel lay method. The vessel includes at least one vertical storage reel for the storage of a spooled rigid pipeline. A left and right reel support structure are provided to support the weight of the at least one storage reel. The left and right support structures are embodied to form a pivoting structure allowing an angular adjustment of the horizontal reel axis about a vertical axis to alter the angular position of the at least one storage reel.

Device for laying an elongate element in a stretch of water, associated installation and associated method
09746104 · 2017-08-29 · ·

This device comprises a drum (42) to be driven in rotation about a central axis (B-B′), wherein the drum (42) defines a circumferential casing (50) for winding the elongate element around the central axis (B-B′), wherein the elongate element is intended to form at least one turn around the central axis (B-B′) on the circumferential casing (50). It comprises a mechanism (44) for driving the turn(s) of the elongate element along the circumferential casing (50). The drive mechanism (44) comprises at least one assembly (80) following movement of the turn in a direction of movement (D) forming a non-zero angle with the local axis of the turn, taken at a contact region of the turn on the movement assembly (80).

NONRESIDENT SYSTEM AND METHOD FOR DEPRESSURISING SUBSEA APPARATUS AND LINES

The present invention provides a nonresident system for depressurizing subsea apparatus and lines comprising a depressurizing tool (5) adapted for being coupled to an ROV interface (6) of a subsea apparatus, wherein the depressurizing tool (5) is coupled to an ROV (4), wherein: the ROV interface (6) comprises a first pipeline (6a) for connection to a first hydrocarbon transport line (8), a second pipeline (6b) for connection to second hydrocarbon transport line (9), and a connection mandrel (6d); and the depressurizing tool (5) comprises a suction line (5a) adapted for being connected to the first pipeline (6a) for connection to the first hydrocarbon transport line; a discharge line (5b) adapted for being connected to the second pipeline (6b) for connection to the second hydrocarbon transport line; a pump (5c); and a connector (5d) adapted for being connected to the connection mandrel (6d) of the ROV interface (6). A method is also provided for depressurizing subsea apparatus and lines, comprising the steps of: removing a blind cap (15) from an ROV interface (6) with aid of an ROV (4); coupling a depressurizing tool (5) to the ROV interface (6) of a subsea apparatus (10); suction and removal of fluid from a first hydrocarbon transport line, wherein the first hydrocarbon transport line comprises hydrate formation; and pressurizing and reinjecting the fluid into a second hydrocarbon transport line.