Well abandonment and slot recovery
11230899 · 2022-01-25
Assignee
Inventors
Cpc classification
E21B29/00
FIXED CONSTRUCTIONS
E21B29/005
FIXED CONSTRUCTIONS
International classification
E21B29/00
FIXED CONSTRUCTIONS
E21B23/04
FIXED CONSTRUCTIONS
Abstract
A downhole casing cutting and removal assembly (10) and method of use thereof, the assembly comprising a work string (23) with a cutting mechanism (18) and plurality of resettable anchor mechanisms (20B-20D). The arrangement allows a test pull to be made following the cut by an anchor mechanism closer to the upper end of the cut casing section than an anchor mechanism (20B-20D) located close to the cutting mechanism. Time is thus saved by not having to raise and lower a single anchor mechanism (20B-20D) between the cutting position and the upper end of the cut casing section to undertake a test pull.
Claims
1. A method of removing casing from a wellbore, comprising the following steps, performed on a single trip, in order: (a) providing a work string including: a cutting mechanism configured to cut a tubular in the wellbore; and a first anchor mechanism and a second anchor mechanism, each anchor mechanism configured to grip an inner wall of the tubular in a wellbore; and wherein the cutting mechanism is positioned towards a lower end of the work string and the first and the second anchor mechanisms are spaced apart along the work string above the cutting mechanism, the first anchor mechanism being arranged between the cutting mechanism and the second anchor mechanism; (b) running the work string in the well bore to position the cutting mechanism at a first depth in the tubular; (c) actuating the cutting mechanism to cut the tubular to form a cut section of tubular above the position of the cutting mechanism; (d) actuating the second anchor mechanism to grip the cut section of tubular; (e) pulling the work string to check that the cut section of tubular is free; (f) releasing the second anchor mechanism; (g) pulling the work string up through the wellbore so as to position the first anchor mechanism towards an upper end of the cut section of tubular; (h) actuating the first anchor mechanism to grip the cut section of tubular; and (i) pulling the work string from the well bore to remove the cut section of tubular from the wellbore.
2. A method of removing casing from a wellbore as claimed in claim 1 wherein the lowermost anchor mechanism is mounted above and in proximity to the cutting mechanism.
3. A method of removing casing from a wellbore as claimed in claim 2 wherein the method includes providing the lowermost anchor mechanism and the cutting mechanism as a bottom hole assembly.
4. A method of removing casing from a wellbore as claimed in claim 3 wherein the method includes providing a bottom hole assembly further including a packer.
5. A method of removing casing from a wellbore as claimed in claim 1 wherein in step (d), the work string is moved to position the second anchor mechanism towards the upper end of the cut section of casing.
6. A method of removing casing from a wellbore as claimed in claim 1 which further includes the step of actuating the lowermost anchor mechanism during step (c).
7. A method of removing casing from a wellbore as claimed in claim 1 wherein, in the event that the cut section of tubing is not free in step (e), the method includes these additional steps between steps (f) and (g): f(1) positioning the cutting mechanism at a shallower depth in the tubular; f(2) actuating the cutting mechanism to cut the tubular to form a shorter cut section of tubular above the position of the cutting mechanism; f(3) actuating the second anchor mechanism to grip the shorter cut section of tubular; f(4) pulling the work string to check that the cut section of tubular is free; and f(5) releasing the second anchor mechanism.
8. A method of removing casing from a wellbore as claimed in claim 7 wherein the method includes the step of lowering the work string in step f(1).
9. A method of removing casing from a wellbore as claimed in claim 7 wherein the method includes the step of actuating the first anchor mechanism during step f(2).
10. A method of removing casing from a wellbore as claimed in claim 7 wherein the method includes the step of raising the work string between steps f(2) and f(3).
11. A method of removing casing from a wellbore as claimed in claim 1 wherein the method includes the step of locating a third anchor mechanism on the work string with the third anchor mechanism located between the first and second anchor mechanisms.
