F22B37/483

Steam-generating unit of dual circuit reactor with purge and drain system

The steam generating unit of dual circuit reactor with blowdown and drain system is implemented in the close loop, without any conventional blowdown expansion tanks and is designed for maximum pressure of the steam generator (SG) working medium. The SG blowdown water is combined into a single line, cooled down in the regenerative heat exchanger, then in the blowdown aftercooler and drain cooling line and taken out of the tight shell. Out of the tight shell, the SG blowdown water is supplied for treatment to the SG blowdown water treatment system designed for maximum pressure of the steam generator (SG) working medium. After treatment, the water returns to the tight shell and, via the regenerative heat exchanger, to the feed pipelines of each SG. The invention provides increased SG blowdown that leads to the accelerated chemical condition normalization even with considerable deviations.

Method for inspecting core shroud using remote operated vehicle (ROV)

The method includes installing a system for inspecting the core shroud on the core shroud, driving the system horizontally around the core shroud, and using a sensor of the system to inspect the core shroud, where the system includes a trolley, an arm, a tether, and a remotely operated vehicle (ROV) for inspecting the core shroud. The ROV includes a body configured to be operatively connected to the tether, and the sensor is configured to be operatively connected to the body, and configured to provide inspection information of the core shroud. The arm is configured to be operatively connected to the trolley. The ROV is configured to be operatively connected to the arm via the tether, and the tether is configured to provide vertical position information for the ROV relative to the outer surface of the core shroud.

Method and apparatus for manipulating equipment inside a steam generator

A method and apparatus for manipulating a tool within the secondary side of a steam generator having a tube sheet with a tube bundle having a plurality of heat exchange tubes extending from the tube sheet in rows with an annulus extending around the heat exchange tubes on a periphery of the tube bundle, between the tubes and a wrapper which surrounds the tube bundle. A robot is introduced into the annulus and extends a probe with a tool across selected lanes between the rows of tubes. A method and apparatus is also disclosed for cleaning sludge from the top of a tube sheet that includes introducing a moveable suction apparatus having attached vacuum inlets into either the no tube lane or the circumferential annulus and sludge vacuuming the top of the tube sheet.

APPARATUS AND METHOD OF REMOVING FOREIGN SUBSTANCES FROM STEAM GENERATOR
20230138837 · 2023-05-04 ·

An apparatus for removing foreign substances around a heating tube of a steam generator is proposed. The apparatus includes a universal machine unit configured to hold the foreign substances, a connecting rod unit including a distal end connecting rod and a connecting rod part, a connecting rod moving unit configured to supply the connecting rod unit into the heating tube to move the connecting rod unit, a connecting rod supply unit provided to sequentially supply the plurality of connecting rods to the connecting rod moving unit, an image-capturing unit configured to be moved to a point where the foreign to substances are located to capture an image of the foreign substances, and a controller connected to the universal machine unit, the connecting rod moving unit, and the connecting rod supply unit to control operations thereof.

Commissioning power plants

Improved steamblow commissioning of a steam plant with steam discharged to the condenser and increased use of permanent piping instead of temporary piping with quenching/desuperheating and providing a low back pressure environment to enable aggressive steam blow cleaning.

STEAM-GENERATING UNIT OF DUAL CIRCUIT REACTOR WITH PURGE AND DRAIN SYSTEM

The steam generating unit of dual circuit reactor with blowdown and drain system is implemented in the close loop, without any conventional blowdown expansion tanks and is designed for maximum pressure of the steam generator (SG) working medium. The SG blowdown water is combined into a single line, cooled down in the regenerative heat exchanger, then in the blowdown aftercooler and drain cooling line and taken out of the tight shell. Out of the tight shell, the SG blowdown water is supplied for treatment to the SG blowdown water treatment system designed for maximum pressure of the steam generator (SG) working medium. After treatment, the water returns to the tight shell and, via the regenerative heat exchanger, to the feed pipelines of each SG. The invention provides increased SG blowdown that leads to the accelerated chemical condition normalization even with considerable deviations.

METHOD FOR INSPECTING CORE SHROUD USING REMOTE OPERATED VEHICLE (ROV)

The method includes installing a system for inspecting the core shroud on the core shroud, driving the system horizontally around the core shroud, and using a sensor of the system to inspect the core shroud, where the system includes a trolley, an arm, a tether, and a remotely operated vehicle (ROV) for inspecting the core shroud. The ROV includes a body configured to be operatively connected to the tether, and the sensor is configured to be operatively connected to the body, and configured to provide inspection information of the core shroud. The arm is configured to be operatively connected to the trolley. The ROV is configured to be operatively connected to the arm via the tether, and the tether is configured to provide vertical position information for the ROV relative to the outer surface of the core shroud.

Flexible lance for machining or inspecting a tubesheet of a boiler
11060718 · 2021-07-13 · ·

The invention relates to a flexible lance for machining or inspecting a tubesheet of a boiler, having a first strip made of a flexible, metallic material and a second strip made of a flexible, metallic material, wherein the second strip is arranged on the first strip in the longitudinal direction, and wherein at least the second strip has a shaped portion extending in the longitudinal direction for receiving a supply line for a machining or inspection head arranged at the free end of the flexible lance, and wherein the first strip is connected to the second strip such that an open side of the shaped portion is covered by the first strip so as to form a guide channel, and wherein at least one edge region of the flexible lance, extending in the longitudinal direction, is formed only by the first strip or the second strip.

Remotely operated vehicles, systems, and methods for inspecting core shrouds

A remotely operated vehicle (ROV) for inspecting a core shroud having an outer surface may include: a body configured to be operatively connected to a tether; and/or a sensor, configured to be operatively connected to the body, and configured to provide inspection information of the shroud. The tether may be configured to provide vertical position information for the ROV relative to the outer surface. A system for inspecting a core shroud may include: a trolley; an arm; the tether; and/or the ROV. The arm may be configured to be operatively connected to the trolley. The ROV may be configured to be operatively connected to the arm via the tether. A method for inspecting a core shroud may include: installing a system for inspecting the shroud on the shroud; driving the system horizontally around the shroud; and/or using a sensor of the system to inspect the shroud.

COMMISSIONING POWER PLANTS

Improved steamblow commissioning of a steam plant with steam discharged to the condenser and increased use of permanent piping instead of temporary piping with quenching/desuperheating and providing a low back pressure environment to enable aggressive steam blow cleaning.