12. A method of removing casing from a wellbore as claimed in claim 11 wherein in the event that the cut section of tubing is not free in step (e), the method includes these additional steps between steps (f) and (g): f(1) positioning the cutting mechanism at a shallower depth in the tubular; f(2) actuating the cutting mechanism to cut the tubular to form a shorter cut section of tubular above the position of the cutting mechanism; f(3) actuating the third anchor mechanism to grip the shorter cut section of tubular; f(4) pulling the work string to check that the cut section of tubular is free; and f(5) releasing the third anchor mechanism.
13. A method of removing casing from a wellbore as claimed in claim 12 wherein the additional steps are repeated at successively shallower depths and with other anchor mechanisms on the work string until a cut section of tubular is free.
14. A method of removing casing from a wellbore as claimed in claim 1 wherein the method comprises hydraulically or pneumatically actuating the anchor mechanisms.
15. A method of removing casing from a wellbore as claimed in claim 1 wherein the method comprises mechanically setting the actuated anchor mechanisms.
16. A method of removing casing from a wellbore as claimed in claim 3 wherein the method comprises setting the anchor mechanisms by providing an upward force or tension to the bottom hole assembly.
17. A method of removing casing from a wellbore as claimed in claim 1 wherein the method comprises actuating the cutting mechanism by pumping a fluid into a bore of the work string and rotating the cutting mechanism to cut the casing.
18. A method of removing casing from a wellbore claimed in claim 17 wherein the cutting mechanism is rotated by rotating the work string.
19. A method as claimed in claim 17 wherein the cutting mechanism is rotated via a downhole motor arranged between the lowermost anchor mechanism and the cutting mechanism.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
(1) There will now be described, by way of example only, various embodiments of the invention with reference to the drawings, of which:
(2)
(3)
(4)
DETAILED DESCRIPTION OF THE INVENTION
(5) Referring initially to
(6) Although shown as four anchor mechanisms 20A-D, there may be two or more, with a lowermost anchor mechanism near the cutting mechanism 18 and a first anchor mechanism 20B spaced apart along the work string 23. Ideally the separation between the lowermost anchor mechanism 20A and the first anchor mechanism 20B is approximately equal to the desired length of casing 14 to be removed from the wellbore 12. The anchor mechanisms 20A-D need not be equally spaced, their separation may be selected so as that when the first anchor mechanism 20B is at an upper end 24 of the casing 14, the cutting mechanism 18 is positioned away from any joints in the casing 14, such as casing collars, which would be more difficult to cut than casing between the joints.
(7) The anchor mechanisms 20A-D need not be identical either, though they must all be actuable downhole to grip and anchor the work string 23 to the casing 14 in the well bore 12. In a preferred embodiment the lowermost anchor mechanism 20A is as described in WO2017046613, incorporated herein by reference and is designed to set grippers 26 against the inner wall 17 of the casing 14 by applying tension to the work string 23. The anchor mechanism 20A also has the feature of being rotatable through when set. In this way, rotation of the work string 23 at surface is transmitted to the cutter mechanism 18 sitting below the anchor mechanism 20A. The remaining anchor mechanisms 20B-D may be alternative designs as would be found in typical casing spears. Such a spear is described in WO2017182549, incorporated herein by reference, and available as the Flow Release Mechanical Spear (FRM) from Ardyne Technologies Limited. The FRM is operated by pulling the spear out of the top of the casing to grip the inner wall of the casing at the upper end of the casing. The spear is released via flow in a through bore of the work string 23. By having differing anchor mechanisms 20A,20B, they can be set independently in the casing 12. All the anchor mechanisms 20A-D must be reversibly set so that they can be released from gripping the inner wall 17 of the casing 14.
(8) The cutting mechanism 18 may be any design of downhole casing cutter. In the preferred embodiment the cutting mechanism 18 is as described in WO2017046613, incorporated herein by reference. In this way, cutting mechanism 18 can be operated independently of lowermost anchor mechanism 20A. The cutting mechanism 18 includes a plurality of blades 30 which are retracted until cutting is required. Fluid pressure in the through bore and/or a drop ball may be used to activate and de-activate the movement of the blades. When extended and the work string 28 rotated, the blades 30 will cut through the casing 14. The blades 30 are sized such that were the casing being removed sits inside an outer casing or liner, only the innermost casing is severed.
(9) In the embodiment described there is also a packer 22 in the bottom hole assembly 28. As is known the art a typical packer 22 comprises a packer element typically made from a material capable of radially expanding when it is axially compressed such as a rubber or other elastomeric material. In the preferred embodiment the packer 22 is as described in GB2548727. This is a mechanical tension-set packer 22 which advantageously can be set rapidly in the event of a kick during casing cutting.
(10) The bottom hole assembly 28 comprising the cutting mechanism 18, lowermost anchor mechanism 20A and packer 22 may be formed integrally on a single tool body or may be constructed separately and joined together by box and pin sections (not shown) as is known in the art. Alternatively, more than one part may be integrally formed and joined to other individual or multiple parts. In a preferred embodiment the bottom hole assembly is the TRIDENT@ system available from Ardyne Technologies Limited.
(11) In use, as is shown in
(12) The work string tool 10, with none of packer 22, anchor mechanisms 20A-E and cutting mechanism 18 having been actuated, is run-in the wellbore 12 and casing 14 until it reaches the cement plug 21. At this point a wellbore integrity test can be performed using the anchor mechanism 20 and the packer assembly 22, if desired. With the cutting mechanism 18, anchor mechanism 20 and packer assembly 22 all held in inactive positions, fluid can be pumped at a fluid pressure below a pre-set threshold through the bore 25 of the drill string 23 to hydraulically activate the drill 19. This does not actuate the cutting mechanism 18, anchor mechanisms 20A-E or the packer assembly 22. The drill 19 is used to dress the cement plug 21. This is as illustrated in
(13) The work string 23 is then positioned such as to locate the knives 30 of the cutting mechanism 18 at a desired location to cut the casing 14 and a first anchor mechanism 20B at an upper end 24 of the casing 14. It will be appreciated that the upper end 24 of the casing 14 may be a significant length of casing and when the first anchor mechanism 20B is set, the string 23 will have to be raised to locate the first anchor mechanism 20B at the end of the casing 14. At this position, the lowermost anchor mechanism 20A is actuated to grip 26 the inner wall 17 of the casing 14 to secure the axial position of the assembly 10 in the wellbore 12.
(14) Once the lowermost anchor mechanism 20A has engaged the casing 14 and is set, as illustrated in
(15) When the cutting mechanism 18 has finished cutting the casing 14, providing a cut 29, the cutting mechanism 18 is deactivated. The knives 30 move to a retracted position. The lowermost anchor mechanism 20A is also unset. There is now a cut section of casing 43 in the wellbore 12. At this time, the first anchor mechanism 20B is actuated to grip 34 the upper end 24 of the cut casing section 43. In order to do this the work string 23 may be adjusted to position the first anchor mechanism 20B at the end of the casing and thereby actuate the grippers 34. Note this is a small adjustment and does not require any breaking out or making up of the work string 23. The FRM spear as described in WO2017182549 advantageously only actuates when a portion is lifted above the end of the casing 14. In this way, the anchor mechanisms 20B-D may be identical and thus the others will not operate when the first anchor mechanism 20B is actuated. This is as illustrated in
(16) With the first anchor mechanism 20B now gripping the cut section of casing 43, the work string 23 is pulled to see if the cut section of casing 43 is free and will lift. If this occurs the first anchor mechanism 20B is released. The work string 23 is then pulled through the cut section of casing 43 to position the lowermost anchor mechanism 20A at the upper end 24 of the cut section of casing 43. The lowermost anchor mechanism 20A is then set again to grip 26 the inner wall 17 at the upper end 24. This is as illustrated in
(17) By pulling the work string 23 from the wellbore 12, the cut section of casing 43 is removed from the wellbore 12. The wellbore 12 now contains the casing stub 45 and cement plug 21 as shown in
(18) While it will be recognised that the cut section of casing 43 could have been removed in the arrangement of
(19) If, when the upward pull is applied to the cut section of casing 43 in the arrangement of
(20) The work string 23 is again pulled to see if the now shorter section 44 of cut casing is free and will lift. If this occurs the second anchor mechanism 20C is released. The work string 23 is then pulled through the cut section of casing 44 to position the lowermost anchor mechanism 20A at the upper end 24 of the cut section of casing 44. The lowermost anchor mechanism 20A is then set again to grip 26 the inner wall 17 at the upper end 24. This is as illustrated in
(21) By pulling the work string 23 from the wellbore 12, the shorter cut section of casing 44 is removed from the wellbore 12. The wellbore 12 now contains the casing stub 45, a cut section of stuck casing 46 and the cement plug 21 as shown in
(22) By testing a pull with the anchor mechanism 20B and the test failing we have saved the time in breaking up the work string 23 to raise the lowermost anchor mechanism 20A to the upper end 24 of the cut casing section 43 and then, following a failed test pull, making up the work string 23 to run the string 23 back through the cut casing section 43 to a new location to make the second shallower cut 40.
(23) It will be realised that in the event that the second anchor mechanism 20C fails to pull the shorter cut section of casing 44, then the steps shown in
(24) Reference is now made to
(25) In this embodiment, the spacing of components along the work string 23 and with respect to the casing 14 has been arranged according to distances within the wellbore 12. In this case an operator will predetermine that in the event that a pull cannot be made after the first cut, the second cut will be a set distance A above the first cut, say 100 m for example. The second anchor mechanism 20B is then positioned on the work string 23 so that when the cutting mechanism 18 is at the first depth for making the first cut, the second anchor mechanism 20B is positioned below the upper end 24 of the casing 14, by a distance C equal to A+B, were B is a short distance, say 3 m in our example. Significantly, B will be much smaller than A. This is as illustrated in
(26) With the cutting mechanism 18 at the first depth, the first anchor mechanism 20A is set to grip the casing 14 and hold it in tension while the first cut 29 is made using cutting blades 30, as illustrated in
(27) In the event that the cut section of casing 43 cannot be pulled by raising the second anchor mechanism 20B, the second anchor mechanism 20B is unset and the work string is lowered by the distance C. The cutting mechanism 18 will now be positioned at the second depth for the second cut 40, with the second depth being shallower than the first. The second cut 40 will be a distance A above the first cut as required. The work string 23 will only have had to be lowered by a short distance B, to position the cutting mechanism 18 at the second depth. This is as illustrated in
(28) Once the second cut is made, the work string 23 need only be raised by the short distance B to set the second anchor 20B at the upper end 24 of the now shorter cut section of casing 44. This will be as illustrated as for
(29) By pulling the work string 23 from the wellbore 12, the shorter cut section of casing 44 is removed from the wellbore 12. The wellbore 12 now contains the casing stub 45, a cut section of stuck casing 46 and the cement plug 21 as shown in
(30) In this embodiment it is preferred that the bottom hole assembly 28 is the TRIDENT® System available from Ardyne Technologies Limited. The second anchor mechanism 20B is preferably the FRM spear available from Ardyne Technologies Limited. Advantageously, the short distance B is sufficient to activate and deactivate the FRM spear by entry and exit from the upper end 24 of the cut section of casing 43,44.
(31) The principal advantage of the present invention is that it provides a method of casing cutting and removal in which test pulls can be made following cutting of the casing without having to raise the bottom hole assembly on the work string to the top of the cut casing section for each test.
(32) A further advantage of at least one embodiment of the present invention is that it provides multiple casing spears on a string which can all be identical with only the uppermost spear being actuated when required.
(33) The foregoing description of the invention has been presented for the purposes of illustration and description and is not intended to be exhaustive or to limit the invention to the precise form disclosed. The described embodiments were chosen and described in order to best explain the principles of the invention and its practical application to thereby enable others skilled in the art to best utilise the invention in various embodiments and with various modifications as are suited to the particular use contemplated. Therefore, further modifications or improvements may be incorporated without departing from the scope of the invention herein intended. For example whilst the above embodiments have been described as including a packer, it would be possible for the assembly 10 to operate without inclusion of a packer.